Tao Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Tao Zhang has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
Yuedong Wang
2 shared publicationsBingzhi Chen
Dalian Jiaotong University
1 shared publicationChengpeng Yang
1 shared publicationChun-Yuan Song
1 shared publicationJianxiang Lin
1 shared publication- Jun Luo
State Key Laboratory of Traction Power, Southwest Jiaotong University, Chengdu 610031, China
1 shared publication
Latest Publications
- Open Access
- 4 February 2026
- Published by Elsevier in SSRN Electronic Journal
Formation mechanism and progression patterns of wheel tread spalling failure of high-speed trains
The tread spalling can cause wheel-rail vibration and noise, thereby adversely affecting the operational safety and comfort of high-speed trains. Focusing on the spot spalling phenomenon observed on high-speed train wheels during service, this paper conducts an in-depth investigation into the failure mechanism of wheel tread spalling. With the aid of representative wheels, comprehensive material property tests are carried out, including metallographic microstructure, hardness, macrostructure, chemical composition, residual stress, tensile properties, and impact toughness. Meanwhile, a wheel-rail rolling contact numerical model is established to obtain the contact stresses. The results indicate that airflow disturbances during vehicle operation lead to the presence of foreign particles, such as sand and dust, in the wheel-rail interface, and the tread spot defects are subsequently formed under the action of wheel-rail contact stresses. Moreover, the number of tread spot defects on the leading and trailing vehicles is significantly lower than that on the intermediate vehicles. In addition, the results of material property tests and wheel-rail contact stress calculations suggest that the tread spot defects are unlikely to further develop into tread cracks. However, under the rolling contact stresses, micro-defects on the tread subsurface may serve as the main factor for fatigue crack initiation and subsequent propagation. Hence, it is recommended to track its development trend through daily monitoring. In severe cases, it can be eliminated by the tread turning. These results offer valuable insights into the prevention and management of wheel tread spalling in high-speed trains.
- 4 February 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessFormation mechanism and progression patterns of wheel tread spalling failure of high-speed trains
The tread spalling can cause wheel-rail vibration and noise, thereby adversely affecting the operational safety and comfort of high-speed trains. Focusing on the spot spalling phenomenon observed on high-speed train wheels during service, this paper conducts an in-depth investigation into the failure mechanism of wheel tread spalling. With the aid of representative wheels, comprehensive material property tests are carried out, including metallographic microstructure, hardness, macrostructure, chemical composition, residual stress, tensile properties, and impact toughness. Meanwhile, a wheel-rail rolling contact numerical model is established to obtain the contact stresses. The results indicate that airflow disturbances during vehicle operation lead to the presence of foreign particles, such as sand and dust, in the wheel-rail interface, and the tread spot defects are subsequently formed under the action of wheel-rail contact stresses. Moreover, the number of tread spot defects on the leading and trailing vehicles is significantly lower than that on the intermediate vehicles. In addition, the results of material property tests and wheel-rail contact stress calculations suggest that the tread spot defects are unlikely to further develop into tread cracks. However, under the rolling contact stresses, micro-defects on the tread subsurface may serve as the main factor for fatigue crack initiation and subsequent propagation. Hence, it is recommended to track its development trend through daily monitoring. In severe cases, it can be eliminated by the tread turning. These results offer valuable insights into the prevention and management of wheel tread spalling in high-speed trains.
- 5 June 2025
- Published by Taylor & Francis in International Journal of Rail Transportation
- Vol. 14 (2) , 439-464
Analysis of the impact of wheel diameter reduction due to wheel wear on high-speed train
- 5 June 2025
- Published by Taylor & Francis in International Journal of Rail Transportation
- Vol. 14 (2) , 439-464
Analysis of the impact of wheel diameter reduction due to wheel wear on high-speed train
- Open Access
- 1 January 2021
- Published by Wiley in Shock and Vibration
- Vol. 2021 (1)
Stochastic Analysis on the Resonance of Railway Trains Moving over a Series of Simply Supported Bridges
Resonance problems encountered in vehicle‐bridge interaction (VBI) have attracted widespread concern over the past decades. Due to system random characteristics, the prediction of resonant speeds and responses will become more complicated. To this end, this study presents stochastic analysis on the resonance of railway trains moving over a series of simply supported bridges with consideration of the randomness of system parameters. A train‐slab track‐bridge (TSB) vertically coupled dynamics model is established following the basic principle of vehicle‐track‐coupled dynamics. The railway train is composed of multiple vehicles, and each of them is built by seven rigid parts assigned with a total of 10 degrees of freedom. The rail, track slab, and bridge are considered as Euler–Bernoulli beams, and the vibration equations of which are established by the modal superposition method (MSM). Except for the nonlinear wheel‐rail interaction based on the Hertz contact theory, the other coupling relations between each subsystem are assumed to be linear elastic. The number theory method is employed to obtain the representative sample point sets of the random parameters, and the flow trajectories of probabilities for the TSB dynamics system are captured by a probability density evolution method (PDEM). Numerical results indicate that the maximum bridge and vehicle responses are mainly dominated by the primary train‐induced resonant speed; the last vehicle of a train will be more seriously excited when the bridges are set in resonance by the train; the resonant speeds and responses are rather sensitive to the system randomness, and the possible maximum amplitudes predicted by the PDEM are significantly underestimated by the traditional deterministic method; optimized parameters of the TSB system are preliminary obtained based on the representative point sets and imposed screening conditions.
- 1 January 2021
- Published by Wiley in Shock and Vibration
- Vol. 2021 (1)
Open AccessStochastic Analysis on the Resonance of Railway Trains Moving over a Series of Simply Supported Bridges
Resonance problems encountered in vehicle‐bridge interaction (VBI) have attracted widespread concern over the past decades. Due to system random characteristics, the prediction of resonant speeds and responses will become more complicated. To this end, this study presents stochastic analysis on the resonance of railway trains moving over a series of simply supported bridges with consideration of the randomness of system parameters. A train‐slab track‐bridge (TSB) vertically coupled dynamics model is established following the basic principle of vehicle‐track‐coupled dynamics. The railway train is composed of multiple vehicles, and each of them is built by seven rigid parts assigned with a total of 10 degrees of freedom. The rail, track slab, and bridge are considered as Euler–Bernoulli beams, and the vibration equations of which are established by the modal superposition method (MSM). Except for the nonlinear wheel‐rail interaction based on the Hertz contact theory, the other coupling relations between each subsystem are assumed to be linear elastic. The number theory method is employed to obtain the representative sample point sets of the random parameters, and the flow trajectories of probabilities for the TSB dynamics system are captured by a probability density evolution method (PDEM). Numerical results indicate that the maximum bridge and vehicle responses are mainly dominated by the primary train‐induced resonant speed; the last vehicle of a train will be more seriously excited when the bridges are set in resonance by the train; the resonant speeds and responses are rather sensitive to the system randomness, and the possible maximum amplitudes predicted by the PDEM are significantly underestimated by the traditional deterministic method; optimized parameters of the TSB system are preliminary obtained based on the representative point sets and imposed screening conditions.