AKAmin Kishipour

Amin Kishipour

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Amin Kishipour has a total of 8 co-authors. Here are the top co-authors by number of shared publications:

  • Mahdi Asadi-Ghalhari

    Department of Environmental Health Engineering, Faculty of Health, Research Center for Environmental Pollutants, Qom University of Medical Sciences, Qom, Iran

    2 shared publications
  • Rahim Aali

    Department of Environmental Health, School of Health, Research Center for Environmental Pollutants, Qom University of Medical Sciences, Qom, Iran

    2 shared publications
  • Roqiyeh Mostafaloo

    Department of Environmental Health Engineering, School of Public Health and Research Center for Health Sciences, Student Research Committee, Hamadan University of Medical Sciences, Hamadan, Iran

    2 shared publications
  • Farzaneh Fanaei

    Department of Environmental Health Engineering, Ferdows Faculty of Medical Sciences, Social Determinants of Health Research Center, Birjand University of Medical Sciences, Birjand, Iran. - Clinical Research Development Unit (CRDU), Hazrat Rasoul Hospital of Ferdows, Birjand University of Medical Sciences, Birjand, Iran

    1 shared publication
  • Fatemeh Sadat Tabatabaei

    Department of Environmental Health Engineering, Faculty of Health, Qom University of Medical Sciences, Qom, Iran

    1 shared publication
  • Mohammad Fahiminia

    Research Centre for Environmental Pollutants, Department of Environmental Health Engineering, School of Health, Qom University of Medical Sciences, Qom, Iran

    1 shared publication

Latest Publications

  • Modeling and optimization of the coagulation/flocculation process in turbidity removal from water using poly aluminum chloride and rice starch as a natural coagulant aid

    by Mahdi Asadi-Ghalhari, Saideh Usefi, Nassim Ghafouri, Amin Kishipour, Roqiyeh Mostafaloo, Fatemeh Sadat Tabatabaei

    The application of the coagulation/flocculation process is very important due to its simplicity in removing turbidity. Due to the disadvantages of using chemical coagulants in water and the lack of sufficient effect of natural materials alone in removing turbidity for proper performance, the simultaneous use of chemical and natural coagulants is the best way to reduce the harmful effects of chemical coagulants in water. In this study, the application of poly aluminum chloride (PAC) as a chemical coagulant and rice starch as a natural coagulant aid to remove turbidity from aqueous solutions was investigated. Effects of the above coagulants on the four main factors, coagulant dose (0–10 mg/L), coagulant adjuvant dose (0–0.1 mg/L), pH (5–9), turbidity (NTU 0–50), and each five levels were assessed using a central composite design (CCD). Under the optimized conditions, the maximum turbidity elimination efficiency was found to be 96.6%. The validity and adequacy of the proposed model (quadratic model) were confirmed by the corresponding statistics (i.e., F-value of 23.3, p-values of 0.0001, and lack of fit of 0.877 for the model, respectively, R2 = 0.88, R2adj. = 0.84, R2 pred = 0.79, AP = 22.04). Graphical Abstract


  • Open Access

    Risk Assessment of Drinking Water Supply System of Talesh Based on World Health Organization Water Safety Plan in 2021: A Case Study

    by Rahim Aali, Amin Kishipour

    Water safety plan (WSP) is a new way to ensure the safety of drinking water by risk assessment and systematic prevention approach. The purpose of this study was to assess the risk and identify hazards from the production source to the point of use and plan to reduce or eliminate these hazards to provide safe drinking water. This study was conducted on the water supply system of Talesh city in 2021. The WSP has 12 stages and the third stage is risk assessment and hazard identification. This stage scored 69 points out of a total of 100 raw points, which indicates 69% coordination with the WSP. Based on the analysis, 47 hazards were identified in production sources, transmission lines, distribution network, and point of use. The presence of domestic sewage wells near the source of supply, undesirable chlorine concentration, and old pipes in the distribution network, as well as the failure of the check valve at the point of consumption are the most important risks. With the implementation of different phases of WSP, especially the stage of identification and assessment of microbial contamination risk in the distribution network, has been decreased to 0% and the desired residual chlorine concentration has been increased to 100%. Currently, water supply system of Talesh has a moderate level of safety.


  • Accomplishment of water safety plan using quality assurance tool in 2020-2021: A case study in a western city of Gilan province, Iran

    by Rahim Aali, Mohammad Fahiminia, Mahdi Asadi-Ghalhari, Farzaneh Fanaei, Roqiyeh Mostafaloo, Amin Kishipour

    Background: Water safety plan is a systematic approach to ensure the quality of water delivered to consumers from catchment to consumption. Methods: This study was conducted on the groundwater system of Talesh, Gilan, in 2020-2021. A Water Safety Plan (WSP) consists of 5 phases and 12 steps. In the implementation of this plan, all modules were reviewed. Software checklists were prepared and based on the background information in Talesh Water and Wastewater Company, interviews with experts and field visits were performed, and then, entered into WSP QA TOOL software. Results: Out of 440 raw scores, 222 points were obtained, indicating 50.45% compliance with WSP. The description system with the highest score (100%) and the management procedures with the lowest score (50%) were in line with this plan. The stages of development and supporting program and review of WSP cannot be evaluated due to the incomplete implementation of water safety plan in Talesh. Between different parts of the water supply system, more attention has been paid to production sources and points of use. Conclusion: This study identifies the inefficiency in dependence on the final tests and the necessary items in updating the supply system of Talesh. According to the study of the different stages of WSP, the system has a moderate level of safety.