Timson Yeung
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Timson Yeung has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
- Rafael Sacks
Technion Israel Institute of Technology
4 shared publications Rafael Sacks
Seskin Virtual Construction Laboratory, Technion
2 shared publicationsAlwyn Mathew
1 shared publication- André Borrmann
Technische Universität München
1 shared publication Davide Schaumann
Technion Israel Institute of Technology
1 shared publicationHuaquan Ying
Technion Israel Institute of Technology
1 shared publication
Latest Publications
- Open Access
- 19 June 2026
- Published by Cambridge University Press (CUP) in Data-Centric Engineering
- Vol. 7, e21
Laboratory demonstration of digital twin construction
Digital Twin Construction (DTC) is a data-centric mode of construction that leverages digital twin technologies to maintain a continuously updated representation of a project and to enable short cycle Plan Do Check Act (PDCA) planning and control with continuous feedback and improvement. Industrial implementations reported to date have been too narrow in scope and too few in number to provide comprehensive proof of feasibility and empirical evidence of impacts. We address these gaps using a laboratory setup that implements a complete DTC PDCA workflow for a precast residential project. The experimental DTC system stores project intent, monitors and captures current status, and supports human in the loop replanning or automated optimization across factory production, logistics, and erection on site for a 1:25 scale model building. Validation through numerous full construction project runs demonstrates consistent end-to-end operation and practical usability. The testbed itself provides a reference architecture for DTC systems and a platform for controlled and replicable experiments that provide comparable quantitative evidence on DTC impacts under varied levels of automation.
- 19 June 2026
- Published by Cambridge University Press (CUP) in Data-Centric Engineering
- Vol. 7, e21
Open AccessLaboratory demonstration of digital twin construction
Digital Twin Construction (DTC) is a data-centric mode of construction that leverages digital twin technologies to maintain a continuously updated representation of a project and to enable short cycle Plan Do Check Act (PDCA) planning and control with continuous feedback and improvement. Industrial implementations reported to date have been too narrow in scope and too few in number to provide comprehensive proof of feasibility and empirical evidence of impacts. We address these gaps using a laboratory setup that implements a complete DTC PDCA workflow for a precast residential project. The experimental DTC system stores project intent, monitors and captures current status, and supports human in the loop replanning or automated optimization across factory production, logistics, and erection on site for a 1:25 scale model building. Validation through numerous full construction project runs demonstrates consistent end-to-end operation and practical usability. The testbed itself provides a reference architecture for DTC systems and a platform for controlled and replicable experiments that provide comparable quantitative evidence on DTC impacts under varied levels of automation.
- Open Access
- 2 June 2025
- Published by IGLC
- p. 598-609
Practices and Barriers to the Adoption of Digital Twin Construction in Latin America
The Digital Twin Construction paradigm, built on existing concepts of Lean project production systems, Building Information Modelling, Artificial Intelligence, and Automated data acquisition, proposes a new mode of construction management that leverages real-time insights and predictive analytics to optimise production flow and mitigate risks proactively. Its potential adoption in Latin America has yet to be explored. This study examines current practices and barriers to implementing Digital Twin Construction-based production planning and control systems. A survey was developed and validated through the Delphi method, involving an expert panel to ensure reliability and relevance. According to the survey's results and experts' opinions, technological, organisational, cultural, and economic factors have impacted the adoption of Digital Twin Construction, including lack of robust digital infrastructure, gaps in knowledge, and resistance to innovation. The research findings provide practical recommendations to support future research and industry efforts.
- 2 June 2025
- Published by IGLC
- p. 598-609
Open AccessPractices and Barriers to the Adoption of Digital Twin Construction in Latin America
The Digital Twin Construction paradigm, built on existing concepts of Lean project production systems, Building Information Modelling, Artificial Intelligence, and Automated data acquisition, proposes a new mode of construction management that leverages real-time insights and predictive analytics to optimise production flow and mitigate risks proactively. Its potential adoption in Latin America has yet to be explored. This study examines current practices and barriers to implementing Digital Twin Construction-based production planning and control systems. A survey was developed and validated through the Delphi method, involving an expert panel to ensure reliability and relevance. According to the survey's results and experts' opinions, technological, organisational, cultural, and economic factors have impacted the adoption of Digital Twin Construction, including lack of robust digital infrastructure, gaps in knowledge, and resistance to innovation. The research findings provide practical recommendations to support future research and industry efforts.
- Top Cited PapersOpen Access
- 15 March 2025
- Published by Elsevier in Automation in Construction
- Vol. 174
Reference architecture and ontology framework for digital twin construction
- 15 March 2025
- Published by Elsevier in Automation in Construction
- Vol. 174
Top Cited PapersOpen AccessReference architecture and ontology framework for digital twin construction
- 30 September 2023
- Published by Springer Nature
- p. 633-650
Automatic Parametric Generation of Simulation Models from Project Information in Digital Twin Construction
- 30 September 2023
- Published by Springer Nature
- p. 633-650
Automatic Parametric Generation of Simulation Models from Project Information in Digital Twin Construction
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149 (3) , 04022183
Situational Awareness in Construction Using a Serious Game
Production planners in construction face several problems related to the lack of information regarding construction project status, changes to resource availability, instability in production rates, design changes, and limited situational awareness (SA). Poor SA leads to uninformed and suboptimal resource allocation decisions. As a result, the construction workflow is negatively affected, degrading project performance. This study focuses specifically on possible relationships between production planners’ SA and the resulting workflow quality. Such understanding can lead to the development of measures to improve production management in construction. Interviews with diverse production planners highlighted the nature of the information needed, issues related to the lack of SA, and the effect on workflow. A serious roleplaying game was devised to measure the correlation between production planners’ SA and workflow, and 14 live simulation experiments were conducted with two teams of nine players each. Finally, a qualitative analysis of the information flow configurations applied in the experiments evaluated the expected effects of information flows in the live experiment. The study found a positive correlation between the quality of information flow and workflow in construction, indicating causation in line with theoretical expectations. Specifically, free communication among planners together with management tools such as formal weekly work planning and a digital planning tool reduced the assembly time, working time, and non-value-added time of the subcontractors in the experiments. Good information flows among production planners and an up-to-date jobsite status diminish uncertainty and increase SA, which lead to improved workflow and productivity.
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149 (3) , 04022183
Situational Awareness in Construction Using a Serious Game
Production planners in construction face several problems related to the lack of information regarding construction project status, changes to resource availability, instability in production rates, design changes, and limited situational awareness (SA). Poor SA leads to uninformed and suboptimal resource allocation decisions. As a result, the construction workflow is negatively affected, degrading project performance. This study focuses specifically on possible relationships between production planners’ SA and the resulting workflow quality. Such understanding can lead to the development of measures to improve production management in construction. Interviews with diverse production planners highlighted the nature of the information needed, issues related to the lack of SA, and the effect on workflow. A serious roleplaying game was devised to measure the correlation between production planners’ SA and workflow, and 14 live simulation experiments were conducted with two teams of nine players each. Finally, a qualitative analysis of the information flow configurations applied in the experiments evaluated the expected effects of information flows in the live experiment. The study found a positive correlation between the quality of information flow and workflow in construction, indicating causation in line with theoretical expectations. Specifically, free communication among planners together with management tools such as formal weekly work planning and a digital planning tool reduced the assembly time, working time, and non-value-added time of the subcontractors in the experiments. Good information flows among production planners and an up-to-date jobsite status diminish uncertainty and increase SA, which lead to improved workflow and productivity.
- 1 February 2022
- Published by Elsevier in Automation in Construction
- Vol. 134
Exploring graph neural networks for semantic enrichment: Room type classification
- 1 February 2022
- Published by Elsevier in Automation in Construction
- Vol. 134
Exploring graph neural networks for semantic enrichment: Room type classification