Abdul Habib Zaray
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abdul Habib Zaray has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- Abdullah Ansari
Earthquake Monitoring Center, Sultan Qaboos University, Muscat, Oman
2 shared publications - Abdul Wahid Wahidi
Department of Civil Engineering, Engineering Faculty, Kandahar University, Kandahar 3801, Afghanistan
1 shared publication - Abid Hasan
School of Architecture and Built Environment, Deakin University
1 shared publication - Aditi Srivastava
ABES Business School, Ghaziabad, India
1 shared publication Ahmad Bilal Ahmadullah
Kandahar Univ
1 shared publicationAhmad Shah Amin
Kandahar Univ
1 shared publication
Latest Publications
- Open Access
- 6 May 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (9) , 4565
Structural Deficiencies, Governance Challenges, and Strategies for Sustainable Seismic Resilience in Hazard-Prone Regions
Afghanistan is located within one of the world’s most seismically active regions, where recurrent earthquakes pose a persistent threat to human life and the built environment. The 7 October 2023 Herat earthquake exposed critical vulnerabilities in both the construction sector and institutional frameworks, manifested through the widespread presence of non-engineered buildings, poor construction quality, and the absence of mandatory and enforceable seismic design regulations. This study examines the structural, construction-related, and governance deficiencies that significantly contributed to extensive building damage and high casualty rates, while also assessing shortcomings in public preparedness and disaster risk governance. A comparative case-study approach is adopted to evaluate seismic resilience and disaster management practices in India, Pakistan and Iran. The findings indicate that the elevated vulnerability observed in Herat primarily resulted from deficient construction practices, the lack of codified seismic standards, weak regulatory enforcement, and limited technical capacity within the construction industry. In contrast, regions characterized by well-established seismic codes, engineered structural systems, and coordinated institutional mechanisms experienced substantially reduced levels of structural damage and human losses, although earthquake impacts are also influenced by factors such as hazard characteristics, site conditions, exposure levels, and population distribution. The study highlights that seismic safety and sustainable development are inherently interdependent objectives. Improving earthquake resilience in Afghanistan requires the integration of earthquake-resistant engineering with sustainable construction practices, enhancement of technical and professional capacity, rigorous enforcement of region-specific seismic regulations, and strengthened community-based awareness programs. The adoption of internationally recognized best practices and risk-informed planning strategies is essential for fostering safer, more resilient, and environmentally sustainable urban development capable of withstanding future seismic events.
- 6 May 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (9) , 4565
Open AccessStructural Deficiencies, Governance Challenges, and Strategies for Sustainable Seismic Resilience in Hazard-Prone Regions
Afghanistan is located within one of the world’s most seismically active regions, where recurrent earthquakes pose a persistent threat to human life and the built environment. The 7 October 2023 Herat earthquake exposed critical vulnerabilities in both the construction sector and institutional frameworks, manifested through the widespread presence of non-engineered buildings, poor construction quality, and the absence of mandatory and enforceable seismic design regulations. This study examines the structural, construction-related, and governance deficiencies that significantly contributed to extensive building damage and high casualty rates, while also assessing shortcomings in public preparedness and disaster risk governance. A comparative case-study approach is adopted to evaluate seismic resilience and disaster management practices in India, Pakistan and Iran. The findings indicate that the elevated vulnerability observed in Herat primarily resulted from deficient construction practices, the lack of codified seismic standards, weak regulatory enforcement, and limited technical capacity within the construction industry. In contrast, regions characterized by well-established seismic codes, engineered structural systems, and coordinated institutional mechanisms experienced substantially reduced levels of structural damage and human losses, although earthquake impacts are also influenced by factors such as hazard characteristics, site conditions, exposure levels, and population distribution. The study highlights that seismic safety and sustainable development are inherently interdependent objectives. Improving earthquake resilience in Afghanistan requires the integration of earthquake-resistant engineering with sustainable construction practices, enhancement of technical and professional capacity, rigorous enforcement of region-specific seismic regulations, and strengthened community-based awareness programs. The adoption of internationally recognized best practices and risk-informed planning strategies is essential for fostering safer, more resilient, and environmentally sustainable urban development capable of withstanding future seismic events.
- 17 March 2026
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 27 (6) , 3123-3134
Improved Rao-3 algorithm using opposition learning for integrated project time–cost–quality–safety optimization
- 17 March 2026
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 27 (6) , 3123-3134
Improved Rao-3 algorithm using opposition learning for integrated project time–cost–quality–safety optimization
- 26 May 2023
- Published by Seismological Society of America (SSA) in Seismological Research Letters
- Vol. 94 (5) , 2154-2166
Fault Geometry, Slip Distribution, and Potential Triggering of the 2022 Mw 6.2 Deadly Afghanistan Earthquake Revealed from Geodetic and Weather Data
The 22 June 2022 6.2 Khōst, Afghanistan, earthquake struck killing more than 1700 people and devastating the region. For studying this earthquake, we computed the coseismic deformation fields of the earthquake using the Sentinel‐1 Terrain Observation with Progressive Scans Interferometric Synthetic Aperture Radar (InSAR). The InSAR results show that the maximum coseismic displacement in the satellite line of sight direction reaches up to 39 cm. We determined the geometric parameters of the fault and coseismic slip distribution from these InSAR measurements. The best‐fitted fault model shows that the rupture occurred on a right‐lateral strike‐slip fault with a strike of 203.7° and a dip of 68°. The most slip is concentrated at a shallow depth within the upper 10 km with the maximum slip of ∼3 m at 2.5 km depth. The maximum slip produced by this earthquake is significantly larger than the slip produced by several other similar earthquakes with similar magnitudes, implying that the focused shallow slip is likely the reason for the significant damage in the earthquake. The heavy rainfall was recorded during the earthquake period, which resulted in complicated fringes in coseismic interferograms close to the earthquake in time. Because a positive spatial and temporal correlation with the earthquake occurrence can be seen, the rainfall may have potential contributions to the earthquake, which deserves additional analysis in future. Combined with the potential effects of the 2015 7.5 Hindu Kush deep‐seated earthquake, the seismicity in Afghanistan is the result of the ongoing subduction of the Indian plate beneath the Eurasian plate along their west boundary.- 26 May 2023
- Published by Seismological Society of America (SSA) in Seismological Research Letters
- Vol. 94 (5) , 2154-2166
Fault Geometry, Slip Distribution, and Potential Triggering of the 2022 Mw 6.2 Deadly Afghanistan Earthquake Revealed from Geodetic and Weather Data
The 22 June 2022 6.2 Khōst, Afghanistan, earthquake struck killing more than 1700 people and devastating the region. For studying this earthquake, we computed the coseismic deformation fields of the earthquake using the Sentinel‐1 Terrain Observation with Progressive Scans Interferometric Synthetic Aperture Radar (InSAR). The InSAR results show that the maximum coseismic displacement in the satellite line of sight direction reaches up to 39 cm. We determined the geometric parameters of the fault and coseismic slip distribution from these InSAR measurements. The best‐fitted fault model shows that the rupture occurred on a right‐lateral strike‐slip fault with a strike of 203.7° and a dip of 68°. The most slip is concentrated at a shallow depth within the upper 10 km with the maximum slip of ∼3 m at 2.5 km depth. The maximum slip produced by this earthquake is significantly larger than the slip produced by several other similar earthquakes with similar magnitudes, implying that the focused shallow slip is likely the reason for the significant damage in the earthquake. The heavy rainfall was recorded during the earthquake period, which resulted in complicated fringes in coseismic interferograms close to the earthquake in time. Because a positive spatial and temporal correlation with the earthquake occurrence can be seen, the rainfall may have potential contributions to the earthquake, which deserves additional analysis in future. Combined with the potential effects of the 2015 7.5 Hindu Kush deep‐seated earthquake, the seismicity in Afghanistan is the result of the ongoing subduction of the Indian plate beneath the Eurasian plate along their west boundary.- 11 July 2022
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (10) , 4762-4781
Client and contractor perspectives on attributes affecting construction quality in a war-affected region
Purpose: The poor quality of construction work in war-affected regions is a significant issue. The large-scale destruction to the existing infrastructure from the war necessitates cost and time-efficient delivery of construction projects during and post-war to bring normalcy to affected lives and places. Consequently, there is always a tendency to finish construction projects in the shortest possible time on a limited budget without following the proper quality management processes. However, the poor quality of construction projects continues to affect the country's development, growth, credibility, reputation, and public safety for several years after the war. To this end, the present study was conducted to evaluate the significant attributes and factors contributing to the poor quality of construction projects in the war-affected Afghan construction sector.Design/methodology/approach: A total of 31 attributes influencing construction project quality were ranked based on 110 completed survey responses collected from Afghan construction professionals. Moreover, independent samples t-test, Spearman's rank correlation test, and exploratory factor analysis were conducted.Findings: The study found a moderate consensus between clients and contractors on attributes' rankings. In addition, the independent samples t-test showed statistically significant differences in means values of responses from clients and contractors for eight attributes. Based on factor analysis, 19 important attributes (median value greater than or equal to four) were classified into 4 latent factors – (1) poor-quality assurance and control, (2) unethical practices, (3) design and drawing errors, and (4) knowledge and skills gap.Originality/value: Evaluating the factors affecting the quality of construction projects will help clients, government departments, and construction practitioners improve the construction quality management practices. The findings will also inform the policies and procedures of international aid providers.
- 11 July 2022
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (10) , 4762-4781
Client and contractor perspectives on attributes affecting construction quality in a war-affected region
Purpose: The poor quality of construction work in war-affected regions is a significant issue. The large-scale destruction to the existing infrastructure from the war necessitates cost and time-efficient delivery of construction projects during and post-war to bring normalcy to affected lives and places. Consequently, there is always a tendency to finish construction projects in the shortest possible time on a limited budget without following the proper quality management processes. However, the poor quality of construction projects continues to affect the country's development, growth, credibility, reputation, and public safety for several years after the war. To this end, the present study was conducted to evaluate the significant attributes and factors contributing to the poor quality of construction projects in the war-affected Afghan construction sector.Design/methodology/approach: A total of 31 attributes influencing construction project quality were ranked based on 110 completed survey responses collected from Afghan construction professionals. Moreover, independent samples t-test, Spearman's rank correlation test, and exploratory factor analysis were conducted.Findings: The study found a moderate consensus between clients and contractors on attributes' rankings. In addition, the independent samples t-test showed statistically significant differences in means values of responses from clients and contractors for eight attributes. Based on factor analysis, 19 important attributes (median value greater than or equal to four) were classified into 4 latent factors – (1) poor-quality assurance and control, (2) unethical practices, (3) design and drawing errors, and (4) knowledge and skills gap.Originality/value: Evaluating the factors affecting the quality of construction projects will help clients, government departments, and construction practitioners improve the construction quality management practices. The findings will also inform the policies and procedures of international aid providers.