Chenlong Xie
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Chenlong Xie has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Mohd Yawar Ali Khan
King Abdulaziz University
1 shared publication - Wenjie Xu
School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou 450045, China
1 shared publication - Xinyong Xu
School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou 450045, China
1 shared publication
Latest Publications
- Open Access
- 2 December 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (23) , 11413
Prediction of the Long-Term Performance Based on the Seepage-Stress-Damage Coupling Theory: A Case in South-to-North Water Diversion Project in China
The South-to-North Water Diversion Project has been in operation since 2014, directly benefiting more than 79 million people in China. Thus, its service life and long-term performance have gained much attention from scholars. To predict its life and performance, this study used the seepage/stress-damage coupling method. In addition, a seepage/stress-damage coupling theory was proposed and a finite element model of a deep excavated canal in the Xichuan Section of the South-to-North Water Diversion Project was established. The results showed that this canal subsided greatly in the first two years of operation, which can be confirmed by the monitoring data. It is predicted that, after 50 years of normal operation, the canal damage may start and spread from the water level, and reach 37.6%, but such damage will not affect its normal water delivery function. The purpose of this study is to provide guidance for the safe operation of the project.
- 2 December 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (23) , 11413
Open AccessPrediction of the Long-Term Performance Based on the Seepage-Stress-Damage Coupling Theory: A Case in South-to-North Water Diversion Project in China
The South-to-North Water Diversion Project has been in operation since 2014, directly benefiting more than 79 million people in China. Thus, its service life and long-term performance have gained much attention from scholars. To predict its life and performance, this study used the seepage/stress-damage coupling method. In addition, a seepage/stress-damage coupling theory was proposed and a finite element model of a deep excavated canal in the Xichuan Section of the South-to-North Water Diversion Project was established. The results showed that this canal subsided greatly in the first two years of operation, which can be confirmed by the monitoring data. It is predicted that, after 50 years of normal operation, the canal damage may start and spread from the water level, and reach 37.6%, but such damage will not affect its normal water delivery function. The purpose of this study is to provide guidance for the safe operation of the project.