Karl Henning Halse
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Karl Henning Halse has a total of 38 co-authors. Here are the top co-authors by number of shared publications:
- Houxiang Zhang
Department of Ocean Operations and Civil Engineering, Norwegian University of Science and Technology, Larsgaardsvegen 2, 6009 Aalesund, Norway
7 shared publications - Sunghun Hong
Moreld Apply (Front End & Green Solutions, Stavanger, Norway)
7 shared publications - Hans Petter Hildre
Norwegian University of Science and Technology
5 shared publications - Behfar Ataei
CDynamics (Kristiansand, Norway)
4 shared publications - Jiafeng Xu
Centre for Research-based Innovation on Marine Operations (SFI MOVE), Department of Ocean Operations and Civil Engineering, Norwegian University of Science and Technology, NTNU, Aalesund NO-6009, Norway
4 shared publications Ting Liu
DNV (Risers and cables, Renewable energy, Oslo, Norway)
3 shared publications
Latest Publications
- Open Access
- 4 September 2026
- Published by Elsevier in Ocean Engineering
- Vol. 367
Regional operability and per-turbine installation time for bottom-fixed offshore wind: Side-mating catamaran versus conventional crane vessel across four markets
- 4 September 2026
- Published by Elsevier in Ocean Engineering
- Vol. 367
Open AccessRegional operability and per-turbine installation time for bottom-fixed offshore wind: Side-mating catamaran versus conventional crane vessel across four markets
- Open Access
- 15 July 2026
- Published by Elsevier in Ocean Engineering
- Vol. 364
Catamaran-based onsite installation of bottom-fixed offshore wind turbines: Response-based operability characterisation
- 15 July 2026
- Published by Elsevier in Ocean Engineering
- Vol. 364
Open AccessCatamaran-based onsite installation of bottom-fixed offshore wind turbines: Response-based operability characterisation
- Open Access
- 16 June 2026
- Published by Elsevier in Marine Structures
- Vol. 110
Persistence-based operability for time-constrained onsite installation of floating offshore wind turbines: Poisson interval framework
- 16 June 2026
- Published by Elsevier in Marine Structures
- Vol. 110
Open AccessPersistence-based operability for time-constrained onsite installation of floating offshore wind turbines: Poisson interval framework
- Open Access
- 3 June 2026
- Published by SAGE Publications in International Journal of Maritime History
- Vol. 38 (3) , 496-522
Drivers and barriers of technological innovation in the Norwegian bottom trawler fleet, 1960s–2025
The oceangoing bottom trawler is the largest vessel type in the Norwegian fishing fleet. It is important to the Norwegian economy but has a controversial position in the public debate. Fishers have always had to adapt to change, and innovation is generally seen as a way to do so. However, examining the design of the bottom trawler reveals that while there have been numerous incremental developments, the concept has not changed since its introduction to the Norwegian fishery in the 1960s. Supported by empirical evidence collected through 12 semi-structured interviews with senior representatives of firms in the trawling industry, this article presents the recent historical development of the design and factors influencing this development. An outlook on current challenges and opportunities is given, concluding that a completely new way of thinking is required to accommodate disruptive innovation on the bottom trawler.
- 3 June 2026
- Published by SAGE Publications in International Journal of Maritime History
- Vol. 38 (3) , 496-522
Open AccessDrivers and barriers of technological innovation in the Norwegian bottom trawler fleet, 1960s–2025
The oceangoing bottom trawler is the largest vessel type in the Norwegian fishing fleet. It is important to the Norwegian economy but has a controversial position in the public debate. Fishers have always had to adapt to change, and innovation is generally seen as a way to do so. However, examining the design of the bottom trawler reveals that while there have been numerous incremental developments, the concept has not changed since its introduction to the Norwegian fishery in the 1960s. Supported by empirical evidence collected through 12 semi-structured interviews with senior representatives of firms in the trawling industry, this article presents the recent historical development of the design and factors influencing this development. An outlook on current challenges and opportunities is given, concluding that a completely new way of thinking is required to accommodate disruptive innovation on the bottom trawler.
- Open Access
- 8 January 2025
- Published by Elsevier in Ocean Engineering
- Vol. 320
Full-scale experimental research on wave shielding effect of RV Gunnerus for offshore operations
- 8 January 2025
- Published by Elsevier in Ocean Engineering
- Vol. 320
Open AccessFull-scale experimental research on wave shielding effect of RV Gunnerus for offshore operations
- Open Access
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Design of Floating Installation Vessel for Offshore Installation of Floating Offshore Wind Turbines
The installation of the present wind farms Hywind Scotland and Hywind Tampen are both carried out by towing the fully assembled wind turbine from the assembly site in the Norwegian fjords to the final offshore site. In the present study an alternative installation method is proposed where the fully assembled tower is transported to the site on the installation vessel and mounted onto the preinstalled floating substructure (a spar buoy). The paper presents a brief outline of the design process for the proposed concept and gives an overview of the work done to evaluate variations of the installation vessel and the proposed lifting mechanism. The paper is a summary of the results obtained by a project team in SFI MOVE addressing marine operations related to installation of floating offshore wind turbines.
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Open AccessDesign of Floating Installation Vessel for Offshore Installation of Floating Offshore Wind Turbines
The installation of the present wind farms Hywind Scotland and Hywind Tampen are both carried out by towing the fully assembled wind turbine from the assembly site in the Norwegian fjords to the final offshore site. In the present study an alternative installation method is proposed where the fully assembled tower is transported to the site on the installation vessel and mounted onto the preinstalled floating substructure (a spar buoy). The paper presents a brief outline of the design process for the proposed concept and gives an overview of the work done to evaluate variations of the installation vessel and the proposed lifting mechanism. The paper is a summary of the results obtained by a project team in SFI MOVE addressing marine operations related to installation of floating offshore wind turbines.
- Top Cited PapersOpen Access
- 20 April 2024
- Published by Elsevier in Ocean Engineering
- Vol. 304
Floating offshore wind farm installation, challenges and opportunities: A comprehensive survey
- 20 April 2024
- Published by Elsevier in Ocean Engineering
- Vol. 304
Top Cited PapersOpen AccessFloating offshore wind farm installation, challenges and opportunities: A comprehensive survey
- 12 April 2023
- Published by ASME International in Journal of Offshore Mechanics and Arctic Engineering
- Vol. 145 (6) , 1-32
A Code-to-Code Comparison for Dynamic Modeling and Response Analysis of Offshore Wind Turbine Blade Mating Process
Offshore wind turbine blade installation using jack-up crane vessel is a challenging task. Wave- and wind-induced loads on the installation system can cause large relative motion between the blade root and the hub during the mating process. Currently, several numerical tools are used to analyze such critical global motion responses; however, the industry suffers from lack of experiments and full-scale measurements to validate the accuracy of these results. Consequently, a code-to-code comparison exercise becomes critical as it allows comparing different numerical tools for reliable prediction and verification of results. In the present article, a numerical model of the offshore wind turbine blade mating process using a jack-up crane vessel is developed in orcaflex, and a code-to-code comparison is performed against sima; both these tools are immensely used in the industry for modeling marine operations. Different comparisons are made between both the tools such as: (1) modal analyses of the jack-up vessel and the blade lifting gear, (2) time-domain analysis of the fully coupled installation vessel-crane-blade system, and (3) a comprehensive sensitivity study based on different seed numbers and simulation periods. The results of the study show a good agreement between both the tools with a deviation of less than 3% in terms of modal analysis and less than 5% variation in time-domain results. Further, the article provides modeling guidelines for the industry practitioners that heavily rely on both the tools for modeling marine operations.
- 12 April 2023
- Published by ASME International in Journal of Offshore Mechanics and Arctic Engineering
- Vol. 145 (6) , 1-32
A Code-to-Code Comparison for Dynamic Modeling and Response Analysis of Offshore Wind Turbine Blade Mating Process
Offshore wind turbine blade installation using jack-up crane vessel is a challenging task. Wave- and wind-induced loads on the installation system can cause large relative motion between the blade root and the hub during the mating process. Currently, several numerical tools are used to analyze such critical global motion responses; however, the industry suffers from lack of experiments and full-scale measurements to validate the accuracy of these results. Consequently, a code-to-code comparison exercise becomes critical as it allows comparing different numerical tools for reliable prediction and verification of results. In the present article, a numerical model of the offshore wind turbine blade mating process using a jack-up crane vessel is developed in orcaflex, and a code-to-code comparison is performed against sima; both these tools are immensely used in the industry for modeling marine operations. Different comparisons are made between both the tools such as: (1) modal analyses of the jack-up vessel and the blade lifting gear, (2) time-domain analysis of the fully coupled installation vessel-crane-blade system, and (3) a comprehensive sensitivity study based on different seed numbers and simulation periods. The results of the study show a good agreement between both the tools with a deviation of less than 3% in terms of modal analysis and less than 5% variation in time-domain results. Further, the article provides modeling guidelines for the industry practitioners that heavily rely on both the tools for modeling marine operations.