Qilin Ying
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Qilin Ying has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Xinyu Wu
Institute of Hydropower & Hydroinformatics, Dalian University of Technology, Dalian, China
3 shared publications - Chuntian Cheng
Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China
2 shared publications - Meng Zhao
Institute of Hydropower System & Hydroinformatics, Dalian University of Technology, Dalian 116024, China
1 shared publication - Xilong Cheng
Yunhe (Henan) Information Technology Co., Ltd., Zhengzhou 450008, China
1 shared publication - Yiyang Wu
Institute of Hydropower & Hydroinformatics, Dalian University of Technology, Dalian 116024, China
1 shared publication - Yuan Lei
Institute of Hydropower & Hydroinformatics, Dalian University of Technology, Dalian, China
1 shared publication
Latest Publications
- 6 March 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (4) , 1729-1745
An Optimal Operation Method for Parallel Hydropower Systems Combining Reservoir Level Control and Power Distribution
- 6 March 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (4) , 1729-1745
An Optimal Operation Method for Parallel Hydropower Systems Combining Reservoir Level Control and Power Distribution
- Open Access
- 17 August 2022
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2022, 1-11
Research on Dynamic Programming Game Model for Hydropower Stations
In the condition of the electricity market, the benefit is the result of market gaming for hydropower stations with price-making ability. The traditional energy maximization model is not appropriate in this circumstance. To study long-term operation variation in the market, a dynamic programming game model of hydropower stations is proposed to obtain a Nash equilibrium solution in long-term time series. A dynamic programming algorithm iteratively solves the model. The proposed approach is applied to hydropower stations of Longtan, Xiaowan, and Goupitan in a hypothetical pure hydropower market. The results show that the dynamic programming game model clearly outperforms the energy maximization model in terms of hydropower station benefit, and the operation results differences using the game model and optimization model are analyzed. For the studied cascaded reservoirs, the benefit increasing percentages can be 4.1%–8.2% with 0.2%–3.8% energy loss in this hypothetical electricity market, comparing the game model to the energy maximization model.
- 17 August 2022
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2022, 1-11
Open AccessResearch on Dynamic Programming Game Model for Hydropower Stations
In the condition of the electricity market, the benefit is the result of market gaming for hydropower stations with price-making ability. The traditional energy maximization model is not appropriate in this circumstance. To study long-term operation variation in the market, a dynamic programming game model of hydropower stations is proposed to obtain a Nash equilibrium solution in long-term time series. A dynamic programming algorithm iteratively solves the model. The proposed approach is applied to hydropower stations of Longtan, Xiaowan, and Goupitan in a hypothetical pure hydropower market. The results show that the dynamic programming game model clearly outperforms the energy maximization model in terms of hydropower station benefit, and the operation results differences using the game model and optimization model are analyzed. For the studied cascaded reservoirs, the benefit increasing percentages can be 4.1%–8.2% with 0.2%–3.8% energy loss in this hypothetical electricity market, comparing the game model to the energy maximization model.
- Open Access
Multi-Level Dependent-Chance Model for Hydropower Reservoir Operations
Some hydropower reservoirs are operated under different constraint levels. For these reservoirs, a multi-level (ML) dependent-chance (DC) model is established. In the model, only when the higher-level constraints are satisfied are the lower-level constraints or system benefits considered. The multi-level dependent-chance (MLDC) model is specified by two models. One is based on existing reliability-constrained (RC) dynamic programming (DP), in which the soft constraints are addressed using reliability constraints of 1, and the priorities are reflected using the order of magnitudes of Lagrange multipliers. The other is the explicit dependent-chance reasoning in the DP recursive function, in which each soft constraint is represented as an objective function of negative expected failure time and the optimum is the solution with a larger value for all higher-level objective functions. The proposed models are applied to derive long-term operation rules for the hydropower system on the middle-lower Lancang River. The results show the feasibility and performances of the explicit graded constraint control of the proposed model and the solution methods.
Open AccessMulti-Level Dependent-Chance Model for Hydropower Reservoir Operations
Some hydropower reservoirs are operated under different constraint levels. For these reservoirs, a multi-level (ML) dependent-chance (DC) model is established. In the model, only when the higher-level constraints are satisfied are the lower-level constraints or system benefits considered. The multi-level dependent-chance (MLDC) model is specified by two models. One is based on existing reliability-constrained (RC) dynamic programming (DP), in which the soft constraints are addressed using reliability constraints of 1, and the priorities are reflected using the order of magnitudes of Lagrange multipliers. The other is the explicit dependent-chance reasoning in the DP recursive function, in which each soft constraint is represented as an objective function of negative expected failure time and the optimum is the solution with a larger value for all higher-level objective functions. The proposed models are applied to derive long-term operation rules for the hydropower system on the middle-lower Lancang River. The results show the feasibility and performances of the explicit graded constraint control of the proposed model and the solution methods.