Qian Cheng
Research Subjects
Qian Cheng has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
An Jin
Shanghai Interlink Road & Bridge Engineering Co., Ltd ., Shanghai
1 shared publicationBai Zhiping
Inner Mongolia Senior Highway Construction and Development Co., Ltd ., Huhhot
1 shared publication- Bin Zhang
CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Beijing 100088, China
1 shared publication - Dewei Liu
College of Civil Engineering, Fuzhou University, Fuzhou 350108, China
1 shared publication - Huanyong Chen
Management Center of Shenzhen-Zhongshan Bridge, Zhongshan 528400, China
1 shared publication Liu Tiancheng
CCCC Highway Bridges National Engineering Research Centre, Ltd ., Beijing
1 shared publication
Latest Publications
- Open Access
Study on Corrosion Fatigue Degradation Performance of Welded Top Plate-U Rib of Cross-Sea Steel Box Girder
With the development of the economy and transportation, more and more cross-sea bridges are appearing in people’s view. However, cross-sea bridges are not only subjected to repeated traffic loads but also to corrosion from the marine environment. In addition, the steel box girder deck plate is directly subjected to repeated vehicle loads, and its welded details are highly susceptible to fatigue damage and destruction, resulting in fatigue or corrosion damage to the welded top plate-U rib of the cross-sea steel box girder. This paper is based on fracture mechanics analysis methods and finite element simulation analysis, in order to establish the numerical analysis method of the welded top plate-U rib of the steel box girder deck plate fatigue, which is to take into account the coupling of the marine corrosive environment and fatigue cyclic loading, explore the welded top plate-U rib of the stress intensity factor, crack expansion, crack expansion life and total fatigue life of the welded details. Furthermore, the establishment of the welded top plate-U rib corrosion fatigue life assessment model is to explore the fatigue life of different top plate thicknesses. The results show that: the stress intensity factor along the crack front is symmetrically distributed, and with the increase in the crack expansion step, the corresponding stress intensity factor amplitude is also increasing; in addition, with the increase in the top plate thickness, fatigue crack expansion rate significantly reduced.
Open AccessStudy on Corrosion Fatigue Degradation Performance of Welded Top Plate-U Rib of Cross-Sea Steel Box Girder
With the development of the economy and transportation, more and more cross-sea bridges are appearing in people’s view. However, cross-sea bridges are not only subjected to repeated traffic loads but also to corrosion from the marine environment. In addition, the steel box girder deck plate is directly subjected to repeated vehicle loads, and its welded details are highly susceptible to fatigue damage and destruction, resulting in fatigue or corrosion damage to the welded top plate-U rib of the cross-sea steel box girder. This paper is based on fracture mechanics analysis methods and finite element simulation analysis, in order to establish the numerical analysis method of the welded top plate-U rib of the steel box girder deck plate fatigue, which is to take into account the coupling of the marine corrosive environment and fatigue cyclic loading, explore the welded top plate-U rib of the stress intensity factor, crack expansion, crack expansion life and total fatigue life of the welded details. Furthermore, the establishment of the welded top plate-U rib corrosion fatigue life assessment model is to explore the fatigue life of different top plate thicknesses. The results show that: the stress intensity factor along the crack front is symmetrically distributed, and with the increase in the crack expansion step, the corresponding stress intensity factor amplitude is also increasing; in addition, with the increase in the top plate thickness, fatigue crack expansion rate significantly reduced.
- 29 March 2023
- Published by Elsevier in Structures
- Vol. 51, 1497-1506
Multi-objective optimization-based reasonable finished state in long-span cable-stayed bridge considering counterweights
- 29 March 2023
- Published by Elsevier in Structures
- Vol. 51, 1497-1506
Multi-objective optimization-based reasonable finished state in long-span cable-stayed bridge considering counterweights
- Open Access
- 29 April 2022
- Published by Walter de Gruyter GmbH in Applied Mathematics and Nonlinear Sciences
- Vol. 8 (1) , 2231-2242
Mechanical behaviour of continuous girder bridge with corrugated steel webs constructed by RW
Rapid construction of ripple web (RW) is a new construction technology that can be applied to the prestressed concrete (PC) box girder bridge with corrugated steel webs (CSWs). In order to analyse the mechanical behaviour in the construction process when the RW method is applied, the main bridge of Zhao-Jun Yellow River Super Large Bridge was adapted as the engineering background, and a three-dimensional simulation finite element model was established. Thereafter, detailed mechanical analyses were carried out for CSWs, top concrete and bottom concrete, lining concrete, temporary support and other structures in the construction process when the RW method was used. The results reveal the excellent quality of the mechanical properties of the structure, thus indicating the structure’s safety and reliability. This study can provide a reference for similar research and have a positive impact on the further promotion of the RW method for application in the continuous girder bridge with CSWs.
- 29 April 2022
- Published by Walter de Gruyter GmbH in Applied Mathematics and Nonlinear Sciences
- Vol. 8 (1) , 2231-2242
Open AccessMechanical behaviour of continuous girder bridge with corrugated steel webs constructed by RW
Rapid construction of ripple web (RW) is a new construction technology that can be applied to the prestressed concrete (PC) box girder bridge with corrugated steel webs (CSWs). In order to analyse the mechanical behaviour in the construction process when the RW method is applied, the main bridge of Zhao-Jun Yellow River Super Large Bridge was adapted as the engineering background, and a three-dimensional simulation finite element model was established. Thereafter, detailed mechanical analyses were carried out for CSWs, top concrete and bottom concrete, lining concrete, temporary support and other structures in the construction process when the RW method was used. The results reveal the excellent quality of the mechanical properties of the structure, thus indicating the structure’s safety and reliability. This study can provide a reference for similar research and have a positive impact on the further promotion of the RW method for application in the continuous girder bridge with CSWs.