YSYi Shen

Yi Shen

*This is an algorithmically generated author record based on publicly available information.

Yi Shen has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Dynamic Appointment Rescheduling of Trucks under Uncertainty of Arrival Time

    by Bowei Xu, Xiaoyan Liu, Junjun Li, Yongsheng Yang, Junfeng Wu, Yi Shen, Ye Zhou

    The uncertainty of the arrival time of trucks has increased the complexity of terminal operations. The truck appointment system (TAS) cannot respond to this problem in time, which can easily cause appointment invalidation and reduce the efficiency of truck operations and terminal operations. This paper comprehensively considers the related constraints of truck re-scheduling costs, gate waiting costs, and idle emission costs. With the goal of minimizing the comprehensive operating costs of truck companies and port companies, a dynamic appointment rescheduling model for external trucks based on mixed integer nonlinear programming is established. This paper designs an adaptive quantum revolving door update mechanism and proposes a double-chain real quantum genetic algorithm. The simulation experiment results show that compared with the traditional scheduling, the truck dynamic appointment rescheduling model can effectively reduce the comprehensive operating costs of the truck company and the port company and alleviate the congestion of the port. The probability that the truck cannot arrive at the port on time, the advance time for the truck to confirm the arrival time, and the length of time that the external truck cannot arrive at the port on time have a significant impact on the cost of the reschedule of the TAS. This paper favorably supports the manager’s operational decision-making.


  • Open Access

    A Flexible Scheduling for Twin Yard Cranes at Container Terminals Considering Dynamic Cut-Off Time

    by Junjun Li, Jingyu Yang, Bowei Xu, Wenjun Yin, Yongsheng Yang, Junfeng Wu, Ye Zhou, Yi Shen

    Yard handling is an important part of port logistics and affects the overall efficiency of the container port. The yard crane scheduling is affected by various external factors. For example, the dynamic cut-off time makes the release time of yard cranes variable, and the yard crane task arrangement will change frequently, resulting in a lot of computational time. To increase the flexibility of container yard handling, a twin yard cranes scheduling model is established considering the no-crossing constraints and the dynamic cut-off time. A joint scheduling of PSO and local re-scheduling strategy (LRPSO) is put forward to deal with the problem faster and more effectively. Small-scale and large-scale experiments are simulated to verify the performance of the proposed method. Results show that the scheduling method is more efficient.