Christian Vorpahl
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Christian Vorpahl has a total of 230 co-authors. Here are the top co-authors by number of shared publications:
- Christian Bachmann
BWI Management Weiterbildung AG
2 shared publications - Marianela Garcia-Munoz
University of Seville
2 shared publications A Snicker
VTT, , 02150 Espoo, Finland
1 shared publicationA. Buhler
Max-Planck-Institut für Plasmaphysik 2 , EURATOM Association-IPP, 85748 Garching, Germany
1 shared publicationA. Kagarmanov
Max-Planck-Institut für Plasmaphysik 2 , EURATOM Association-IPP, 85748 Garching, Germany
1 shared publicationA. Kammel
Max-Planck-Institut für Plasmaphysik 2 , EURATOM Association-IPP, 85748 Garching, Germany
1 shared publication
Latest Publications
- 1 July 2026
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 68 (7) , 075010
Overview of the activities on the ITER fast-ion loss detector
Latest advancements in the design of the ITER Lost Alpha Monitor diagnostic, also known as fast-ion loss detector (FILD), are detailed in this article. Advanced Hamiltonian full-orbit simulations are performed to estimate the velocity-space of fast-ion fluxes on the diagnostic probe head. Using the ASCOT code, these fluxes are characterized for different spatial spectra of externally applied 3D fields and probe head insertion depths. The probe head is inserted into the scrape-off layer (positioned at the level of the first wall) using a reciprocating system featuring an internal moving shaft, double bellows for vacuum integrity, and an electric actuator with a total radial stroke of ∼ 50 cm. Detailed structural, electromagnetic, and dynamic analyses of this reciprocating system are presented to validate its mechanical robustness against gravitational and induced electromagnetic forces. Thermomechanical modeling of heat loads on the probe head is used to estimate mechanical stresses and scintillator operating temperature. The light pattern emitted by the scintillator is computed using the FILDSIM code, which incorporates scintillator efficiency and orbit simulations. A 14 m long optical relay, featuring free-form mirrors and radiation-hardened lenses, collects and transmits the scintillator light into a shielding cabinet in the port cell. This cabinet houses the instrumentation for data acquisition (DAQ), digitizers for Faraday Cups, photomultiplier tubes, and charge couple device cameras. Monte Carlo simulations estimate radiation-induced noise on the scintillator and the effectiveness of DAQ shielding in the interspace. Together, these advancements ensure an acceptable signal-to-noise ratio of the Lost Alpha Monitor throughout the entire ITER operation.
- 1 July 2026
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 68 (7) , 075010
Overview of the activities on the ITER fast-ion loss detector
Latest advancements in the design of the ITER Lost Alpha Monitor diagnostic, also known as fast-ion loss detector (FILD), are detailed in this article. Advanced Hamiltonian full-orbit simulations are performed to estimate the velocity-space of fast-ion fluxes on the diagnostic probe head. Using the ASCOT code, these fluxes are characterized for different spatial spectra of externally applied 3D fields and probe head insertion depths. The probe head is inserted into the scrape-off layer (positioned at the level of the first wall) using a reciprocating system featuring an internal moving shaft, double bellows for vacuum integrity, and an electric actuator with a total radial stroke of ∼ 50 cm. Detailed structural, electromagnetic, and dynamic analyses of this reciprocating system are presented to validate its mechanical robustness against gravitational and induced electromagnetic forces. Thermomechanical modeling of heat loads on the probe head is used to estimate mechanical stresses and scintillator operating temperature. The light pattern emitted by the scintillator is computed using the FILDSIM code, which incorporates scintillator efficiency and orbit simulations. A 14 m long optical relay, featuring free-form mirrors and radiation-hardened lenses, collects and transmits the scintillator light into a shielding cabinet in the port cell. This cabinet houses the instrumentation for data acquisition (DAQ), digitizers for Faraday Cups, photomultiplier tubes, and charge couple device cameras. Monte Carlo simulations estimate radiation-induced noise on the scintillator and the effectiveness of DAQ shielding in the interspace. Together, these advancements ensure an acceptable signal-to-noise ratio of the Lost Alpha Monitor throughout the entire ITER operation.
- Open Access
European DEMO Fusion Reactor: Design and Integration of the Breeding Blanket Feeding Pipes
This article describes the design and configuration of the DEMO Breeding Blanket (BB) feeding pipes inside the upper port. As large BB segments require periodic replacement via the upper vertical ports, the space inside the upper port needs to be maximized. At the same time, the size of the upper port is constrained by the available space in between the toroidal field coils and the required space to integrate a thermal shield between the vacuum vessel (VV) port and the coils. The BB feeding pipes inside the vertical port need to be removed prior to BB maintenance, as they obstruct the removal kinematics. Since they are connected to the BB segments on the top and far from their vertical support on the bottom, the pipes need to be sufficiently flexible to allow for the thermal expansion of the BB segments and the pipes themselves. The optimization and verification of these BB pipes inside the upper port design are critical aspects in the development of DEMO. This article presents the chosen pipe configuration for both BB concepts considered for DEMO (helium- and water-cooled) and their structural verification for some of the most relevant thermal conditions. A 3D model of the pipes forest, both for the Helium-Cooled Pebble Bed (HCPB) and Water-Cooled Lithium Lead (WCLL) concepts, has been developed and integrated inside the DEMO Upper Port (UP), Upper Port Ring Channel, and Upper Port Annex (UPA). A preliminary structural analysis of the pipeline was carried out to check the structural integrity of the pipes, their flexibility against the thermal load, their internal pressure, and the deflection induced by the thermal expansion of the BB segments. The results showed that the secondary stress on the hot leg of the HCPB pipeline was above the limit, suggesting future improvements in its shape to increase the flexibility. Moreover, the WCLL concept did not have a critical point in terms of the secondary stress on the pipeline, since the thicknesses and the diameters of these pipes were smaller than the HCPB ones.
Open AccessEuropean DEMO Fusion Reactor: Design and Integration of the Breeding Blanket Feeding Pipes
This article describes the design and configuration of the DEMO Breeding Blanket (BB) feeding pipes inside the upper port. As large BB segments require periodic replacement via the upper vertical ports, the space inside the upper port needs to be maximized. At the same time, the size of the upper port is constrained by the available space in between the toroidal field coils and the required space to integrate a thermal shield between the vacuum vessel (VV) port and the coils. The BB feeding pipes inside the vertical port need to be removed prior to BB maintenance, as they obstruct the removal kinematics. Since they are connected to the BB segments on the top and far from their vertical support on the bottom, the pipes need to be sufficiently flexible to allow for the thermal expansion of the BB segments and the pipes themselves. The optimization and verification of these BB pipes inside the upper port design are critical aspects in the development of DEMO. This article presents the chosen pipe configuration for both BB concepts considered for DEMO (helium- and water-cooled) and their structural verification for some of the most relevant thermal conditions. A 3D model of the pipes forest, both for the Helium-Cooled Pebble Bed (HCPB) and Water-Cooled Lithium Lead (WCLL) concepts, has been developed and integrated inside the DEMO Upper Port (UP), Upper Port Ring Channel, and Upper Port Annex (UPA). A preliminary structural analysis of the pipeline was carried out to check the structural integrity of the pipes, their flexibility against the thermal load, their internal pressure, and the deflection induced by the thermal expansion of the BB segments. The results showed that the secondary stress on the hot leg of the HCPB pipeline was above the limit, suggesting future improvements in its shape to increase the flexibility. Moreover, the WCLL concept did not have a critical point in terms of the secondary stress on the pipeline, since the thicknesses and the diameters of these pipes were smaller than the HCPB ones.
- 13 September 2021
- Published by IOP Publishing in Superconductor Science and Technology
- Vol. 34 (10) , 103001
Superconductors for fusion: a roadmap
With the first tokamak designed for full nuclear operation now well into final assembly (ITER), and a major new research tokamak starting commissioning (JT60SA), nuclear fusion is becoming a mainstream potential energy source for the future. A critical part of the viability of magnetic confinement for fusion is superconductor technology. The experience gained and lessons learned in the application of this technology to ITER and JT60SA, together with new and improved superconducting materials, is opening multiple routes to commercial fusion reactors. The objective of this roadmap is, through a series of short articles, to outline some of these routes and the materials/technologies that go with them.
- 13 September 2021
- Published by IOP Publishing in Superconductor Science and Technology
- Vol. 34 (10) , 103001
Superconductors for fusion: a roadmap
With the first tokamak designed for full nuclear operation now well into final assembly (ITER), and a major new research tokamak starting commissioning (JT60SA), nuclear fusion is becoming a mainstream potential energy source for the future. A critical part of the viability of magnetic confinement for fusion is superconductor technology. The experience gained and lessons learned in the application of this technology to ITER and JT60SA, together with new and improved superconducting materials, is opening multiple routes to commercial fusion reactors. The objective of this roadmap is, through a series of short articles, to outline some of these routes and the materials/technologies that go with them.
- 1 February 2020
- Published by Elsevier in Fusion Engineering and Design
- Vol. 151, 111357
Status of the DEMO blanket attachment system and remaining challenges
- 1 February 2020
- Published by Elsevier in Fusion Engineering and Design
- Vol. 151, 111357
Status of the DEMO blanket attachment system and remaining challenges
- Open Access
- 1 March 2010
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 81 (3) , 039903
Addendum to papers from Axially Symmetric Divertor Experiment (ASDEX) Upgrade Team, published in Review of Scientific Instruments
- 1 March 2010
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 81 (3) , 039903
Open AccessAddendum to papers from Axially Symmetric Divertor Experiment (ASDEX) Upgrade Team, published in Review of Scientific Instruments