Shengxiong Zhou
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shengxiong Zhou has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Chuanqi Yan
Southwest Jiaotong Univ
2 shared publications - Pengfei Liang
Shandong Road and Bridge Group Co., Ltd., Jinan 250014, China
2 shared publications - Yanlei Wang
Shandong Road and Bridge Group Co., Ltd., Jinan 250014, China
2 shared publications - Chongchong Chai
Shandong Road and Bridge Group Co., Ltd., Jinan 250014, China
1 shared publication - Hongyu Yi
Civil Engineering School, Southwest Jiaotong University, Highway Engineering Key Laboratory of Sichuan Province, Chengdu 610031, China
1 shared publication - Hongyu Yi
China Railway Development Investment Group Co., Ltd., Kunming 650200, China
1 shared publication
Latest Publications
- Open Access
- 15 September 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (18) , 10335
Research on the Preparation Process of SBS-Modified Asphalt Using Early Shearing Instead of High-Speed Shearing of Modifier
To investigate the effect of pre-shredding as a replacement for high-speed shearing in the preparation process of SBS-modified asphalt, the particle size and mixing time of pre-shredded SBS modifier were studied. Laser confocal microscopy was used to observe the morphological changes and dispersion state of the SBS modifier during the mixing process, and process parameters were determined through rheological performance tests. FTIR tests were conducted on the original asphalt and PAV-aged modified asphalt to assess the impact of the pre-shredding process on the chemical composition and aging resistance of the modified asphalt. The specific conclusions were as follows. During the preparation process of the SBS modifier using low-speed mixing, the morphological changes of the SBS modifier can be summarized as follows: It cycles through edge networking, mesh fiberization, and filamentous granulation, and eventually presents a granular atomization form after multiple cycles. It is recommended that the mixing time be maintained between 30 and 60 min, which results in the microstructure of the modified asphalt consisting of filamentous and point-like combinations. This asphalt exhibited excellent performance in high-temperature rut resistance, fatigue resistance, and low-temperature crack resistance. When the mixing time was too long, the SBS modifier formed small granules in an atomized state, which weakened the strength of the mesh structure and led to a decrease in overall performance. It is recommended that the SBS be shredded into particles sized between 18 and 30 mesh or 30 and 100 mesh. SBS-modified asphalt with SBS particles sized between 18 and 30 mesh exhibited greater hardness in the mesh structure, resulting in better high-temperature rut resistance. SBS-modified asphalt with SBS particles sized between 30 and 100 mesh had better extensibility in the mesh structure, leading to superior performance in medium-temperature fatigue resistance and low-temperature crack resistance. Compared to the conventional process, the pre-shredding process for preparing SBS-modified asphalt improved aging resistance by 10% to 13%. Additionally, SBS-modified asphalt prepared using the pre-shredding process saved 1 to 3 h of processing time compared to the traditional preparation method, reducing energy consumption. Furthermore, the asphalt produced through the new process exhibited better performance, reducing road wear and saving maintenance costs.
- 15 September 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (18) , 10335
Open AccessResearch on the Preparation Process of SBS-Modified Asphalt Using Early Shearing Instead of High-Speed Shearing of Modifier
To investigate the effect of pre-shredding as a replacement for high-speed shearing in the preparation process of SBS-modified asphalt, the particle size and mixing time of pre-shredded SBS modifier were studied. Laser confocal microscopy was used to observe the morphological changes and dispersion state of the SBS modifier during the mixing process, and process parameters were determined through rheological performance tests. FTIR tests were conducted on the original asphalt and PAV-aged modified asphalt to assess the impact of the pre-shredding process on the chemical composition and aging resistance of the modified asphalt. The specific conclusions were as follows. During the preparation process of the SBS modifier using low-speed mixing, the morphological changes of the SBS modifier can be summarized as follows: It cycles through edge networking, mesh fiberization, and filamentous granulation, and eventually presents a granular atomization form after multiple cycles. It is recommended that the mixing time be maintained between 30 and 60 min, which results in the microstructure of the modified asphalt consisting of filamentous and point-like combinations. This asphalt exhibited excellent performance in high-temperature rut resistance, fatigue resistance, and low-temperature crack resistance. When the mixing time was too long, the SBS modifier formed small granules in an atomized state, which weakened the strength of the mesh structure and led to a decrease in overall performance. It is recommended that the SBS be shredded into particles sized between 18 and 30 mesh or 30 and 100 mesh. SBS-modified asphalt with SBS particles sized between 18 and 30 mesh exhibited greater hardness in the mesh structure, resulting in better high-temperature rut resistance. SBS-modified asphalt with SBS particles sized between 30 and 100 mesh had better extensibility in the mesh structure, leading to superior performance in medium-temperature fatigue resistance and low-temperature crack resistance. Compared to the conventional process, the pre-shredding process for preparing SBS-modified asphalt improved aging resistance by 10% to 13%. Additionally, SBS-modified asphalt prepared using the pre-shredding process saved 1 to 3 h of processing time compared to the traditional preparation method, reducing energy consumption. Furthermore, the asphalt produced through the new process exhibited better performance, reducing road wear and saving maintenance costs.
- Open Access
- 20 July 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (14) , 7304
Investigation on Preparation Method of SBS-Modified Asphalt Based on MSCR, LAS, and Fluorescence Microscopy
The preparation method of SBS-modified asphalt has a direct effect on its overall performance. Currently, the optimal process is usually determined by conventional performance properties, such as softening point, ductility, and penetration, which may deviate from practical field performance. This study aims to investigate the influence of different preparation methods on the performance and microstructure of SBS-modified asphalt based on fluorescence microscopy testing, the multiple stress creep recovery (MSCR) test, the linear amplitude sweep (LAS) test, as well as Burgers model fitting. SBS-modified asphalt was prepared with different shear rates, shear temperatures, shear times, development time, and sulfur addition. The results show that the optimal process for preparing SBS-modified asphalt is 2 h of shearing at 180 °C and 4000 r/min, followed by sulfurization and 6 h of development. The performance of SBS-modified asphalt is most notably influenced by sulfurization, which forms C–S bonds to make the polymer network stronger, thereby improving the high-temperature performance as well as the fatigue resistance. However, due to high-temperature sensitivity, C–S bonds may break during development, leading to weakened performance. The performance of SBS-modified asphalt without sulfur addition shows a monotonically increasing trend with the extension of development time.
- 20 July 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (14) , 7304
Open AccessInvestigation on Preparation Method of SBS-Modified Asphalt Based on MSCR, LAS, and Fluorescence Microscopy
The preparation method of SBS-modified asphalt has a direct effect on its overall performance. Currently, the optimal process is usually determined by conventional performance properties, such as softening point, ductility, and penetration, which may deviate from practical field performance. This study aims to investigate the influence of different preparation methods on the performance and microstructure of SBS-modified asphalt based on fluorescence microscopy testing, the multiple stress creep recovery (MSCR) test, the linear amplitude sweep (LAS) test, as well as Burgers model fitting. SBS-modified asphalt was prepared with different shear rates, shear temperatures, shear times, development time, and sulfur addition. The results show that the optimal process for preparing SBS-modified asphalt is 2 h of shearing at 180 °C and 4000 r/min, followed by sulfurization and 6 h of development. The performance of SBS-modified asphalt is most notably influenced by sulfurization, which forms C–S bonds to make the polymer network stronger, thereby improving the high-temperature performance as well as the fatigue resistance. However, due to high-temperature sensitivity, C–S bonds may break during development, leading to weakened performance. The performance of SBS-modified asphalt without sulfur addition shows a monotonically increasing trend with the extension of development time.