Latest Publications

  • Open Access

    Buckling Behavior of Loosely Fitted Formed-In-Place Pipe Liner in Circular Host Pipe under External Pressure

    by Zheng Zeng, Xuefeng Yan, Weigang Xiang, Yahong Zhao, Samuel T. Ariaratnam

    The formed-in-place pipe (FIPP) is a trenchless technology used for pipeline rehabilitation. It is a folded PVC pipe that expands through thermoforming to fit tightly inside the host pipe. However, the deficiencies during the construction of FIPP liners such as insufficient inflation, pipe misalignment and initial deformation will lead to elliptical deformation of the FIPP liner, which affects the load-bearing performance of the liner and makes it susceptible to buckling failure. In this paper, the buckling behavior of loosely fitted FIPP liners under uniform external pressure was investigated by the external pressure resistance test and finite element model. The pre- and post-buckling equilibrium paths verified the finite element model. The results indicated that the value of the dimension ratio will significantly reduce the critical buckling pressure. With the increasing value of liner major axis ratio to host pipe, the reduction effect on the critical buckling pressure caused by the increase in the ovality will diminish. Different values of liner major axis ratio to host pipe and ovality changed the range of the detached portion, which affected the critical buckling pressure. The parametric studies modified the design model from ASTM F1216, which was established to predict the critical buckling pressure of a loosely fitted FIPP liner and reduced the average difference rate from 23.43% to 5.52%.


  • Open Access

    An Experimental Study of the Mechanical Properties of Partially Rehabilitated Cable Tunnels

    by Zihao Zhu, Baosong Ma, Zheng Zeng, Chenkun Gong, Zhe Mei, Jinqiu Hu, Peng Zhang

    For buried municipal tunnels—such as cable tunnels and utility tunnels with structural defects—due to the sheltering of the internal pipelines, shelves, and other auxiliary facilities, traditional trenchless rehabilitating methods are not applicable since an intact ring is needed for spraying and lining. In these tunnels, only the exposed area at the crown of the ring can be partly rehabilitated. In this paper, three-edge bearing tests (TEBTs) for partially rehabilitated reinforced concrete (RC) pipe sections are carried out to simulate the case of a municipal tunnel and the effects of different repair materials (cement mortar and epoxy resin) and different dimensional parameters of the liner (lining thickness, lining range) on the partial rehabilitation effect of defective RC pipes are studied. The deforming compatibility of the liner–pipe interface is discussed, and the flexural rigidity of the partially rehabilitated section is calculated. The results show that the load-carrying capacities of partial rehabilitated RC pipes are effectively improved.