Ibrahim Diab
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Ibrahim Diab has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Pavol Bauer
Delft University of Technology
8 shared publications - Gautham Ram Chandra Mouli
Delft University of Technology, the Netherlands
7 shared publications Alice Saffirio
3 shared publications- Mattia Ricco
University of Bologna
2 shared publications - Rudolf Francesco Paternost
Department of Electrical, Electronic, and Information Engineering, University of Bologna, 40136 Bologna, Italy
2 shared publications Abhishek Singh Tomar
HAN Automotive Research, HAN University of Applied Sciences, Arnhem, The Netherlands
1 shared publication
Latest Publications
- Open Access
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Open Journal of Power Electronics
- Vol. 7, 586-598
Design Trade-Offs and Selection Guidelines for Isolated and Nonisolated Converters for In-Motion-Charging Buses
The increase in electrified transport has elevated the role of electric buses (e-buses) in addressing urban mobility challenges. Among the types of e-buses, there is the in-motion-charging (IMC) trolleybus, which is powered by DC overhead contact lines and has an on-board battery for traction outside overhead lines. A key challenge for IMC buses is the selection of the optimal on-board-charger (OBC) topology for charging their batteries. Ideally, the chosen OBC should have low weight and volume, in addition to operating with high efficiency levels. Additionally, there is a growing need for isolated DC-DC converter topologies to enhance safety and reduce the risk of electric shocks. However, the isolated topologies tend to have higher volume and weight and reduced efficiency due to the need for a high-frequency transformer (HFT). In this context, this article aims to provide design trade-offs and guidelines for choosing between isolated and non-isolated topologies for OBC in IMC trolleybuses, based on an analysis of their efficiency, weight, volume, and cost. A non-isolated interleaved buck-boost (IBB) and an isolated dual-active-bridge (DAB) converters are taken as the study-case. Results indicate strong potential for the IBB at switching frequencies above $75\ \rm {kHz}$, primarily due to a significant reduction in the weight and volume of the magnetic components, with the weight of IBB being about 0.84 times that of the DAB at $100\ \rm {kHz}$ switching frequency. For lower frequencies, the DAB converter presents advantages in terms of magnetic compactness. The efficiency of both topologies remains at similar levels, with a slight advantage for the non-isolated one, achieving an average efficiency of up to 99.07%.
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Open Journal of Power Electronics
- Vol. 7, 586-598
Open AccessDesign Trade-Offs and Selection Guidelines for Isolated and Nonisolated Converters for In-Motion-Charging Buses
The increase in electrified transport has elevated the role of electric buses (e-buses) in addressing urban mobility challenges. Among the types of e-buses, there is the in-motion-charging (IMC) trolleybus, which is powered by DC overhead contact lines and has an on-board battery for traction outside overhead lines. A key challenge for IMC buses is the selection of the optimal on-board-charger (OBC) topology for charging their batteries. Ideally, the chosen OBC should have low weight and volume, in addition to operating with high efficiency levels. Additionally, there is a growing need for isolated DC-DC converter topologies to enhance safety and reduce the risk of electric shocks. However, the isolated topologies tend to have higher volume and weight and reduced efficiency due to the need for a high-frequency transformer (HFT). In this context, this article aims to provide design trade-offs and guidelines for choosing between isolated and non-isolated topologies for OBC in IMC trolleybuses, based on an analysis of their efficiency, weight, volume, and cost. A non-isolated interleaved buck-boost (IBB) and an isolated dual-active-bridge (DAB) converters are taken as the study-case. Results indicate strong potential for the IBB at switching frequencies above $75\ \rm {kHz}$, primarily due to a significant reduction in the weight and volume of the magnetic components, with the weight of IBB being about 0.84 times that of the DAB at $100\ \rm {kHz}$ switching frequency. For lower frequencies, the DAB converter presents advantages in terms of magnetic compactness. The efficiency of both topologies remains at similar levels, with a slight advantage for the non-isolated one, achieving an average efficiency of up to 99.07%.
- 6 October 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 62 (2) , 2406-2417
Real-Time-Simulation Benchmark Study for Infrastructure Upgrades in DC Railway Systems
Many DC energy solutions have emerged as potential candidates to enhance the electrical infrastructure in a localized approach, allowing future expansion in the transportation sector despite the congestion of the utility grid. However, the risk of designing large power converter units as controllable substations in complex networks, such as electric railway systems, has encouraged the sophistication of modeling and testing tools. This paper presents a high-fidelity, real-time model implementation of a controllable substation for DC traction power systems. This representative model is developed to facilitate the testing of different upgrading options to understand and quantify how these changes will affect the system and, more importantly, which features are critical to further increasing the sustainability of the railways. This is applied to a case study of the Dutch railway system in Wierden. It is found that while controllable substations can reduce voltage drops from an average of 400 V to only about 230 V, the benefit they bring in regenerative braking harvesting does not outweigh the investment costs, calling for further investigation of energy storage systems as another potential solution.
- 6 October 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 62 (2) , 2406-2417
Real-Time-Simulation Benchmark Study for Infrastructure Upgrades in DC Railway Systems
Many DC energy solutions have emerged as potential candidates to enhance the electrical infrastructure in a localized approach, allowing future expansion in the transportation sector despite the congestion of the utility grid. However, the risk of designing large power converter units as controllable substations in complex networks, such as electric railway systems, has encouraged the sophistication of modeling and testing tools. This paper presents a high-fidelity, real-time model implementation of a controllable substation for DC traction power systems. This representative model is developed to facilitate the testing of different upgrading options to understand and quantify how these changes will affect the system and, more importantly, which features are critical to further increasing the sustainability of the railways. This is applied to a case study of the Dutch railway system in Wierden. It is found that while controllable substations can reduce voltage drops from an average of 400 V to only about 230 V, the benefit they bring in regenerative braking harvesting does not outweigh the investment costs, calling for further investigation of energy storage systems as another potential solution.
- Open Access
- 17 September 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 140211-140222
Stationary Energy Storage Solutions and Power Management for Bus Fleet Electrification in Congested Grid Areas
In the presence of a catenary infrastructure, the transition from fossil fuel-based bus fleets to electric-powered ones can be facilitated through conventional trolleybuses or In-Motion-Charging trolleybuses, offering environmentally friendly and cost-effective solutions. However, grid congestion at traction substations (TSs) can limit this transition as the grid operator is incapable or unwilling to provide more capacity. As grid connection contracts are typically tallied and billed in periods of 15 minutes, stationary energy storage devices can prove useful in short-term buffering of the power demand. Consequently, more electrification projects can be rolled out under the same, or minimally extended grid contract. In this aim, this paper looks at validating energy storage as a means of enabling bus fleet electrification. It presents a power management strategy that controls the power exchange between the energy storage system (ESS) within the TS, specifically to manage the 15-minute average power. This strategy also serves as a tool for sizing the ESS with the minimum capacity required for the application. A case study for the city of Bologna, Italy, has been considered to validate the proposed approach. The findings indicate that billing contract power can be reduced by up to 41.7% when a storage device actuates in high-energy-demand substations. Furthermore, different types of Lithium-ion cells, including their second-life versions, are compared to determine the most beneficial options under limited cost and volume constraints. Recommendations are drawn on the exact scenarios where each type of cell is most beneficial.
- 17 September 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 140211-140222
Open AccessStationary Energy Storage Solutions and Power Management for Bus Fleet Electrification in Congested Grid Areas
In the presence of a catenary infrastructure, the transition from fossil fuel-based bus fleets to electric-powered ones can be facilitated through conventional trolleybuses or In-Motion-Charging trolleybuses, offering environmentally friendly and cost-effective solutions. However, grid congestion at traction substations (TSs) can limit this transition as the grid operator is incapable or unwilling to provide more capacity. As grid connection contracts are typically tallied and billed in periods of 15 minutes, stationary energy storage devices can prove useful in short-term buffering of the power demand. Consequently, more electrification projects can be rolled out under the same, or minimally extended grid contract. In this aim, this paper looks at validating energy storage as a means of enabling bus fleet electrification. It presents a power management strategy that controls the power exchange between the energy storage system (ESS) within the TS, specifically to manage the 15-minute average power. This strategy also serves as a tool for sizing the ESS with the minimum capacity required for the application. A case study for the city of Bologna, Italy, has been considered to validate the proposed approach. The findings indicate that billing contract power can be reduced by up to 41.7% when a storage device actuates in high-energy-demand substations. Furthermore, different types of Lithium-ion cells, including their second-life versions, are compared to determine the most beneficial options under limited cost and volume constraints. Recommendations are drawn on the exact scenarios where each type of cell is most beneficial.
- Open Access
- 24 October 2023
- Published by Elsevier in Applied Energy
- Vol. 353
A shared PV system for transportation and residential loads to reduce curtailment and the need for storage systems
- 24 October 2023
- Published by Elsevier in Applied Energy
- Vol. 353
Open AccessA shared PV system for transportation and residential loads to reduce curtailment and the need for storage systems
- 5 October 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 25 (3) , 2669-2680
A Traction Substation State Estimator for Integrating Smart Loads in Transportation Grids Without the Need for Additional Sensors
Public electric transport grids tend to be oversized and underutilized. Therefore, they can become sustainable and multi-functional backbones to the city AC grid by integrating smart grid elements into their infrastructures. However, integrating smart grid loads and renewables requires a large array of wirelessly communicating sensors across the traction substations, the smart grid components, and each vehicle of the transport fleet. This can be both costly and technically complex. This paper proposes an analytical state estimator that can predict vehicle traffic count and spare power capacity under a traction substation without the use of any additional sensors. The estimator uses existing, locally available measurements at any power node on the traction section to inform the decision-making of the power management scheme at that node. Validating the results with up to 100000 stochastic test simulations of a verified traction grid model, up to 76% of the monitored conditions were detected, with no false positives, and without the need for additional sensors and wireless communication.
- 5 October 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 25 (3) , 2669-2680
A Traction Substation State Estimator for Integrating Smart Loads in Transportation Grids Without the Need for Additional Sensors
Public electric transport grids tend to be oversized and underutilized. Therefore, they can become sustainable and multi-functional backbones to the city AC grid by integrating smart grid elements into their infrastructures. However, integrating smart grid loads and renewables requires a large array of wirelessly communicating sensors across the traction substations, the smart grid components, and each vehicle of the transport fleet. This can be both costly and technically complex. This paper proposes an analytical state estimator that can predict vehicle traffic count and spare power capacity under a traction substation without the use of any additional sensors. The estimator uses existing, locally available measurements at any power node on the traction section to inform the decision-making of the power management scheme at that node. Validating the results with up to 100000 stochastic test simulations of a verified traction grid model, up to 76% of the monitored conditions were detected, with no false positives, and without the need for additional sensors and wireless communication.
- Open Access
- 1 August 2023
- Published by Elsevier in eTransportation
- Vol. 18
Methods for increasing the potential of integration of EV chargers into the DC catenary of electric transport grids: A trolleygrid case study
- 1 August 2023
- Published by Elsevier in eTransportation
- Vol. 18
Open AccessMethods for increasing the potential of integration of EV chargers into the DC catenary of electric transport grids: A trolleygrid case study
- 6 February 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 9 (3) , 4531-4540
An Adaptive Battery Charging Method for the Electrification of Diesel or CNG Buses as In-Motion-Charging Trolleybuses
The decarbonization of urban bus fleets can be made by their electrification as In-Motion-Charging (IMC) buses which can run both as trolleybuses or in battery-mode. The benefit is that IMC buses can use the existing trolleygrid infrastructure where their route overlaps with it to charge the battery, and operate in battery-mode outside of it. Presently, the IMC battery charging power is set conservatively to the minimum of all the spare capacities of the traction substations found along the bus route. This can render most electrification projects techno/economically infeasible as not enough energy is picked up for the battery-mode operation and long charging times at bus terminals are required. This paper proposes then an Adaptive Charging approach that uses the locally available spare capacity under any traction substation, taking into account the limitations of the maximum substation power and the minimum line voltage. The method is proven here both theoretically and in a case study over one full year of operation of four electrified diesel/CNG bus lines in Arnhem, the Netherlands, using comprehensive and verified trolleybus and trolleygrid models. The proposed Adaptive Charging method, as opposed to the present conservative method (here, Regular Charging), is shown to make one bus electrification project completely feasible, and reduce the extra terminal charging time for the other lines by up to 64%.
- 6 February 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 9 (3) , 4531-4540
An Adaptive Battery Charging Method for the Electrification of Diesel or CNG Buses as In-Motion-Charging Trolleybuses
The decarbonization of urban bus fleets can be made by their electrification as In-Motion-Charging (IMC) buses which can run both as trolleybuses or in battery-mode. The benefit is that IMC buses can use the existing trolleygrid infrastructure where their route overlaps with it to charge the battery, and operate in battery-mode outside of it. Presently, the IMC battery charging power is set conservatively to the minimum of all the spare capacities of the traction substations found along the bus route. This can render most electrification projects techno/economically infeasible as not enough energy is picked up for the battery-mode operation and long charging times at bus terminals are required. This paper proposes then an Adaptive Charging approach that uses the locally available spare capacity under any traction substation, taking into account the limitations of the maximum substation power and the minimum line voltage. The method is proven here both theoretically and in a case study over one full year of operation of four electrified diesel/CNG bus lines in Arnhem, the Netherlands, using comprehensive and verified trolleybus and trolleygrid models. The proposed Adaptive Charging method, as opposed to the present conservative method (here, Regular Charging), is shown to make one bus electrification project completely feasible, and reduce the extra terminal charging time for the other lines by up to 64%.
- Open Access
- 14 December 2022
- Published by Elsevier in Journal of Cleaner Production
- Vol. 384
A simple method for sizing and estimating the performance of PV systems in trolleybus grids
- 14 December 2022
- Published by Elsevier in Journal of Cleaner Production
- Vol. 384
Open AccessA simple method for sizing and estimating the performance of PV systems in trolleybus grids
- Open Access
- 1 April 2022
- Published by Elsevier in Journal of Cleaner Production
- Vol. 352
Placement and sizing of solar PV and Wind systems in trolleybus grids
- 1 April 2022
- Published by Elsevier in Journal of Cleaner Production
- Vol. 352
Open AccessPlacement and sizing of solar PV and Wind systems in trolleybus grids
- 16 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 23 (10) , 19030-19041
A Complete DC Trolleybus Grid Model With Bilateral Connections, Feeder Cables, and Bus Auxiliaries
This paper offers a complete and verified model of DC trolleybus grids and examines the effect of the common modelling assumptions made in literature by using simulations, as well as bus and substation measurements from the grid of Arnhem, the Netherlands. An equivalent model for the overhead line impedance is offered taking into account the single line impedance, the supply and return lines, and the parallel connections between them. A case study shows that the feeder cables from the substations to the sections can be ignored, but only for certain substation power and feeder-line length ranges. On the other hand, the often-neglected regenerative braking, bus auxiliaries load, bilateral connections, and the exact nominal substation voltage are found to be crucial for the correct modelling of a trolleybus grid.
- 16 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 23 (10) , 19030-19041
A Complete DC Trolleybus Grid Model With Bilateral Connections, Feeder Cables, and Bus Auxiliaries
This paper offers a complete and verified model of DC trolleybus grids and examines the effect of the common modelling assumptions made in literature by using simulations, as well as bus and substation measurements from the grid of Arnhem, the Netherlands. An equivalent model for the overhead line impedance is offered taking into account the single line impedance, the supply and return lines, and the parallel connections between them. A case study shows that the feeder cables from the substations to the sections can be ignored, but only for certain substation power and feeder-line length ranges. On the other hand, the often-neglected regenerative braking, bus auxiliaries load, bilateral connections, and the exact nominal substation voltage are found to be crucial for the correct modelling of a trolleybus grid.