GSGuanqun Shi

Guanqun Shi

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Guanqun Shi has a total of 4 co-authors. Here are the top co-authors by number of shared publications:

  • Jingru Tong

    School of Economics and Management, Wuhan University, Wuhan, China

    1 shared publication
  • Xueqing Zhang

    Associate Professor, Dept. of Civil and Environmental Engineering, Hong Kong Univ. of Science and Technology, Clear Water Bay, Kowloon, Hong Kong

    1 shared publication
  • Yichen Wang

    The College of Architecture and Urban Planning, Tongji University, Shanghai, China

    1 shared publication
  • Zhiyuan Chen

    School of Economics and Management, Wuhan University, Wuhan, China

    1 shared publication

Latest Publications

  • Open Access

    Optimal time-based and cost-based contracts in construction projects under asymmetric information

    by Guanqun Shi, Jingru Tong, Zhiyuan Chen Chen, Yichen Wang

    A project owner (principal) delegates a project to a contractor (agent). Because the contractor has construction experience, he has private information about the project’s expected completion time. Besides, the contractor can exert an unobservable effort to shorten the completion time. Under an asymmetric information setting, we provide the optimal time-based contract and the optimal cost-based contract, both of which consists of one payment scheme. Additionally, we consider a menu of time-based contracts that consists of a series of contracts. By comparing three contracts, we demonstrate that the owner has a preference for the menu of time-based contracts over the other two. The pooling time-based contract is superior to the pooling cost-based contract. We also find that the social welfare under the pooling time-based contract is lower than under the menu of time-based contracts if the daily operating cost is low but it may be higher than under the menu of time-based contracts if the daily operating cost is high. For the pooling cost-based contract, whether it is better than the previous two contracts depend greatly on the proportion of cost borne by the contractor and the daily operating cost.


  • Development of a Regulatory Mechanism for Key Stages in Public–Private Partnerships

    by Guanqun Shi, Xueqing Zhang

    In public–private partnership (PPP) projects, the government delegates the design, construction, and maintenance of an infrastructure system to the private sector. The concessionaire is responsible for the operation over a long duration before the ownership is transferred back to the government. A key factor affecting the success of PPP projects is that concessionaires often engage in opportunistic behavior to gain extra benefits at the expense of the public interest. Corresponding regulations to curb such opportunistic behavior are necessary by governments. In the PPP context, the regulations involve life-cycle activities covering all the stages. To overcome opportunistic behavior and establish regulations, the interaction between the government and the concessionaire in various stages of a PPP project is analyzed extensively in the current study based on the principal–agent theory. Overall, this study contributes a whole-life governance model to analyze the concessionaire’s behavior at every step, and the effect on the social welfare of a PPP project investigates the interaction effects between different PPP stages and helps the government to determine a suitable incentive mechanism to decrease the occurrence of opportunistic behavior. Subsequently, a decision support system is proposed for policy implementation based on the developed model.