Kayvan Koohestani
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Kayvan Koohestani has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Mani Poshdar
Auckland University of Technology
3 shared publications - Ali Bidhendi
Auckland University of Technology
2 shared publications - Faris Elghaish
Queen's University Belfast
1 shared publication - Ji Won Won1 shared publication
- Johan Ninan
Faculty of Civil Engineering and Geosciences, TU Delft
1 shared publication Michail Kagioglou
School of Engineering Design and Built Environment, Western Sydney University, Sydney, Australia
1 shared publication
Latest Publications
- 20 April 2025
- Published by Springer Nature
- p. 1475-1483
Stakeholder Power Dynamics, a Key to Sustainably Win the Sustainability Game in Construction
- 20 April 2025
- Published by Springer Nature
- p. 1475-1483
Stakeholder Power Dynamics, a Key to Sustainably Win the Sustainability Game in Construction
- Open Access
- 1 July 2024
- Published by IGLC
- p. 743-754
Enhancing Lean Construction Through Innovative Technology: A Focus on Virtual Reality in Construction
This study delineates the integration of Virtual Reality (VR) within Lean Construction, emphasising its application across the philosophy, principles, methods, and tools of Lean Construction. By conducting a systematic literature review, this research considers the utilisation of VR to enhance construction processes, specifically focusing on its role in mitigating waste, maximising value, continuous improvement, and respect for people. The investigation reveals VR's capacity to bridge the theoretical and practical aspects of Lean Construction, offering a novel perspective on its implementation. The results demonstrate VR's potential in advancing Lean Construction practices through its philosophy, principles, methods, and tools. Also, the utilisation of VR, particularly in SCRUM, Set Based Design and Visual Management, underlines a transformative potential for enhancing construction project efficiency and value. The paper concludes by highlighting the contributions of VR to Lean Construction, proposing actionable insights for practitioners and suggesting avenues for future research. This approach provides a comprehensive review for integrating VR in construction projects, aligning with Lean Construction for enhanced project outcomes.
- 1 July 2024
- Published by IGLC
- p. 743-754
Open AccessEnhancing Lean Construction Through Innovative Technology: A Focus on Virtual Reality in Construction
This study delineates the integration of Virtual Reality (VR) within Lean Construction, emphasising its application across the philosophy, principles, methods, and tools of Lean Construction. By conducting a systematic literature review, this research considers the utilisation of VR to enhance construction processes, specifically focusing on its role in mitigating waste, maximising value, continuous improvement, and respect for people. The investigation reveals VR's capacity to bridge the theoretical and practical aspects of Lean Construction, offering a novel perspective on its implementation. The results demonstrate VR's potential in advancing Lean Construction practices through its philosophy, principles, methods, and tools. Also, the utilisation of VR, particularly in SCRUM, Set Based Design and Visual Management, underlines a transformative potential for enhancing construction project efficiency and value. The paper concludes by highlighting the contributions of VR to Lean Construction, proposing actionable insights for practitioners and suggesting avenues for future research. This approach provides a comprehensive review for integrating VR in construction projects, aligning with Lean Construction for enhanced project outcomes.
- 29 October 2021
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- Vol. 12 (2) , 325-340
Labor waste in housing construction projects: an empirical study
Purpose: High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects.Design/methodology/approach: This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews.Findings: Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste.Research limitations/implications: This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site.Originality/value: The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.
- 29 October 2021
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- Vol. 12 (2) , 325-340
Labor waste in housing construction projects: an empirical study
Purpose: High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects.Design/methodology/approach: This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews.Findings: Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste.Research limitations/implications: This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site.Originality/value: The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.