KKKentaro Kido

Kentaro Kido

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Kentaro Kido has a total of 5 co-authors. Here are the top co-authors by number of shared publications:

  • Daisuke Nohara

    Kyoto University, Disaster Prevention Research Institute, 6110011 Kyoto, Japan

    1 shared publication
  • Hiroaki Tano

    Japan Water Agency, Shimokubo Dam Operation and Maintenance Office, 3670313 Saitama, Japan

    1 shared publication
  • Kazuhiro Kitani

    Japan Weather Association, Social and Disaster Management Department, 1706055 Tokyo, Japan

    1 shared publication
  • Tetsuya Sumi

    Disaster Prevention Research Institute (DPRI), Kyoto University, Kyoto, 611-0011, Japan

    1 shared publication
  • Yuri Michihiro

    Japan Weather Association, Kansai Regional Office, 5420081 Osaka, Japan

    1 shared publication

Latest Publications

  • Open Access

    Development of effective pre-release method for dams during super typhoons using long-term ensemble rainfall forecasts

    by Kentaro Kido, Hiroaki Tano, Tetsuya Sumi, Daisuke Nohara, Yuri Michihiro, Kazuhiro Kitani

    Against the background of increasing frequency of heavy rainfall due to climate change, an analytical approach to maximize the effective use of the reservoir from both flood control and water utilization was conducted. Simulations by applying statistical down-scaling method to the long-term ensemble rainfall forecast by ECMWF on a dam basin where a large inflow occurred during the Typhoon Hagibis in 2019 were shown. The results show that it is possible to use long-term ensemble rainfall forecasts to gain a temporal, stochastic understanding of total rainfall, required flood storage volumes, and recoverable reserves. Based on this understanding, a calculation method for setting release rates that correspond to effective pre-release start times and changes in rainfall forecasts in order to minimize both flood control and water service risks was proposed.