Wencui Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Wencui Zhang has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Jian Zhang
College of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou, China
2 shared publications Yaohong Zhu
School of Civil and Environmental Engineering, Ningbo University, Ningbo, China
2 shared publicationsJiaru Luo
College of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou, China
1 shared publicationJingru Yan
College of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou, China
1 shared publication- Qiye Yang
College of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou 450001, China
1 shared publication - Shiqi Li
College of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou 450001, China
1 shared publication
Latest Publications
- Open Access
Identification of Key Risk Factors in Mechanical Cross Passage Construction Based on the Decision-Making Test and Evaluation Test Method and the Interpretation Structure Model
In order to solve the problem that the key risk factors in the construction of mechanical cross passages are relatively vague, the decision-making test and evaluation test method (DEMATEL) and the interpretation structure model (ISM) are combined to analyze safety risks in the construction of mechanical cross passages scientifically and reasonably. Based on the ‘personnel’, ‘material’, ‘machine’, ‘method’, and ‘environment’ of 4M1E comprehensive management, the construction safety risk index system of mechanical method cross passage, including 18 risk factors, is extracted. DEMATEL was used to divide the risk factors into four factor sets: strong cause, weak cause, strong result, and weak result. Furthermore, ISM is used to construct a hierarchical structure diagram of risk factors, and deep risk factors and risk factors with a high node degree are divided. The results show that the safety awareness of construction personnel, the safety technology level of construction personnel, the establishment and implementation of the safety construction system, the level of construction management, and the degree of geological complexity are strong cause-type risk factors with both high centrality and high causality. Additionally, the effect of reinforcement of the internal support system, the setting of the digging parameter, the effect of grouting, and the effect of assembling the pipe sheet comprise the strong result-type risk factors with high centrality. The risk factors with higher node degree in ISM are consistent with the risk factors with higher centrality in the DEMATEL model, which are key factors that play an important role in risk control.
Open AccessIdentification of Key Risk Factors in Mechanical Cross Passage Construction Based on the Decision-Making Test and Evaluation Test Method and the Interpretation Structure Model
In order to solve the problem that the key risk factors in the construction of mechanical cross passages are relatively vague, the decision-making test and evaluation test method (DEMATEL) and the interpretation structure model (ISM) are combined to analyze safety risks in the construction of mechanical cross passages scientifically and reasonably. Based on the ‘personnel’, ‘material’, ‘machine’, ‘method’, and ‘environment’ of 4M1E comprehensive management, the construction safety risk index system of mechanical method cross passage, including 18 risk factors, is extracted. DEMATEL was used to divide the risk factors into four factor sets: strong cause, weak cause, strong result, and weak result. Furthermore, ISM is used to construct a hierarchical structure diagram of risk factors, and deep risk factors and risk factors with a high node degree are divided. The results show that the safety awareness of construction personnel, the safety technology level of construction personnel, the establishment and implementation of the safety construction system, the level of construction management, and the degree of geological complexity are strong cause-type risk factors with both high centrality and high causality. Additionally, the effect of reinforcement of the internal support system, the setting of the digging parameter, the effect of grouting, and the effect of assembling the pipe sheet comprise the strong result-type risk factors with high centrality. The risk factors with higher node degree in ISM are consistent with the risk factors with higher centrality in the DEMATEL model, which are key factors that play an important role in risk control.
- Open Access
Risk Assessment Study on Mechanical Connecting Aisle Construction in the Bohai Mudstone Stratum with High Water Pressure
With the in-depth advancement of underground transportation in China, the connecting aisle is used as a link between different underground spaces to provide sufficient security and connection. The basic structural units of underground and aboveground spaces play an extremely important role. The use of the mechanical connecting aisle construction of over mucky strata is difficult, and it is easy to have an impact on the main tunnel. To ensure the safety of connecting aisle construction, studies should be performed on the construction technology, equipment, scheme, and related risk analysis of mechanical connecting aisle construction. In this study the work breakdown structure-risk breakdown structure combined with the expert investigation method is used to comprehensively identify the construction process, construct the risk index system of mechanical connecting aisle construction, determine the initial risk value, and comprehensively use the fuzzy-analytic hierarchical process to establish a fuzzy complementary judgment matrix, obtain the risk-weighted correction value, and quantitatively evaluate the risk source level of the mechanical connecting aisle construction. Based on the assessment method, the risk assessment of the mechanical connecting aisle construction project in Daqing section of Qingdao Metro Line 8 was performed, 113 potential risk sources were identified, and the comprehensive assessment obtained 7 major risk sources such as “improperly designed construction organization,” “instability of excavation surface,” and “easy leakage of lower river crossing” that were greater than the total risk average of 2.053. Corresponding risk response measures were proposed, which provided a reference for the risk assessment of similar projects in the construction of similar projects on mechanical connecting aisle construction in the Bohai mudstone stratum with high water pressure.
Open AccessRisk Assessment Study on Mechanical Connecting Aisle Construction in the Bohai Mudstone Stratum with High Water Pressure
With the in-depth advancement of underground transportation in China, the connecting aisle is used as a link between different underground spaces to provide sufficient security and connection. The basic structural units of underground and aboveground spaces play an extremely important role. The use of the mechanical connecting aisle construction of over mucky strata is difficult, and it is easy to have an impact on the main tunnel. To ensure the safety of connecting aisle construction, studies should be performed on the construction technology, equipment, scheme, and related risk analysis of mechanical connecting aisle construction. In this study the work breakdown structure-risk breakdown structure combined with the expert investigation method is used to comprehensively identify the construction process, construct the risk index system of mechanical connecting aisle construction, determine the initial risk value, and comprehensively use the fuzzy-analytic hierarchical process to establish a fuzzy complementary judgment matrix, obtain the risk-weighted correction value, and quantitatively evaluate the risk source level of the mechanical connecting aisle construction. Based on the assessment method, the risk assessment of the mechanical connecting aisle construction project in Daqing section of Qingdao Metro Line 8 was performed, 113 potential risk sources were identified, and the comprehensive assessment obtained 7 major risk sources such as “improperly designed construction organization,” “instability of excavation surface,” and “easy leakage of lower river crossing” that were greater than the total risk average of 2.053. Corresponding risk response measures were proposed, which provided a reference for the risk assessment of similar projects in the construction of similar projects on mechanical connecting aisle construction in the Bohai mudstone stratum with high water pressure.
- Open Access
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
It is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap, jack stroke difference, and lining trend. To calculate all possible key segment positions other than that corresponding to the straight joint configuration, the shield tail gap that remains after segment assembly and the jack stroke difference corresponding to the advancement of the segmental lining and lining trend were computed; then, values and importance coefficients were assigned to these factors according to current operating conditions. To ensure that the segmental lining can be assembled successfully with the calculated key position, we established a model to calculate the change in the shield tail gap before and after shield machine advancement based on the spatial relationships of the shield machine, the currently installed segmental rings, and the segment to be installed. Further, we propose a method for calculating the range of jack stroke differences when the predetermined “permitted shield tail gap” and key position are provided. The method is based on the change in the shield tail gap calculated with the above model and the positional relationship between the shield machine’s actual axis and the designed tunnel axis after the current segmental ring has been assembled. The calculated range of jack stroke differences may then be used to control the advancement of the shield machine. We validated the viability of our methods by using the data of Phase 1 works on Line 2 of the Ningbo Rail Transit system.
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Open AccessSelection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
It is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap, jack stroke difference, and lining trend. To calculate all possible key segment positions other than that corresponding to the straight joint configuration, the shield tail gap that remains after segment assembly and the jack stroke difference corresponding to the advancement of the segmental lining and lining trend were computed; then, values and importance coefficients were assigned to these factors according to current operating conditions. To ensure that the segmental lining can be assembled successfully with the calculated key position, we established a model to calculate the change in the shield tail gap before and after shield machine advancement based on the spatial relationships of the shield machine, the currently installed segmental rings, and the segment to be installed. Further, we propose a method for calculating the range of jack stroke differences when the predetermined “permitted shield tail gap” and key position are provided. The method is based on the change in the shield tail gap calculated with the above model and the positional relationship between the shield machine’s actual axis and the designed tunnel axis after the current segmental ring has been assembled. The calculated range of jack stroke differences may then be used to control the advancement of the shield machine. We validated the viability of our methods by using the data of Phase 1 works on Line 2 of the Ningbo Rail Transit system.