Danijel Zadravec
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Danijel Zadravec has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Nenad Ferdelji
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, 10000 Zagreb, Croatia
2 shared publications Damjan Bator
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, Zagreb, Croatia
1 shared publication- Dražen Lončar
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, Zagreb, Croatia
1 shared publication Helena Galić
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, Zagreb, Croatia
1 shared publication- Martina Odeljan
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, 10000 Zagreb, Croatia
1 shared publication Nenad Ferdelji
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, Zagreb, Croatia
1 shared publication
Latest Publications
- Open Access
Architecture-Dependent LNG Tank Pressure Management in Dual-Fuel Ships
Alternative liquefied natural gas (LNG) fuel gas supply system (FGSS) architectures allocate fuel delivery, tank-pressure management, and boil-off gas (BOG) management to different components, creating operating-mode-dependent functional relationships. This study develops a dynamic model of three representative low-pressure architectures based on pressure build-up, pumping, and pumping with compression, and compares them under LNG-only and dual-fuel operating profiles. The LNG tank submodel was validated against published experimental data, with a mean relative pressure deviation below 2.5%. The comparison considers pressure margin, BOG management, energy demand, configuration-specific implementation requirements, and sensitivity to key parameters. Under the dual-fuel profile, pressure margins were 0.50, 0.73, and 3.10 bar for FGSS 1–3, respectively. FGSS 3 required no excess BOG discharge in the base case but had approximately 10.5 times the specific mechanical-energy demand of FGSS 2. Fuel demand most strongly affected voyage endurance, whereas insulation performance strongly influenced tank pressure and BOG management. At the highest insulation thermal conductivity investigated, FGSS 3 reached the maximum allowable working pressure during conventional-fuel operation when compressor-assisted BOG removal was intentionally not used under the adopted strategy. The results show that performance depends on functional allocation, installed capabilities, operating strategy, evolving tank state, and available BOG management pathways, thereby supporting conceptual architecture screening.
Open AccessArchitecture-Dependent LNG Tank Pressure Management in Dual-Fuel Ships
Alternative liquefied natural gas (LNG) fuel gas supply system (FGSS) architectures allocate fuel delivery, tank-pressure management, and boil-off gas (BOG) management to different components, creating operating-mode-dependent functional relationships. This study develops a dynamic model of three representative low-pressure architectures based on pressure build-up, pumping, and pumping with compression, and compares them under LNG-only and dual-fuel operating profiles. The LNG tank submodel was validated against published experimental data, with a mean relative pressure deviation below 2.5%. The comparison considers pressure margin, BOG management, energy demand, configuration-specific implementation requirements, and sensitivity to key parameters. Under the dual-fuel profile, pressure margins were 0.50, 0.73, and 3.10 bar for FGSS 1–3, respectively. FGSS 3 required no excess BOG discharge in the base case but had approximately 10.5 times the specific mechanical-energy demand of FGSS 2. Fuel demand most strongly affected voyage endurance, whereas insulation performance strongly influenced tank pressure and BOG management. At the highest insulation thermal conductivity investigated, FGSS 3 reached the maximum allowable working pressure during conventional-fuel operation when compressor-assisted BOG removal was intentionally not used under the adopted strategy. The results show that performance depends on functional allocation, installed capabilities, operating strategy, evolving tank state, and available BOG management pathways, thereby supporting conceptual architecture screening.
- 18 August 2025
- Published by Elsevier in Computers & Chemical Engineering
- Vol. 203
Optimal control of uncertain batch processes via Koopman expectation-assisted gradient methods
- 18 August 2025
- Published by Elsevier in Computers & Chemical Engineering
- Vol. 203
Optimal control of uncertain batch processes via Koopman expectation-assisted gradient methods
- 14 April 2023
- Published by Taylor & Francis in Ships and Offshore Structures
- p. 1-14
The concept phase design of LNG tank and the fuel supply system on dual-fuel ships
To reduce pollution, LNG is increasingly used as a fuel in the maritime industry. This paper provides a methodology for the concept phase design of the LNG tank and fuel supply system on a ship. First, constraints of the ship, fuel tank and supply are determined. Next, the simultaneous design and optimisation of the fuel tank and supply system under defined constraints and realistic operating profiles is done. Tank design includes tank type, dimensions, insulation and design pressure analysis and structural strength assessment. Fuel supply system analysis is conducted using the developed dynamic model for comparing system configurations and equipment sizing. The methodology is demonstrated on two dual-fuel cruise ships of different sizes. The influence of ship operating conditions on the tank and fuel supply system and their interdependence is examined. Several candidates for the optimal tank design and fuel supply system are determined based on conflicting design objectives.
- 14 April 2023
- Published by Taylor & Francis in Ships and Offshore Structures
- p. 1-14
The concept phase design of LNG tank and the fuel supply system on dual-fuel ships
To reduce pollution, LNG is increasingly used as a fuel in the maritime industry. This paper provides a methodology for the concept phase design of the LNG tank and fuel supply system on a ship. First, constraints of the ship, fuel tank and supply are determined. Next, the simultaneous design and optimisation of the fuel tank and supply system under defined constraints and realistic operating profiles is done. Tank design includes tank type, dimensions, insulation and design pressure analysis and structural strength assessment. Fuel supply system analysis is conducted using the developed dynamic model for comparing system configurations and equipment sizing. The methodology is demonstrated on two dual-fuel cruise ships of different sizes. The influence of ship operating conditions on the tank and fuel supply system and their interdependence is examined. Several candidates for the optimal tank design and fuel supply system are determined based on conflicting design objectives.
- 30 May 2022
- Published by Springer Nature in Optimization and Engineering
- Vol. 23 (4) , 2111-2141
Towards a comprehensive approach to optimal control of non-ideal binary batch distillation
- 30 May 2022
- Published by Springer Nature in Optimization and Engineering
- Vol. 23 (4) , 2111-2141
Towards a comprehensive approach to optimal control of non-ideal binary batch distillation