Ya-Meng He
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Ya-Meng He has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Fei Zhang
Key Laboratory of Roads and Railway Engineering Safety Control, Shijiazhuang Tiedao University, Ministry of Education, Shijiazhuang, China
2 shared publications - Tianliang Wang
School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, China
2 shared publications - Hong-Fang Song
State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication - Yang Wang
Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education, Shijiazhuang Tiedao University, Shijiazhuang 050043, China
1 shared publication - Yu Shu
State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication - Zhen Wu
Jinan Design Institute, China Railway Engineering Consulting Group Co. Ltd., Jinan 250022, China
1 shared publication
Latest Publications
- Open Access
Temperature Field of Artificially Frozen Gravel Formation and Optimization of Freezing Pipe Layout Parameters under Seepage Flow
An artificial ground freezing method is often applied to highly permeable gravel formations. Seepage flow increases energy consumption and engineering accidents under this condition. Based on the physical modeling tests, the numerical simulations were conducted. The physical modeling test examined the development of the temperature and frozen wall. Numerical modeling integrated with the ACO algorithm was established to optimize the layout parameters of the freezing pipes. The results indicate that the flowing water prolongs the closure time of the frozen wall. Meanwhile, the total thickness of the frozen wall is also reduced by the flowing water. There are significant differences in the development rates of the frozen wall in different zones. The thickness of the entire frozen wall is nonuniform owing to the seepage flow. Following optimization using the proposed algorithm, the closure time was shortened from 82.4 d to 56.9 d for the frozen wall. Moreover, the freezing efficiency increased by 30.95% after optimization, and consequently, the entire frozen wall was more uniform with a nonweak zone. A case study showed that this optimization system is an effective method for artificial ground freezing operations in geotechnical engineering.
Open AccessTemperature Field of Artificially Frozen Gravel Formation and Optimization of Freezing Pipe Layout Parameters under Seepage Flow
An artificial ground freezing method is often applied to highly permeable gravel formations. Seepage flow increases energy consumption and engineering accidents under this condition. Based on the physical modeling tests, the numerical simulations were conducted. The physical modeling test examined the development of the temperature and frozen wall. Numerical modeling integrated with the ACO algorithm was established to optimize the layout parameters of the freezing pipes. The results indicate that the flowing water prolongs the closure time of the frozen wall. Meanwhile, the total thickness of the frozen wall is also reduced by the flowing water. There are significant differences in the development rates of the frozen wall in different zones. The thickness of the entire frozen wall is nonuniform owing to the seepage flow. Following optimization using the proposed algorithm, the closure time was shortened from 82.4 d to 56.9 d for the frozen wall. Moreover, the freezing efficiency increased by 30.95% after optimization, and consequently, the entire frozen wall was more uniform with a nonweak zone. A case study showed that this optimization system is an effective method for artificial ground freezing operations in geotechnical engineering.
- Open Access
- 20 January 2022
- Published by Wiley in Advances in Materials Science and Engineering
- Vol. 2022, 1-11
Experimental Study on Temperature Field Evolution Mechanism of Artificially Frozen Gravel Formation under Groundwater Seepage Flow
Artificially ground freezing method is increasingly applied in formations with high permeability. The groundwater seepage flow should be considered because an excessive groundwater seepage flow would make the merging of the frozen wall challenging. Therefore, in this study, we investigate the temperature field and frozen wall merging characteristics at varying groundwater seepage flow rates in gravel formation. Results show that the heat exchange between the seepage flow and freezing pipes delays the merging of the frozen wall and reduces its total thickness. The groundwater seepage flow restricts the freezing of the upstream zone and accelerates the freezing of the downstream zone. The upstream and downstream temperature fields are symmetrical in nonseepage flow conditions but are asymmetrical in the presence of seepage flow. The merged frozen wall presents an arched shape and shifts to the downstream zone. The “scouring effect” and “water barrier effect” simultaneously act on the merging process of the frozen wall. The total thickness of the frozen wall decreases by more than 30% when the flow rate increases from 0 to 5.0 m/d. Optimising the layout of the freezing pipes in gravel formations is a reasonable solution for a safe and economical design.
- 20 January 2022
- Published by Wiley in Advances in Materials Science and Engineering
- Vol. 2022, 1-11
Open AccessExperimental Study on Temperature Field Evolution Mechanism of Artificially Frozen Gravel Formation under Groundwater Seepage Flow
Artificially ground freezing method is increasingly applied in formations with high permeability. The groundwater seepage flow should be considered because an excessive groundwater seepage flow would make the merging of the frozen wall challenging. Therefore, in this study, we investigate the temperature field and frozen wall merging characteristics at varying groundwater seepage flow rates in gravel formation. Results show that the heat exchange between the seepage flow and freezing pipes delays the merging of the frozen wall and reduces its total thickness. The groundwater seepage flow restricts the freezing of the upstream zone and accelerates the freezing of the downstream zone. The upstream and downstream temperature fields are symmetrical in nonseepage flow conditions but are asymmetrical in the presence of seepage flow. The merged frozen wall presents an arched shape and shifts to the downstream zone. The “scouring effect” and “water barrier effect” simultaneously act on the merging process of the frozen wall. The total thickness of the frozen wall decreases by more than 30% when the flow rate increases from 0 to 5.0 m/d. Optimising the layout of the freezing pipes in gravel formations is a reasonable solution for a safe and economical design.