Shufeng Lai
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shufeng Lai has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Xingbi Lei
Key Laboratory of Disaster Prevention and Structural Safety of the Ministry of Education, Nanning 530004, China
3 shared publications - Chongxun Mo
College of Architecture and Civil Engineering, Guangxi University, Nanning 530004, China
2 shared publications - Guikai Sun
College of Architecture and Civil Engineering, Guangxi University, Nanning 530004, China
2 shared publications - Yuli Ruan
College of Architecture and Civil Engineering, Guangxi University, Nanning 530004, China
2 shared publications - Zhenxiang Xing
School of Water Conservancy and Civil Engineering, Northeast Agricultural University, Harbin 150030, China
2 shared publications Changhao Jiang
Key Laboratory of Disaster Prevention and Structural Safety of Ministry of Education, Guangxi University, Nanning, 530004, China; College of Architecture and Civil Engineering, Guangxi University, Nanning, 530004, China; Guangxi Key Laboratory of Disaster Prevention and Engineering Safety, Guangxi University, Nanning, 530004, China
1 shared publication
Latest Publications
- 31 January 2023
- Published by Elsevier in Journal of Environmental Management
- Vol. 332, 117380
A comprehensive assessment of runoff dynamics in response to climate change and human activities in a typical karst watershed, southwest China
- 31 January 2023
- Published by Elsevier in Journal of Environmental Management
- Vol. 332, 117380
A comprehensive assessment of runoff dynamics in response to climate change and human activities in a typical karst watershed, southwest China
- Open Access
Flood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir
A reasonable flood season delineation can effectively implement staged reservoir scheduling and improve water resource efficiency. Therefore, this study is aimed at analyzing the flood period segmentation and optimizing the staged flood limit water levels (FLWLs) for a multi-purpose reservoir, the Longtan Reservoir, China. The rainfall seasonality index () and the runoff seasonality index () are used to evaluate the feasibility and rationality of the flood period staging. The fractal method is then used to segment the flood season. Finally, the design flood is carried out to optimize the staged FLWLs. The results show that the is an effective indicator for judging the feasibility and verifying the rationality of flood segmentation. The flood period can be segmented into the pre-flood season (12 April–29 May), the main flood season (30 May–3 September), and the post-flood season (4 September–9 November). The FLWLs in the main flood and the post-flood season can be raised by 2.05 m and 3.45 m, and the effective reservoir capacity is increased by 5.810 billion m3 and 6.337 billion m3, according to the results of the flood season division.Open AccessFlood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir
A reasonable flood season delineation can effectively implement staged reservoir scheduling and improve water resource efficiency. Therefore, this study is aimed at analyzing the flood period segmentation and optimizing the staged flood limit water levels (FLWLs) for a multi-purpose reservoir, the Longtan Reservoir, China. The rainfall seasonality index () and the runoff seasonality index () are used to evaluate the feasibility and rationality of the flood period staging. The fractal method is then used to segment the flood season. Finally, the design flood is carried out to optimize the staged FLWLs. The results show that the is an effective indicator for judging the feasibility and verifying the rationality of flood segmentation. The flood period can be segmented into the pre-flood season (12 April–29 May), the main flood season (30 May–3 September), and the post-flood season (4 September–9 November). The FLWLs in the main flood and the post-flood season can be raised by 2.05 m and 3.45 m, and the effective reservoir capacity is increased by 5.810 billion m3 and 6.337 billion m3, according to the results of the flood season division. - Open Access
Research on Reservoir Optimal Operation Based on Long-Term and Mid-Long-Term Nested Models
In order to solve the problem that the existing optimal operation model of reservoirs cannot coordinate the contradiction between long-term and short-term benefits, the paper nested the long-term optimal operation and mid-long-term optimal operations of reservoirs and established the multi-objective optimal operation nested model of reservoirs. At the same time, based on this model, the optimal control mode is determined when there are errors in the predicted runoff. In the optimal scheduling nested model, the dynamic programming algorithm is used to determine the long-term optimal scheduling solution, and the genetic algorithm is used to solve the mid-long-term optimal scheduling. The optimal control mode is determined by three indicators: power generation benefit, water level over limit risk rate and the not-exploited water volume. The results show that, on the premise of meeting the flood control objectives, the nested model optimal dispatching plan has higher benefits than the long-term optimal dispatching plan and the actual dispatching plan, which verifies the superiority of the nested model in the reservoir optimal dispatching problem. When there is error in predicting runoff, among the water level control mode, flow control mode and output control mode, the average power generation benefit of output control mode is 150.05 GW·h, the low-risk rate of water level overrun is 0.29, and the not-exploited water volume is 39,270 m3. Compared with the water level control mode and the flow control mode, the output control mode has the advantages of higher power generation efficiency, lower water level over limit risk rate and less not-exploited water volume. Therefore, from the perspective of economic benefit and risk balance, the output control mode in the optimization scheduling nested mode is the optimal control mode.
Open AccessResearch on Reservoir Optimal Operation Based on Long-Term and Mid-Long-Term Nested Models
In order to solve the problem that the existing optimal operation model of reservoirs cannot coordinate the contradiction between long-term and short-term benefits, the paper nested the long-term optimal operation and mid-long-term optimal operations of reservoirs and established the multi-objective optimal operation nested model of reservoirs. At the same time, based on this model, the optimal control mode is determined when there are errors in the predicted runoff. In the optimal scheduling nested model, the dynamic programming algorithm is used to determine the long-term optimal scheduling solution, and the genetic algorithm is used to solve the mid-long-term optimal scheduling. The optimal control mode is determined by three indicators: power generation benefit, water level over limit risk rate and the not-exploited water volume. The results show that, on the premise of meeting the flood control objectives, the nested model optimal dispatching plan has higher benefits than the long-term optimal dispatching plan and the actual dispatching plan, which verifies the superiority of the nested model in the reservoir optimal dispatching problem. When there is error in predicting runoff, among the water level control mode, flow control mode and output control mode, the average power generation benefit of output control mode is 150.05 GW·h, the low-risk rate of water level overrun is 0.29, and the not-exploited water volume is 39,270 m3. Compared with the water level control mode and the flow control mode, the output control mode has the advantages of higher power generation efficiency, lower water level over limit risk rate and less not-exploited water volume. Therefore, from the perspective of economic benefit and risk balance, the output control mode in the optimization scheduling nested mode is the optimal control mode.