Hsin-Cheng Shih
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hsin-Cheng Shih has a total of 53 co-authors. Here are the top co-authors by number of shared publications:
Kenny Chandra Wijaya
2 shared publicationsYu-Ting Hsu
2 shared publicationsAditi Khodke
1 shared publicationAlice de Séjournet
1 shared publication- Ana Pejdo
Department of Geography , University of Zadar , Zadar , Croatia
1 shared publication Ayako Taniguchi
1 shared publication
Latest Publications
- 15 December 2024
- Published by Elsevier in Transport Policy
- Vol. 162, 283-295
Away from over-populated development: Estimating urban carrying capacity with an integrated perspective of transportation and urban planning
- 15 December 2024
- Published by Elsevier in Transport Policy
- Vol. 162, 283-295
Away from over-populated development: Estimating urban carrying capacity with an integrated perspective of transportation and urban planning
- 2 August 2024
- Published by Elsevier
Contributors
- 2 August 2024
- Published by Elsevier
- p. 177-189
COVID-19 public transport responses in Taipei and Kaohsiung
- 2 August 2024
- Published by Elsevier
- p. 177-189
COVID-19 public transport responses in Taipei and Kaohsiung
- 2 December 2021
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (4) , 324-333
Optimization of Multi-Period Rail Procurement Plan
Rail is one of the most expensive assets in railway infrastructure. Therefore, a well-prepared rail procurement plan could benefit the asset management. For the metro system in Taiwan, the rail procurement plan includes two major uncertainties, namely, currency rates and the global steel price. In this study, we propose deterministic and stochastic optimization models using a scenario-generation process to minimize the expected cost of the rail procurement plan. Results from the case studies demonstrate that the proposed models can successfully incorporate the uncertainties and obtain the optimal procurement plan. The sensitivity analysis on budget, storage capacity, and expiration period also provides the metro operator the best strategy to further lower the procurement cost. Adopting these models in rail procurement planning can improve the process and results of rail asset management.
- 2 December 2021
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (4) , 324-333
Optimization of Multi-Period Rail Procurement Plan
Rail is one of the most expensive assets in railway infrastructure. Therefore, a well-prepared rail procurement plan could benefit the asset management. For the metro system in Taiwan, the rail procurement plan includes two major uncertainties, namely, currency rates and the global steel price. In this study, we propose deterministic and stochastic optimization models using a scenario-generation process to minimize the expected cost of the rail procurement plan. Results from the case studies demonstrate that the proposed models can successfully incorporate the uncertainties and obtain the optimal procurement plan. The sensitivity analysis on budget, storage capacity, and expiration period also provides the metro operator the best strategy to further lower the procurement cost. Adopting these models in rail procurement planning can improve the process and results of rail asset management.