Larissa Strömberg
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Larissa Strömberg has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Johan Silfwerbrand
Professor, KTH Royal Institute of Technology , Dept. of Civil & Architectural Engineering, Div. of Concrete Structures , Brinellvägen 23, SE 100 44 Stockholm , Sweden
1 shared publication - Saima Yaqoob
Division of Concrete Structures, Department of Civil & Architectural Engineering, KTH Royal Institute of Technology, SE-10044 Stockholm, Sweden
1 shared publication
Latest Publications
- Open Access
- 1 December 2021
- Published by Walter de Gruyter GmbH in Nordic Concrete Research
- Vol. 65 (2) , 107-128
Evaluation of Rapid Repair of Concrete Pavements Using Precast Concrete Technology: A Sustainable and Cost-Effective Solution
Concrete and asphalt are the two competitive materials for a highway. In Sweden, the predominant material for the highway system is asphalt. But under certain conditions, concrete pavements are competitive alternatives. For example, concrete pavements are suitable for high-traffic volume roads, roads in tunnels, concentrated loads (e.g., bus stops and industrial pavement). Besides the load-carrying capacity, the concrete pavement has many advantages such as durability (wear resistance), resistance against frost heave, environment (pollution, recycling, and low rolling resistance leading to fuel savings), fire resistance, noise limitations, brightness, evenness and aesthetics. Concrete pavements are long-lasting but need final repair. Single slabs may crack in the jointed concrete pavement due to various structural and non-structural factors. Repair and maintenance operations are, therefore, necessary to increase the service life of the structures. To avoid extended lane closures, prevent traffic congestions, and expedite the pavement construction process, precast concrete technology is a recent innovative construction method that can meet the requirement of rapid construction and rehabilitation of the pavement. This paper evaluates rapid repair techniques of concrete pavement using precast concrete technology by analysing three case studies on jointed precast concrete pavements. The study showed that the required amount of time to re-open the pavement to traffic is dramatically reduced with jointed precast concrete panels.
- 1 December 2021
- Published by Walter de Gruyter GmbH in Nordic Concrete Research
- Vol. 65 (2) , 107-128
Open AccessEvaluation of Rapid Repair of Concrete Pavements Using Precast Concrete Technology: A Sustainable and Cost-Effective Solution
Concrete and asphalt are the two competitive materials for a highway. In Sweden, the predominant material for the highway system is asphalt. But under certain conditions, concrete pavements are competitive alternatives. For example, concrete pavements are suitable for high-traffic volume roads, roads in tunnels, concentrated loads (e.g., bus stops and industrial pavement). Besides the load-carrying capacity, the concrete pavement has many advantages such as durability (wear resistance), resistance against frost heave, environment (pollution, recycling, and low rolling resistance leading to fuel savings), fire resistance, noise limitations, brightness, evenness and aesthetics. Concrete pavements are long-lasting but need final repair. Single slabs may crack in the jointed concrete pavement due to various structural and non-structural factors. Repair and maintenance operations are, therefore, necessary to increase the service life of the structures. To avoid extended lane closures, prevent traffic congestions, and expedite the pavement construction process, precast concrete technology is a recent innovative construction method that can meet the requirement of rapid construction and rehabilitation of the pavement. This paper evaluates rapid repair techniques of concrete pavement using precast concrete technology by analysing three case studies on jointed precast concrete pavements. The study showed that the required amount of time to re-open the pavement to traffic is dramatically reduced with jointed precast concrete panels.