Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Alaa Salman has a total of 22 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    A Strategic Framework for Urban Infrastructure Asset Management: Enhancing Longevity, Resilience, and Service Quality in City Assets

    by Alaa Salman

    Introduction: Urban areas have increasing demands to sustain infrastructure in the context of deteriorating assets and expanding populations. Accordingly, Infrastructure Asset Management (IAM) offers a systematic methodology to enhance planning, budgeting, and performance. This research presents a versatile IAM framework designed for urban environments to promote sustainable development. Methods: A ten-stage framework was developed, starting with a preliminary report and ending with an infrastructure report card. SWOT analysis is carried out at every phase to assist decision-making and fulfill the city's requirements. A hypothetical case study illustrates the implementation of a budget allocation model with respect to the physical condition assessment using AHP and Lingo software. Results: The case study measures the infrastructure GPA for urban areas and regions in Saudi Arabia. A mathematical model improves budget allocation by considering infrastructure sector implications, condition assessment ratings, and required costs. City X had a GPA of 2.69 (D+), demonstrating the need for further investment in the specific infrastructure sector. Discussion: The developed model enables required financing, allocating available resources to critical areas such as wastewater management for the hypothetical case study. Budget limits result in planned cuts in lower-priority areas, affecting service quality. Continuing success requires strategic anticipation, regular evaluation, and varied financing flows. Conclusion: The framework provides a logical model for urban Asset Management, considering lifespan cost, risk assessment, and level of service analysis. It enables data-driven decision-making and aids cities to tailor the framework to their location and resources. Extensive implementation may improve infrastructure sustainability, resilience, and consistency with national development goals.


  • Open Access

    A DEMATEL-based method for developing and assessing key performance indicators for construction projects

    by Alaa Salman, Samer Al-Imamy

    Construction projects present unique challenges compared to other project types, given their inherent risks, lengthy timelines, substantial budgets, and significant social, environmental, and safety implications. Despite these complexities, the ultimate deliverables may not always meet the expectations of end users or owners. This project aims to address this issue by initially developing key performance indicators (KPIs) and subsequently creating a project performance card (PPC) tailored specifically for construction projects. Eight indicators have been identified to assess the performance of these projects upon completion. These indicators will be integrated to derive a final score and issue a project performance card using the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method. The results consist of a Relationships Digraph, which identifies the causal and recipient indicators, and a PPC illustrating the KPIs along with the project's final performance score. To elucidate the developed models and interpret the results for future construction projects, a case study is provided. Project Performance Analyzer (PPA), an automated online tool, has been developed to implement the current methodology and generate a project report card that illustrates the relationships among project indicators. This research significantly contributes to pinpointing the weaknesses in construction project performance and comparing their performance levels to other project types.


  • Open Access

    Developing the Learning Curve Model to Enhance Construction Project Scheduling and Cost Estimating

    by Alaa Salman, Mahmoud Sodangi

    Aim: The aim of the study is to develop a scheduling and cost estimation model for repetitive construction units by applying the learning curve theory and to contribute to advancements in construction project management practices, promoting efficiency and competitiveness within the industry. Background: Construction projects, particularly those with repetitive units like housing developments, face ongoing challenges in accurate scheduling and cost estimation. Traditional estimation methods often overlook the impact of learning effects, which can improve productivity and reduce costs as crews gain experience. Learning curve theory, widely applied in manufacturing, offers a framework to model these gains in construction settings. Integrating learning curves into project planning has the potential to enhance accuracy in forecasting timelines and budgets, ultimately improving project efficiency and resource management. Objective: The objective of this study is to develop and apply a learning curve model to enhance scheduling and cost estimation in repetitive construction projects, particularly in a multi-unit housing project. Methods: By incorporating historical data and analyzing critical factors that impact project duration and cost, a more reliable forecasting model is developed. The learning curves are created using a three-point approach, supported by artificial neural networks (ANN) and the relative importance index (RII), to systematically assess cost divisions and influential project factors. Results: The results indicate that the learning curve model can achieve time savings of 27% and labor cost savings of 36% compared to traditional estimation methods that do not consider the effect of the learning curve in construction projects. Conclusion: This research demonstrates that learning curve models, combined with advanced data analysis techniques, provide a robust framework for optimizing project schedules and budgets, ultimately leading to more efficient resource utilization and cost-effective project outcomes. In other words, the study presented in this paper is significant as it can lead to improved project outcomes, cost savings, better resource management, and overall advancement in the construction industry's practices and competitiveness. This approach allows for accurate scheduling and cost forecasting based on data-driven insights.

  • Open Access

    Optimal Budget Allocation Model for Managing the Maintenance of Educational Assets and Facilities Using Markov Chains

    by Alaa Salman, Mahmoud Sodangi

    Optimal Budget Allocation Model for Managing the Maintenance of Educational Assets and Facilities Using Markov Chains


  • Open Access

    Analyzing Contingency Estimation for Residential Turnkey Projects in Saudi Arabia: A Neural Network Approach

    by Alaa Salman

    Utilizing a turnkey approach to deliver a construction project entails significant risks from the contractor’s perspective. Essentially, the owner awaits project completion without commitments regarding additional expenditures incurred by the contractor during the project’s duration. This paper specifically focuses on estimating and analyzing the contingency value for residential turnkey projects in Saudi Arabia. The contingency value across the project’s life cycle is estimated using six Artificial Neural Network (ANN) models, which are compared to identify the best-trained network according to project complexity, contingency factor, and contingency impact during the project phases. The output layer provides the contingency factor percentages for each project phase. A 13-story reinforced concrete (RC) residential building established in one of Saudi Arabia’s cities was selected to implement the developed methodology. The contingency estimation, performed using @Risk 7.5 and NeuralTools 7.5, was determined to be 11.34% and was distributed across the five phases of the project’s life cycle: 0.30% for predesign, 0.99% for design, 2.61% for preconstruction, 6.33% for construction, and 1.12% for postconstruction. Furthermore, it was found that the estimated contingency varies based on project complexity, which is 7.20% for low complexity, 8.16% for medium complexity, 9.41% for complicated, and 11.34% for very complicated projects. Historical data and peer review approaches are employed to validate the results, both of which are endorsed by professionals in this field. This paper highlights two main contributions: Firstly, it significantly enhances risk management by facilitating a comprehensive understanding and systematic analysis of risks, thus improving the contractors’ ability to mitigate potential negative impacts on projects. Secondly, it supports more informed decision-making through the use of advanced techniques to estimate and analyze contingency values. These contributions are critical for contractors engaged in Saudi construction projects, particularly those involving residential buildings.


  • Open Access

    Evaluating the correlation between project selection criteria and organizational performance within the construction industry

    by Muhammad Ali Musarat, Ahsen Maqsoom, Muhammad Hassaan Naeem, Fahim Ullah, Alaa Salman, Wesam Salah Alaloul, Hafiz Zahoor


  • Open Access

    Criticality-Based Management of Facility Assets

    by Alaa Salman

    Effective facility asset management requires specific skills and tools to optimize the use of limited resources, making a decision support system essential. This research introduces a comprehensive decision support system, which is a framework organized into three models: the criticality model, the rehabilitation model, and the optimum criticality model to manage the rehabilitation of facility assets. The criticality model utilizes the Analytical Hierarchy Process (AHP) to assess the group of assets. Emphasizing criticality as a central management factor, this model lays the foundation for subsequent decision-making. The rehabilitation model employs an Artificial Neural Network (ANN), integrating Customer Level of Service (CLoS), Technical Level of Service (TLoS), and asset criticality to determine appropriate rehabilitation actions. NeuralTools 7.5 is leveraged for precise predictions of rehabilitation strategies tailored to specific assets. The third model, optimum criticality, focuses on prioritizing rehabilitation activities within the constraints of limited budgets. Lingo 20.0 is utilized to optimize rehabilitation activities, considering budget limitations and other constraints, offering a strategic approach to maximize the impact of available resources. This integrated framework provides decision-makers with a systematic and data-driven approach to facility management, enhancing the efficiency and effectiveness of rehabilitation actions. An academic building was chosen as a hypothetical example to implement the three models and suggest the essential considerations for managing both the academic building itself and other infrastructure assets. The results obtained demonstrate that the principles and methodologies encapsulated in this project can be extrapolated and scaled up for application to large-scale infrastructure assets, ensuring the sustenance of the requisite level of service and the management of acceptable risk on a broader scale.


  • Open Access

    The Relationship between Error Management, Safety Climate, and Job-Stress Perception in the Construction Industry: The Mediating Role of Psychological Capital

    by Ahsen Maqsoom, Hassan Ashraf, Wesam Salah Alaloul, Alaa Salman, Fahim Ullah, Maria Ghufran, Muhammad Ali Musarat

    Job stress (JS) is a significant issue in the construction industry of developing countries. This study aims to examine the impact of error-management climate (EMC), safety climate (SC), and psychological capital (PC) (as a mediator) on employee JS in the construction industry, and establish relationships between these constructs. A questionnaire survey was conducted to gather data from 144 respondents. The study’s hypothesized relationships were tested using partial-least-squares structural-equation modeling (PLS-SEM). The analysis indicated a positive association between EMC and PC. Conversely, EMC did not have a negative impact on JS. The study also established a constructive relationship between SC and PC, and a significant negative association between SC and JS. Regarding mediation, PC was found to partially mediate the effect of EMC on JS, accounting for 55% of the variance accounted for (VAF). The study’s innovative contribution lies in exploring the limited research on PC within the construction industry, and investigating the interactions among SC, EMC, PC, and JS.


  • Open Access

    Adopting Green Behaviors in the Construction Sector: The Role of Behavioral Intention, Motivation, and Environmental Consciousness

    by Ahsen Maqsoom, Muhammad Umer, Wesam Salah Alaloul, Alaa Salman, Fahim Ullah, Hassan Ashraf, Muhammad Ali Musarat

    Non-renewable resources have been becoming scarcer on a global scale by the day, while energy demand has been rising exponentially. To tackle this problem, organizations worldwide have been striving to learn and adopt green practices to sustain themselves and benefit society. In this context, the current study aims to identify and understand the critical factors that encourage individuals working in construction organizations to adopt green behavior. The current study surveyed 121 top managers working in 150 construction firms deployed across Pakistan. It was found that knowledge and awareness significantly contributed to green behavioral adoption. Additionally, behavioral intention, motivation, and environmental consciousness have been found to positively mediate the impact of knowledge and awareness on green behavior adoption. The findings of this study highlight the important factors to consider when developing future policies. Moreover, the research provides a stepping stone for future researchers to evaluate other sectors and regions in similar contexts to draw comparisons and identify areas for improvement.


  • Open Access

    Nexus between Leader–Member Exchange, Paternalistic Leadership, and Creative Behavior in the Construction Industry

    by Ahsen Maqsoom, Ifra Zahoor, Hassan Ashraf, Fahim Ullah, Badr T. Alsulami, Alaa Salman, Muwaffaq Alqurashi

    Effective leadership and creative performance are the predominant factors for the success of modern projects in the global construction industry. However, rigorous research has not explored the nexus between such factors and the leader–member exchange (LMX). To address this gap, this study explores the relationship between dimensions of paternalistic leadership and employee creativity achieved through LMX in the context of the construction industry. Based on social exchange theory (SET), six relevant hypotheses were proposed in this study. The data were collected through a structured questionnaire. An online survey form was used for data collection, through which 288 responses were collected from the construction industry employees working in Pakistan. The collected data were analyzed using Smart PLS in two stages, i.e., measurement model evaluation (reliability analysis, convergent and discriminant validity) and structural model evaluation (R2, F2, and path coefficient). The findings of the current study reveal a positive association of authoritarian, benevolent, and moral leadership with employee creativity. In addition, LMX significantly mediates the relationship between the two dimensions of paternalistic leadership (benevolent and moral leadership) and creativity, except for authoritarian leadership. Based on the results, this study contributes to the body of knowledge related to the appropriate leadership style in the local construction industry that can be extended to other developing countries with similar dynamics. It also helps the managers target and develops relevant skills to acquire positive outcomes from their team members.