Yi Shen
Yi Shen has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Bowei Xu
Institute of Logistics Science & Engineering, Shanghai Maritime University, Shanghai 201306, China
2 shared publications - Junfeng Wu
Office of General Manager, Shanghai WinJoin Information Technology Co., Ltd., Shanghai 200126, China
2 shared publications - Junjun Li
Merchant Marine College, Shanghai Maritime University, Shanghai 201306, China
2 shared publications - Ye Zhou
Project Department, Shanghai WinJoin Information Technology Co., Ltd., Shanghai 200126, China
2 shared publications - Yongsheng Yang
Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
2 shared publications - Jingyu Yang
Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
1 shared publication
Latest Publications
- Open Access
- 19 May 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (5) , 695
Dynamic Appointment Rescheduling of Trucks under Uncertainty of Arrival Time
The uncertainty of the arrival time of trucks has increased the complexity of terminal operations. The truck appointment system (TAS) cannot respond to this problem in time, which can easily cause appointment invalidation and reduce the efficiency of truck operations and terminal operations. This paper comprehensively considers the related constraints of truck re-scheduling costs, gate waiting costs, and idle emission costs. With the goal of minimizing the comprehensive operating costs of truck companies and port companies, a dynamic appointment rescheduling model for external trucks based on mixed integer nonlinear programming is established. This paper designs an adaptive quantum revolving door update mechanism and proposes a double-chain real quantum genetic algorithm. The simulation experiment results show that compared with the traditional scheduling, the truck dynamic appointment rescheduling model can effectively reduce the comprehensive operating costs of the truck company and the port company and alleviate the congestion of the port. The probability that the truck cannot arrive at the port on time, the advance time for the truck to confirm the arrival time, and the length of time that the external truck cannot arrive at the port on time have a significant impact on the cost of the reschedule of the TAS. This paper favorably supports the manager’s operational decision-making.
- 19 May 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (5) , 695
Open AccessDynamic Appointment Rescheduling of Trucks under Uncertainty of Arrival Time
The uncertainty of the arrival time of trucks has increased the complexity of terminal operations. The truck appointment system (TAS) cannot respond to this problem in time, which can easily cause appointment invalidation and reduce the efficiency of truck operations and terminal operations. This paper comprehensively considers the related constraints of truck re-scheduling costs, gate waiting costs, and idle emission costs. With the goal of minimizing the comprehensive operating costs of truck companies and port companies, a dynamic appointment rescheduling model for external trucks based on mixed integer nonlinear programming is established. This paper designs an adaptive quantum revolving door update mechanism and proposes a double-chain real quantum genetic algorithm. The simulation experiment results show that compared with the traditional scheduling, the truck dynamic appointment rescheduling model can effectively reduce the comprehensive operating costs of the truck company and the port company and alleviate the congestion of the port. The probability that the truck cannot arrive at the port on time, the advance time for the truck to confirm the arrival time, and the length of time that the external truck cannot arrive at the port on time have a significant impact on the cost of the reschedule of the TAS. This paper favorably supports the manager’s operational decision-making.
- Open Access
- 16 May 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (5) , 675
A Flexible Scheduling for Twin Yard Cranes at Container Terminals Considering Dynamic Cut-Off Time
Yard handling is an important part of port logistics and affects the overall efficiency of the container port. The yard crane scheduling is affected by various external factors. For example, the dynamic cut-off time makes the release time of yard cranes variable, and the yard crane task arrangement will change frequently, resulting in a lot of computational time. To increase the flexibility of container yard handling, a twin yard cranes scheduling model is established considering the no-crossing constraints and the dynamic cut-off time. A joint scheduling of PSO and local re-scheduling strategy (LRPSO) is put forward to deal with the problem faster and more effectively. Small-scale and large-scale experiments are simulated to verify the performance of the proposed method. Results show that the scheduling method is more efficient.
- 16 May 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (5) , 675
Open AccessA Flexible Scheduling for Twin Yard Cranes at Container Terminals Considering Dynamic Cut-Off Time
Yard handling is an important part of port logistics and affects the overall efficiency of the container port. The yard crane scheduling is affected by various external factors. For example, the dynamic cut-off time makes the release time of yard cranes variable, and the yard crane task arrangement will change frequently, resulting in a lot of computational time. To increase the flexibility of container yard handling, a twin yard cranes scheduling model is established considering the no-crossing constraints and the dynamic cut-off time. A joint scheduling of PSO and local re-scheduling strategy (LRPSO) is put forward to deal with the problem faster and more effectively. Small-scale and large-scale experiments are simulated to verify the performance of the proposed method. Results show that the scheduling method is more efficient.