YYYasuhiro Yoshida

Yasuhiro Yoshida

*This is an algorithmically generated author record based on publicly available information.

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Yasuhiro Yoshida has a total of 14 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Modeless Start-Up Control for Operational Flexibility of Combined Cycle Power Plants

    by Yasuhiro Yoshida, Yuya Tokuda, Takuya Yoshida, Yuki Enomoto, Nobuhiro Osaki, Yoshito Nagahama, Yoshifumi Tsuge

    The flexible operations of gas turbine combined cycle power plants, especially with reduction of start-up time, are important. In this paper, the modeless start-up method without determination of the start-up curves corresponding to the start-up modes (e.g., hot start, warm start, and cold start) were developed. This method generates the start-up curves in which the start-up time is minimized against the initial steam turbine metal temperature by optimizing the start-up parameters. Based on the candidates of these start-up parameter values obtained during the optimization process, the look-up tables corresponding to the initial metal temperature for the parameters are estimated. The start-up time of the start-up curves generated by referring to the look-up tables continuously vary against the initial metal temperature without exceeding the thermal stress limit of the steam turbine rotor. The results obtained by the developed method show that modeless start-up curves for gas turbine combined cycle power plants can be generated. In addition, by visualizing the relationship of the start-up time and the initial metal temperature, the start-up curves can be interactively selected to facilitate planning of the plant start-up schedules.


  • Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant

    by Yasuhiro Yoshida, Takuya Yoshida, Yuki Enomoto, Nobuhiro Osaki, Yoshito Nagahama, Yoshifumi Tsuge

    Requirements for the start-up operations of gas turbine combined cycle (GTCC) power plants have become more diverse and now include such items as reduced start-up time, life consumption, and fuel gas consumption. In this paper, an optimization method is developed to solve these multi-objective problems. The method obtains optimized start-up curves by iterating the search for the optimal combination of the start-up parameter values and the evaluation of multiple objective functions. The start-up curves generated by this method were found to converge near the Pareto-front representing the best trade-off between the fuel gas consumption of the gas turbine (GT) and thermal stress in the steam turbine (ST) rotor which are defined as the objective functions. To demonstrate the effectiveness of the developed method, field tests were performed in a commercial power plant. As a result, the fuel gas consumption of HOT start-up was reduced by 22.8% compared with the past operation data. From this result, the developed method was shown to be capable of optimizing the start-up process for GTCC power plants.


  • Coordinated Control of Gas and Steam Turbines for Efficient Fast Start-Up of Combined Cycle Power Plants

    by Yasuhiro Yoshida, Kazunori Yamanaka, Atsushi Yamashita, Norihiro Iyanaga, Takuya Yoshida

    In the fast start-up for combined cycle power plants (CCPP), the thermal stresses of the steam turbine rotor are generally controlled by the steam temperatures or flow rates by using gas turbines (GTs), steam turbines, and desuperheaters to avoid exceeding the thermal stress limits. However, this thermal stress sensitivity to steam temperatures and flow rates depends on the start-up sequence due to the relatively large time constants of the heat transfer response in the plant components. In this paper, a coordinated control method of gas turbines and steam turbine is proposed for thermal stress control, which takes into account the large time constants of the heat transfer response. The start-up processes are simulated in order to assess the effect of the coordinated control method. The simulation results of the plant start-ups after several different cool-down times show that the thermal stresses are stably controlled without exceeding the limits. In addition, the steam turbine start-up times are reduced by 22–28% compared with those of the cases where only steam turbine control is applied.