Wei Gan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Wei Gan has a total of 46 co-authors. Here are the top co-authors by number of shared publications:
- Mingyu Yan
Huazhong University of Science and Technology
4 shared publications - Houbo Xiong
Zhejiang University
3 shared publications - Jinyu Wen
Huazhong University of Science and Technology
3 shared publications Aleksandar Vukojevic
Commonwealth Edison Company Oakbrook Terrace, Oakbrook Terrace, IL, USA
2 shared publications- Chia-Chi Chu
Department of Electrical Engineering, National Tsing Hua University, Hsinchu, Taiwan
2 shared publications - Chuangxin Guo
Zhejiang University
2 shared publications
Latest Publications
- 1 September 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 17 (5) , 4203-4214
Unified Model Aggregation of Active Distribution Network With Heterogeneous Uncertain Distributed Energy Resources
- 1 September 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 17 (5) , 4203-4214
Unified Model Aggregation of Active Distribution Network With Heterogeneous Uncertain Distributed Energy Resources
- 7 August 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (6) , 13029-13043
Enhancing the Resilience of Coupled Power Distribution and Transportation Networks Using Multiperiod Robust Dynamic Planning
To safeguard modern energy systems against the increasingly frequent extreme events, this article proposes a multiperiod planning model for the resilience enhancement of coupled power distribution networks (PDNs) and urban transportation networks (UTN). The proposed planning model determine the location and capacity expansion of electric vehicle (EV) charging stations, alongside the hardening of power lines, to effectively accommodate variable resource, demand and potential extreme events over multiple planning periods. A dynamic programming (DP) formulated multistage robust optimization (RO) model is proposed to address multiple uncertainties over the planning duration, in which the investment decisions are made sequentially by using the present-period information for adhering to non-anticipative constraints. To efficiently solve the planning model, the multistage RO problem is decomposed by a developed robust dual DP (RDDP) based method, where approximate convex hulls and Lagrangian hyperplanes are utilized to iteratively refine the cost-to-go functions until convergence. Numerical experiments conducted on both a 33-bus PDN with a 12-node UTN and a larger 54-bus PDN with a 25-node UTN demonstrate the efficacy and applicability of the proposed planning model and solution technique.
- 7 August 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (6) , 13029-13043
Enhancing the Resilience of Coupled Power Distribution and Transportation Networks Using Multiperiod Robust Dynamic Planning
To safeguard modern energy systems against the increasingly frequent extreme events, this article proposes a multiperiod planning model for the resilience enhancement of coupled power distribution networks (PDNs) and urban transportation networks (UTN). The proposed planning model determine the location and capacity expansion of electric vehicle (EV) charging stations, alongside the hardening of power lines, to effectively accommodate variable resource, demand and potential extreme events over multiple planning periods. A dynamic programming (DP) formulated multistage robust optimization (RO) model is proposed to address multiple uncertainties over the planning duration, in which the investment decisions are made sequentially by using the present-period information for adhering to non-anticipative constraints. To efficiently solve the planning model, the multistage RO problem is decomposed by a developed robust dual DP (RDDP) based method, where approximate convex hulls and Lagrangian hyperplanes are utilized to iteratively refine the cost-to-go functions until convergence. Numerical experiments conducted on both a 33-bus PDN with a 12-node UTN and a larger 54-bus PDN with a 25-node UTN demonstrate the efficacy and applicability of the proposed planning model and solution technique.
- Open Access
- 2 July 2025
- Published by Elsevier in Advances in Applied Energy
- Vol. 19
Net Zero without the gridlock through peer-to-peer coordinated flexibility
- 2 July 2025
- Published by Elsevier in Advances in Applied Energy
- Vol. 19
Open AccessNet Zero without the gridlock through peer-to-peer coordinated flexibility
- 4 June 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 17 (1) , 467-482
Coordinated Scheduling of EV Charging Service and Energy Arbitrage for Truck Mobile Charging Stations
Truck mobile charging stations (TMCS) have emerged as a promising complement to fixed charging stations (FCS), sparking increased interest in recent years. However, the potential applications of TMCS have yet to be fully explored, which impedes its economic feasibility and widespread adoption. Therefore, this paper aims to address this gap by proposing a two-stage scheduling model for TMCS, focusing on coordinating its operation between electric vehicle (EV) charging services and energy arbitrage. In this model, an EV charging demand generation model is formulated to capture the charging behavior of EV users between FCS and TMCS. Additionally, an extended graph model is developed to depict the dynamic characteristics between different service provisions of TMCS. To account for the impact of EV charging demand uncertainty on operator profit, a two-stage optimal scheduling model based on lookahead rolling horizon-value function approximation (LRH-VFA) is established. By offline learning from historical data, the impact of current decisions on future periods is considered. Subsequently, using short-term forecast data and real-time information, the online optimization results are rolling updated and outputted. Numerical studies demonstrate that the proposed method can effectively enhance the utilization and economy of TMCS.
- 4 June 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 17 (1) , 467-482
Coordinated Scheduling of EV Charging Service and Energy Arbitrage for Truck Mobile Charging Stations
Truck mobile charging stations (TMCS) have emerged as a promising complement to fixed charging stations (FCS), sparking increased interest in recent years. However, the potential applications of TMCS have yet to be fully explored, which impedes its economic feasibility and widespread adoption. Therefore, this paper aims to address this gap by proposing a two-stage scheduling model for TMCS, focusing on coordinating its operation between electric vehicle (EV) charging services and energy arbitrage. In this model, an EV charging demand generation model is formulated to capture the charging behavior of EV users between FCS and TMCS. Additionally, an extended graph model is developed to depict the dynamic characteristics between different service provisions of TMCS. To account for the impact of EV charging demand uncertainty on operator profit, a two-stage optimal scheduling model based on lookahead rolling horizon-value function approximation (LRH-VFA) is established. By offline learning from historical data, the impact of current decisions on future periods is considered. Subsequently, using short-term forecast data and real-time information, the online optimization results are rolling updated and outputted. Numerical studies demonstrate that the proposed method can effectively enhance the utilization and economy of TMCS.
- 9 May 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 16 (4) , 3195-3209
A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response
With the proliferation of electric vehicles (EVs), vehicle-to-grid (V2G) capability emerges as a potential resource for load restoration after a large disruption. This paper presents a real-time post-disaster load restoration method for the coordinated power distribution networks (PDN) and urban traffic networks (UTN) with V2G response. The multi-period restoration problem is modeled as a dynamic programming-based multi-stage robust optimization model, addressing uncertainties of renewable generation and traffic demands. It incorporates a dynamic traffic assignment scheme to characterize vehicle travels and V2G services within short time slots. Then, an improved robust dual dynamic programming algorithm is proposed to solve the multi-stage robust optimization problem. For online application, the solved value functions from each stage serve as per-period policies, leveraging knowledge of future uncertainties to quickly guide real-time load restoration through distributed resource dispatch, network reconfiguration, and V2G assignments. Numerical experiments with a 33-bus PDN and 20-road UTN, plus a real-world 91-bus PDN with 35-road UTN, validate the effectiveness of proposed restoration method.
- 9 May 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 16 (4) , 3195-3209
A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response
With the proliferation of electric vehicles (EVs), vehicle-to-grid (V2G) capability emerges as a potential resource for load restoration after a large disruption. This paper presents a real-time post-disaster load restoration method for the coordinated power distribution networks (PDN) and urban traffic networks (UTN) with V2G response. The multi-period restoration problem is modeled as a dynamic programming-based multi-stage robust optimization model, addressing uncertainties of renewable generation and traffic demands. It incorporates a dynamic traffic assignment scheme to characterize vehicle travels and V2G services within short time slots. Then, an improved robust dual dynamic programming algorithm is proposed to solve the multi-stage robust optimization problem. For online application, the solved value functions from each stage serve as per-period policies, leveraging knowledge of future uncertainties to quickly guide real-time load restoration through distributed resource dispatch, network reconfiguration, and V2G assignments. Numerical experiments with a 33-bus PDN and 20-road UTN, plus a real-world 91-bus PDN with 35-road UTN, validate the effectiveness of proposed restoration method.
- 31 August 2024
- Published by Elsevier in Applied Energy
- Vol. 376
Cooperative V2G-enabled vehicle-to-vehicle sharing in energy and reserve markets: A coalitional approach
- 31 August 2024
- Published by Elsevier in Applied Energy
- Vol. 376
Cooperative V2G-enabled vehicle-to-vehicle sharing in energy and reserve markets: A coalitional approach
- 17 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 16 (1) , 491-504
Robust Resilience Enhancement by EV Charging Infrastructure Planning in Coupled Power Distribution and Transportation Systems
Due to the recent rapid developments in fast charging technology for electric vehicles (EVs), these flexible mobile storage resources can provide auxiliary services to the power grid in emergency circumstances. Therefore, it is imperative to develop a resilient enhancement planning scheme for this coupled network under severe contingencies. To this end, this paper investigates a novel robust resilient enhancement scheme for planning charging infrastructure in coupled networks. The objective is to minimize both (i) the investment and operation cost of the coupled network under uncertain traffic demands, and (ii) the EV participation cost for the grid support scheme during contingencies. The investment scheme for power distribution lines and charging stations is determined before the uncertainty realization in the first stage, while the objective function is minimized in the worst possible manner within a specified uncertainty set in the second stage. The nested column-and-constraint generation (NC&CG) algorithm is applied to solve this robust optimization problem. Numerical simulations of two coupled networks are conducted to demonstrate the effectiveness of the proposed robust resilience enhancement scheme.
- 17 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Smart Grid
- Vol. 16 (1) , 491-504
Robust Resilience Enhancement by EV Charging Infrastructure Planning in Coupled Power Distribution and Transportation Systems
Due to the recent rapid developments in fast charging technology for electric vehicles (EVs), these flexible mobile storage resources can provide auxiliary services to the power grid in emergency circumstances. Therefore, it is imperative to develop a resilient enhancement planning scheme for this coupled network under severe contingencies. To this end, this paper investigates a novel robust resilient enhancement scheme for planning charging infrastructure in coupled networks. The objective is to minimize both (i) the investment and operation cost of the coupled network under uncertain traffic demands, and (ii) the EV participation cost for the grid support scheme during contingencies. The investment scheme for power distribution lines and charging stations is determined before the uncertainty realization in the first stage, while the objective function is minimized in the worst possible manner within a specified uncertainty set in the second stage. The nested column-and-constraint generation (NC&CG) algorithm is applied to solve this robust optimization problem. Numerical simulations of two coupled networks are conducted to demonstrate the effectiveness of the proposed robust resilience enhancement scheme.