Guoxi Tang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Guoxi Tang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Bitao Wu
School of Civil Engineering & Architecture, East China Jiao Tong University, Nanchang 330013, China
2 shared publications - Meizhen Fu
School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang 330013, China
2 shared publications - Yuxiong Liang
State Key Laboratory of Safety and Resilience of Civil Engineering in Mountain Area, East China Jiaotong University, Nanchang 330013, China
2 shared publications - Ling Zhang
School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang 330013, China
1 shared publication - Qingsong Feng
East China Jiaotong University
1 shared publication
Latest Publications
- Open Access
Research on the Application of Multi-Source Data Analysis for Bridge Safety Monitoring in the Reconstruction and Demolition Process
With the increase of bridge-required demolition/dismantling for reconstruction or modification, the early warning of construction emergencies is greatly needed for monitoring the structural safety of bridges under construction. In this paper, based on the multi-source data of nearby construction and demolition construction of a large-span RC arch bridge in China, the Analytic Hierarchy Process (AHP) method is adopted to analyze the multi-source data and set the early warning threshold for bridge safety in construction. According to the analytical results, a reasonable evaluation of AHP factors can improve the accuracy and timeliness of safety early warning in the structural safety monitoring of bridges during the construction process. The weight of the monitoring data in AHP should be assigned according to its reliability, stability, and importance. Bridge safety assessment of nearby construction having harmful vibration should prioritize dynamic bridge monitoring by cooperating with multi-source data, including stress, and deformation monitoring of the bridge is necessary. The assessment results proved that multi-source data, including but not limited to structural stress and deformation monitoring data, vibration data, theoretical prediction data, environment data such as temperature data, and construction/maintenance history data, are necessary for safety monitoring and early warning of construction with specifications related to bridge construction. The early warnings triggered by the evaluation results successfully ensure the safety status of the bridge during nearby construction and demolition construction, which shows the proposed method can provide a guideline for comprehensively evaluating and early warning of the status of bridge construction.
Open AccessResearch on the Application of Multi-Source Data Analysis for Bridge Safety Monitoring in the Reconstruction and Demolition Process
With the increase of bridge-required demolition/dismantling for reconstruction or modification, the early warning of construction emergencies is greatly needed for monitoring the structural safety of bridges under construction. In this paper, based on the multi-source data of nearby construction and demolition construction of a large-span RC arch bridge in China, the Analytic Hierarchy Process (AHP) method is adopted to analyze the multi-source data and set the early warning threshold for bridge safety in construction. According to the analytical results, a reasonable evaluation of AHP factors can improve the accuracy and timeliness of safety early warning in the structural safety monitoring of bridges during the construction process. The weight of the monitoring data in AHP should be assigned according to its reliability, stability, and importance. Bridge safety assessment of nearby construction having harmful vibration should prioritize dynamic bridge monitoring by cooperating with multi-source data, including stress, and deformation monitoring of the bridge is necessary. The assessment results proved that multi-source data, including but not limited to structural stress and deformation monitoring data, vibration data, theoretical prediction data, environment data such as temperature data, and construction/maintenance history data, are necessary for safety monitoring and early warning of construction with specifications related to bridge construction. The early warnings triggered by the evaluation results successfully ensure the safety status of the bridge during nearby construction and demolition construction, which shows the proposed method can provide a guideline for comprehensively evaluating and early warning of the status of bridge construction.
- Open Access
- 7 July 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (14) , 6909
Research on Deformation Analysis and Rehabilitation for a Beam–Arch Combination Bridge Suffering an Extreme Temperature Field
In situ monitoring was conducted throughout the construction period to investigate the abnormal deformation of a bridge under construction subjected to sudden cooling by Typhoon Lekima. An FE model considering the temperature field based on measurement data was also established to reveal the exact causes of the bridge’s abnormal deformation and provide theoretical guidance for rehabilitation measures. The FE model simulation and measurement results showed that (1) the exact cause of the abnormal deformation of the bridge was the inconsistency of the temperature field between the top and bottom plates, and the sudden approach of the typhoon aggravated the inconsistency; (2) the abnormal deformation of the construction bridge caused by the typhoon could be addressed with rehabilitation before forming the bridge; (3) an extreme temperature field should be considered in the design of a beam–arch combination bridge. These results can provide a reference for the design and construction of similar bridges.
- 7 July 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (14) , 6909
Open AccessResearch on Deformation Analysis and Rehabilitation for a Beam–Arch Combination Bridge Suffering an Extreme Temperature Field
In situ monitoring was conducted throughout the construction period to investigate the abnormal deformation of a bridge under construction subjected to sudden cooling by Typhoon Lekima. An FE model considering the temperature field based on measurement data was also established to reveal the exact causes of the bridge’s abnormal deformation and provide theoretical guidance for rehabilitation measures. The FE model simulation and measurement results showed that (1) the exact cause of the abnormal deformation of the bridge was the inconsistency of the temperature field between the top and bottom plates, and the sudden approach of the typhoon aggravated the inconsistency; (2) the abnormal deformation of the construction bridge caused by the typhoon could be addressed with rehabilitation before forming the bridge; (3) an extreme temperature field should be considered in the design of a beam–arch combination bridge. These results can provide a reference for the design and construction of similar bridges.