Jaeho Cho
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jaeho Cho has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
Jaeyoul Chun
Professor, Department of Architectural Engineering, Dankook University, Korea
3 shared publications- Myungjin Chae
Department of Manufacturing and Construction Management, Central Connecticut State University, New Britain, CT 06050, USA
2 shared publications - Younggi Hong
Department of Architectural Engineering Dankook University Jukjeon Korea
2 shared publications Inhan Kim
Department of Architecture, Kyung Hee University, 1732, Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 446-701, Republic of Korea
1 shared publication- Jungsik Choi
Department of Urban Architecture, Kangwon National University, Samchuk-si 25913, Republic of Korea
1 shared publication
Latest Publications
- Open Access
- 18 February 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (4) , 2019
Limits of Transferring User-Defined Quantity Takeoff Rules in 2D CAD and 3D BIM Using Semantic Vertices
In construction projects, dimensioning automation is now implemented with relatively high precision in both 2D CAD and 3D BIM environments when conditions are clearly defined. For identical or similar objects with the same attributes, dimension-based quantity takeoff formulas can be automated, and such automated formulas can be repeatedly applied as long as the geometric form and attributes remain unchanged. However, this automation is feasible only within limited environments and under pre-defined rules. Once the geometry is slightly altered or geometric identity is disrupted, directly applying the existing automated mechanism becomes structurally constrained. This is because (1) quantity takeoff formulas are difficult to standardize universally, (2) object orientation is often difficult to determine consistently, and (3) even minor geometric changes can alter the meaning of dimensions, making automatic interpretation problematic. Accordingly, this study aims to systematically and experimentally analyze the practical limits of transferring semantic-vertex-based quantity takeoff formulas. To this end, a single isolated footing is adopted as a common reference object, and the limits of user-defined dimension-based automation in 2D CAD and 3D BIM environments are evaluated through three core comparisons: 1. 2D–3D reliability comparison: consistency of final quantity results within an acceptable tolerance range for the isolated footing; 2. User dependency assessment (3D-focused): the extent to which quantity takeoff formulas in 3D BIM depend on user judgment; 3. User-defined dimension transfer limits: the practical limits of transferring user-defined dimensions between geometrically identical isolated footings in both 2D and 3D environments. Through this analysis, this study empirically confirms that geometric variation is a key factor structurally constraining the transferability of user-defined quantity takeoff formulas. Furthermore, as future work, it proposes directions for linking automated dimension generation with quantity takeoff formulations.
- 18 February 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (4) , 2019
Open AccessLimits of Transferring User-Defined Quantity Takeoff Rules in 2D CAD and 3D BIM Using Semantic Vertices
In construction projects, dimensioning automation is now implemented with relatively high precision in both 2D CAD and 3D BIM environments when conditions are clearly defined. For identical or similar objects with the same attributes, dimension-based quantity takeoff formulas can be automated, and such automated formulas can be repeatedly applied as long as the geometric form and attributes remain unchanged. However, this automation is feasible only within limited environments and under pre-defined rules. Once the geometry is slightly altered or geometric identity is disrupted, directly applying the existing automated mechanism becomes structurally constrained. This is because (1) quantity takeoff formulas are difficult to standardize universally, (2) object orientation is often difficult to determine consistently, and (3) even minor geometric changes can alter the meaning of dimensions, making automatic interpretation problematic. Accordingly, this study aims to systematically and experimentally analyze the practical limits of transferring semantic-vertex-based quantity takeoff formulas. To this end, a single isolated footing is adopted as a common reference object, and the limits of user-defined dimension-based automation in 2D CAD and 3D BIM environments are evaluated through three core comparisons: 1. 2D–3D reliability comparison: consistency of final quantity results within an acceptable tolerance range for the isolated footing; 2. User dependency assessment (3D-focused): the extent to which quantity takeoff formulas in 3D BIM depend on user judgment; 3. User-defined dimension transfer limits: the practical limits of transferring user-defined dimensions between geometrically identical isolated footings in both 2D and 3D environments. Through this analysis, this study empirically confirms that geometric variation is a key factor structurally constraining the transferability of user-defined quantity takeoff formulas. Furthermore, as future work, it proposes directions for linking automated dimension generation with quantity takeoff formulations.
- Open Access
- 9 February 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (4) , 1771
Sustainable Cross-Platform Reconstruction and Reuse of Semantic-Vertex-Based BIM 3D Objects
Building Information Modeling (BIM) three-dimensional (3D) objects undergo repeated conversion and reconstruction processes for cross-platform utilization, during which geometric information loss, topological distortion, and semantic omission frequently occur, leading to fundamental limitations in accurate shape reconstruction and semantic-based functional reuse. The academic objective of this study is to overcome these limitations by proposing a three-stage sequential cross-platform reconstruction framework, consisting of semantic-vertex-based functional utilization, semantic-vertex-based invariant triangle mesh reconstruction, and semantic-vertex-based functional reuse, and to experimentally validate its effectiveness. To this end, an FBX–JSON dual-pipeline-based data management architecture is introduced to process visual geometric data and non-visual semantic metadata in parallel, thereby ensuring platform independence and data consistency. Experimental validation was conducted using IFC-based BIM objects generated in Autodesk Revit and triangle mesh models processed in Blender, at both the object and project levels. Quantitative evaluation was performed using geometric identity preservation, mesh completeness, semantic vertex restoration accuracy, and functional retention rate as the core performance indicators. The results reveal that the primary cause of mesh failure during platform transformation is face normal inconsistency, which can be stably resolved through auxiliary remeshing, thereby ensuring robust mesh reconstruction. Although the experiments were limited to round-trip transfers between Blender and Unity, the results experimentally verify the effectiveness of the proposed three-stage reconstruction framework and dual-pipeline data architecture, while also demonstrating their strong potential for generalization to broader cross-platform BIM environments.
- 9 February 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (4) , 1771
Open AccessSustainable Cross-Platform Reconstruction and Reuse of Semantic-Vertex-Based BIM 3D Objects
Building Information Modeling (BIM) three-dimensional (3D) objects undergo repeated conversion and reconstruction processes for cross-platform utilization, during which geometric information loss, topological distortion, and semantic omission frequently occur, leading to fundamental limitations in accurate shape reconstruction and semantic-based functional reuse. The academic objective of this study is to overcome these limitations by proposing a three-stage sequential cross-platform reconstruction framework, consisting of semantic-vertex-based functional utilization, semantic-vertex-based invariant triangle mesh reconstruction, and semantic-vertex-based functional reuse, and to experimentally validate its effectiveness. To this end, an FBX–JSON dual-pipeline-based data management architecture is introduced to process visual geometric data and non-visual semantic metadata in parallel, thereby ensuring platform independence and data consistency. Experimental validation was conducted using IFC-based BIM objects generated in Autodesk Revit and triangle mesh models processed in Blender, at both the object and project levels. Quantitative evaluation was performed using geometric identity preservation, mesh completeness, semantic vertex restoration accuracy, and functional retention rate as the core performance indicators. The results reveal that the primary cause of mesh failure during platform transformation is face normal inconsistency, which can be stably resolved through auxiliary remeshing, thereby ensuring robust mesh reconstruction. Although the experiments were limited to round-trip transfers between Blender and Unity, the results experimentally verify the effectiveness of the proposed three-stage reconstruction framework and dual-pipeline data architecture, while also demonstrating their strong potential for generalization to broader cross-platform BIM environments.
- Open Access
- 22 December 2025
- Published by MDPI AG in Applied Sciences
- Vol. 16 (1) , 139
Semantic-Vertex-Based Topological Detection for Automatic Dimension Generation in Building Information Modeling (BIM) with Industry Foundation Classes (IFC)
In this study, a topological matching algorithm is introduced for semantic vertex detection to automate dimension generation in a building information modeling (BIM) environment based on the Industry Foundation Classes (IFC) standard. Conventional IFC-based quantity take-off (QTO) methods provide only standardized attributes, such as height, length, width, and area; therefore, user-defined custom dimensions—such as net opening sizes or parameter lengths—must be calculated manually. This study proposes a method for fully automating the dimensions required by users by automatically tagging and visualizing semantic vertices for geometrically identical IFC objects. These semantic vertices correspond to representative topological feature points (e.g., left–bottom–origin, left–top–front, left–bottom–back, and right–bottom–front). Based on these defined semantic vertices, the method automatically establishes vertex correspondence among objects to generate dimensions. The proposed workflow comprises four main stages: (1) geometry normalization of IFC objects, (2) semantic vertex definition, (3) automatic detection of semantic vertices, and (4) dimension generation and visualization. The experimental results demonstrate that the proposed approach successfully enables the computation of dimensions for geometrically identical objects, thereby significantly improving the efficiency of QTO processes.
- 22 December 2025
- Published by MDPI AG in Applied Sciences
- Vol. 16 (1) , 139
Open AccessSemantic-Vertex-Based Topological Detection for Automatic Dimension Generation in Building Information Modeling (BIM) with Industry Foundation Classes (IFC)
In this study, a topological matching algorithm is introduced for semantic vertex detection to automate dimension generation in a building information modeling (BIM) environment based on the Industry Foundation Classes (IFC) standard. Conventional IFC-based quantity take-off (QTO) methods provide only standardized attributes, such as height, length, width, and area; therefore, user-defined custom dimensions—such as net opening sizes or parameter lengths—must be calculated manually. This study proposes a method for fully automating the dimensions required by users by automatically tagging and visualizing semantic vertices for geometrically identical IFC objects. These semantic vertices correspond to representative topological feature points (e.g., left–bottom–origin, left–top–front, left–bottom–back, and right–bottom–front). Based on these defined semantic vertices, the method automatically establishes vertex correspondence among objects to generate dimensions. The proposed workflow comprises four main stages: (1) geometry normalization of IFC objects, (2) semantic vertex definition, (3) automatic detection of semantic vertices, and (4) dimension generation and visualization. The experimental results demonstrate that the proposed approach successfully enables the computation of dimensions for geometrically identical objects, thereby significantly improving the efficiency of QTO processes.
- Open Access
- 2 June 2025
- Published by IGLC
- p. 1093-1101
Leveraging Geofencing to Enhance Safety and Achieve Lean Construction Goals on Sites
Falls are among the most frequent and hazardous incidents in the construction industry, posing significant challenges due to their unpredictability and severe consequences. In addition to fallrelated accidents, construction sites are subject to various safety hazards, underscoring the need for advanced technological solutions aligned with lean construction principles. Traditionally, hazard zones are marked using analogue methods such as boundary tapes. However, this study explores the application of geofencing technology to enhance construction site safety by providing real-time warnings to workers approaching fall hazard areas. Specifically, this research integrates two innovative geofencing-based safety technologies: (1) a smartphone-based alert system for fall hazard zones and (2) a location-based final job risk assessment tailored to specific work areas. The proposed geofencing system utilizes Closed Circuit TV (CCTV) footage to define fall hazard zones and work areas, automatically detecting worker entry and transmitting risk analysis data to their devices. By delivering real-time alerts and up-to-date risk assessments, this system contributes to lean construction objectives by minimizing delays, reducing risks, and empowering workers to make informed decisions-ultimately improving safety and efficiency on construction sites.
- 2 June 2025
- Published by IGLC
- p. 1093-1101
Open AccessLeveraging Geofencing to Enhance Safety and Achieve Lean Construction Goals on Sites
Falls are among the most frequent and hazardous incidents in the construction industry, posing significant challenges due to their unpredictability and severe consequences. In addition to fallrelated accidents, construction sites are subject to various safety hazards, underscoring the need for advanced technological solutions aligned with lean construction principles. Traditionally, hazard zones are marked using analogue methods such as boundary tapes. However, this study explores the application of geofencing technology to enhance construction site safety by providing real-time warnings to workers approaching fall hazard areas. Specifically, this research integrates two innovative geofencing-based safety technologies: (1) a smartphone-based alert system for fall hazard zones and (2) a location-based final job risk assessment tailored to specific work areas. The proposed geofencing system utilizes Closed Circuit TV (CCTV) footage to define fall hazard zones and work areas, automatically detecting worker entry and transmitting risk analysis data to their devices. By delivering real-time alerts and up-to-date risk assessments, this system contributes to lean construction objectives by minimizing delays, reducing risks, and empowering workers to make informed decisions-ultimately improving safety and efficiency on construction sites.
- Open Access
Enhancing Individual Worker Risk Awareness: A Location-Based Safety Check System for Real-Time Hazard Warnings in Work-Zones
This study focuses on improving pre-emptive risk recognition and safety checks to prevent workplace accidents. It underscores improvements by addressing existing research issues, suggesting potential enhancements through system development. Work approval procedures and workers’ prior risk awareness, through the confirmation of work safety standards in physically separated work areas, are fundamental methods of preventing serious accidents and creating a safe work environment. A key factor concerning worker safety is recognizing the potential accident risk factors (or hazards) in advance through practical job hazard analysis and consequently take risk-reduction measures in case the safety standards are not met. Despite the crucial significance of pre-awareness of work risks at the majority of construction sites, tools to enhance this awareness are currently limited. Furthermore, real-time detection of work risks and the implementation of risk reduction measures are contingent upon a monitoring environment and a robust safety culture. This study proposed construction worker location-tracking technology that recognizes personal identification (ID). A safety check system based on location tracking combining personal quick response code (QR code) recognition and computer vision technology to automatically identify workers’ personal identities and track their physical location was proposed. A real-time safety check system was implemented to classify automatically whether workers have confirmed hazards and to approve a work process in high-risk workplaces by supervisors. Location-tracking technology with ID recognition performed the following two safety management functions. First, if a construction worker does not pre-check the work risk information before entering the work zone, the geofencing technology automatically classifies workers as those who are not aware of job hazards. Secondly, the safety manager or supervisor entering the on-site work zone possesses the authority to halt work if the work environment fails to meet safety standards and can issue warnings regarding risky situations. Essential functions were validated through a case study involving preliminary testing within the development system. To assess the practical application of the system, virtual simulations were conducted using recorded videos from a construction site to replicate the two essential functions of the system. The system was constructed using an Apache server and Python code, and for testing purposes, the names of the workers were randomized.
Open AccessEnhancing Individual Worker Risk Awareness: A Location-Based Safety Check System for Real-Time Hazard Warnings in Work-Zones
This study focuses on improving pre-emptive risk recognition and safety checks to prevent workplace accidents. It underscores improvements by addressing existing research issues, suggesting potential enhancements through system development. Work approval procedures and workers’ prior risk awareness, through the confirmation of work safety standards in physically separated work areas, are fundamental methods of preventing serious accidents and creating a safe work environment. A key factor concerning worker safety is recognizing the potential accident risk factors (or hazards) in advance through practical job hazard analysis and consequently take risk-reduction measures in case the safety standards are not met. Despite the crucial significance of pre-awareness of work risks at the majority of construction sites, tools to enhance this awareness are currently limited. Furthermore, real-time detection of work risks and the implementation of risk reduction measures are contingent upon a monitoring environment and a robust safety culture. This study proposed construction worker location-tracking technology that recognizes personal identification (ID). A safety check system based on location tracking combining personal quick response code (QR code) recognition and computer vision technology to automatically identify workers’ personal identities and track their physical location was proposed. A real-time safety check system was implemented to classify automatically whether workers have confirmed hazards and to approve a work process in high-risk workplaces by supervisors. Location-tracking technology with ID recognition performed the following two safety management functions. First, if a construction worker does not pre-check the work risk information before entering the work zone, the geofencing technology automatically classifies workers as those who are not aware of job hazards. Secondly, the safety manager or supervisor entering the on-site work zone possesses the authority to halt work if the work environment fails to meet safety standards and can issue warnings regarding risky situations. Essential functions were validated through a case study involving preliminary testing within the development system. To assess the practical application of the system, virtual simulations were conducted using recorded videos from a construction site to replicate the two essential functions of the system. The system was constructed using an Apache server and Python code, and for testing purposes, the names of the workers were randomized.
- Open Access
- 20 March 2022
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2022, 1-23
Systematic Approach of TOPSIS Decision-Making for Construction Method Based on Risk Reduction Feedback of Extended QFD-FMEA
The key factors in the decision-making process are uncertainty, probability, and impact. The appropriate construction methods must be selected based on review safety requirements, which are to be adjusted accordingly depending on highly uncertain and continually changing technological requirements. The evaluation of the construction method should account for various technical characteristics of the method, including changeable safety risk reduction. In most cases, the decision maker’s insufficient knowledge and response to an uncertain and changing environment contribute primarily to the selection of inappropriate construction methods. This paper presents a feedback-based decision-making model that involves systematic safety evaluation and changing environmental risks for selecting the construction method using a technique for order preference by similarity to ideal solution (TOPSIS) model, which is a multicriteria decision-making tool, and extended quality function deployment-failure mode effect analysis (extended QFD-FMEA) simultaneously. Extended QFD-FMEA model presented herein provides an objective and quantitative analysis of risk reduction and mitigation based on the risk assessment and safety cost of construction methods. Risk factors are analyzed comprehensively to minimize safety uncertainties. The proposed decision-making process is based on a changing risk environment, where a tradeoff exists between technological options and safety issues. A case study is conducted to verify the proposed model. Results of risk assessment and possible risk reduction are presented using the extended QFD-FMEA, where two cases of feedback process in decision-making are presented for selecting the most appropriate construction method.
- 20 March 2022
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2022, 1-23
Open AccessSystematic Approach of TOPSIS Decision-Making for Construction Method Based on Risk Reduction Feedback of Extended QFD-FMEA
The key factors in the decision-making process are uncertainty, probability, and impact. The appropriate construction methods must be selected based on review safety requirements, which are to be adjusted accordingly depending on highly uncertain and continually changing technological requirements. The evaluation of the construction method should account for various technical characteristics of the method, including changeable safety risk reduction. In most cases, the decision maker’s insufficient knowledge and response to an uncertain and changing environment contribute primarily to the selection of inappropriate construction methods. This paper presents a feedback-based decision-making model that involves systematic safety evaluation and changing environmental risks for selecting the construction method using a technique for order preference by similarity to ideal solution (TOPSIS) model, which is a multicriteria decision-making tool, and extended quality function deployment-failure mode effect analysis (extended QFD-FMEA) simultaneously. Extended QFD-FMEA model presented herein provides an objective and quantitative analysis of risk reduction and mitigation based on the risk assessment and safety cost of construction methods. Risk factors are analyzed comprehensively to minimize safety uncertainties. The proposed decision-making process is based on a changing risk environment, where a tradeoff exists between technological options and safety issues. A case study is conducted to verify the proposed model. Results of risk assessment and possible risk reduction are presented using the extended QFD-FMEA, where two cases of feedback process in decision-making are presented for selecting the most appropriate construction method.
- Open Access
- 1 January 2018
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 17 (1) , 95-102
Group Decision-Making and a Design Communication Model Using Quality Function Deployment
Effective and efficient communication skills are crucial for successful projects in the construction industry. When project stakeholders′ decision-making defines all requirements without exception and reaches an agreement for approval, possible waste and potential risk factors may be reduced. Design decision-making is a group rather than an individual task; thus, the final design is drawn by sharing and exchanging information with which each individual project stakeholder is interactively involved. Group decision-making enables the use of professional advice; takes advantage of greater knowledge, facts, and alternatives; and derives design plans with a high level of execution and satisfaction through sufficient opinion exchange among the stakeholders. Thus, this study proposes a novel group decision-making method based on quality function deployment (QFD) together with a communication model to define users′ various requirements in a cooperative manner among stakeholders to secure reliability, understandab...
- 1 January 2018
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 17 (1) , 95-102
Open AccessGroup Decision-Making and a Design Communication Model Using Quality Function Deployment
Effective and efficient communication skills are crucial for successful projects in the construction industry. When project stakeholders′ decision-making defines all requirements without exception and reaches an agreement for approval, possible waste and potential risk factors may be reduced. Design decision-making is a group rather than an individual task; thus, the final design is drawn by sharing and exchanging information with which each individual project stakeholder is interactively involved. Group decision-making enables the use of professional advice; takes advantage of greater knowledge, facts, and alternatives; and derives design plans with a high level of execution and satisfaction through sufficient opinion exchange among the stakeholders. Thus, this study proposes a novel group decision-making method based on quality function deployment (QFD) together with a communication model to define users′ various requirements in a cooperative manner among stakeholders to secure reliability, understandab...
- Open Access
- 26 January 2017
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2017 (1)
Preference Evaluation System for Construction Products Using QFD‐TOPSIS Logic by Considering Trade‐Off Technical Characteristics
This paper investigates the feasibility of quality function deployment, technique for the order of preference by similarity to ideal solution (QFD‐TOPSIS) in presenting user preferences for multiple alternatives, such as construction technologies, products, systems, and design solutions, with trade‐off technical characteristics (TC). The original QFD as house of quality (HOQ) defines the requirements and features as subjective matrix relations, which cause interpretations to vary across users and limit its industrial applications. QFD‐TOPSIS is a new model that combines the benefits of QFD with those of TOPSIS, maintains the subjectivity and objectivity evaluation of the technical characteristics (TC), and rates the preferences by considering users’ individual propensity for requirements. In addition, QFD‐TOPSIS rates the preferences through the reciprocal compensation effects of trade‐off TC and filters unsuitable alternatives with predefined restrictive conditions. Trade‐off refers to conflicts and/or contradictions between attributes, often arising in multicriteria decision‐making. Users or project stakeholder groups define the priorities of trade‐off TC that directly influence product preferences and decision‐making. In the present study, we have developed a Web system based on the QFD‐TOPSIS logic and tested its operation to verify its industrial applicability and viability for automatic quality evaluation.
- 26 January 2017
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2017 (1)
Open AccessPreference Evaluation System for Construction Products Using QFD‐TOPSIS Logic by Considering Trade‐Off Technical Characteristics
This paper investigates the feasibility of quality function deployment, technique for the order of preference by similarity to ideal solution (QFD‐TOPSIS) in presenting user preferences for multiple alternatives, such as construction technologies, products, systems, and design solutions, with trade‐off technical characteristics (TC). The original QFD as house of quality (HOQ) defines the requirements and features as subjective matrix relations, which cause interpretations to vary across users and limit its industrial applications. QFD‐TOPSIS is a new model that combines the benefits of QFD with those of TOPSIS, maintains the subjectivity and objectivity evaluation of the technical characteristics (TC), and rates the preferences by considering users’ individual propensity for requirements. In addition, QFD‐TOPSIS rates the preferences through the reciprocal compensation effects of trade‐off TC and filters unsuitable alternatives with predefined restrictive conditions. Trade‐off refers to conflicts and/or contradictions between attributes, often arising in multicriteria decision‐making. Users or project stakeholder groups define the priorities of trade‐off TC that directly influence product preferences and decision‐making. In the present study, we have developed a Web system based on the QFD‐TOPSIS logic and tested its operation to verify its industrial applicability and viability for automatic quality evaluation.
- Open Access
- 1 January 2015
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 14 (1) , 89-96
Improvement of Productivity through the Control of Continuity and Variation of Work Flow in Building Space
- 1 January 2015
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 14 (1) , 89-96
Open AccessImprovement of Productivity through the Control of Continuity and Variation of Work Flow in Building Space