IZIderis Zakaria

Ideris Zakaria

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ideris Zakaria has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    The Effect of Risk Management Practices on Project Performance: A Case Study of the Libyan Construction Industry

    by Nasreddine Ali Algremazy, Zakaria Ideris, Muhammad Abdullah Alferjany, Alshammakh Akram

    Purpose: The general aim of the study was to investigate the implementation of risk management in the construction industry in Libya. Theoretical framework: The role of risk management in project management in the construction industry in Libya is described in this paper. The study involved more than three hundred construction companies located in Tripoli and Benghazi as these are two main cities in Libya where construction was most active and involved big projects and large investment. Design/methodology/approach: Questionnaires which were designed based on cluster sampling were sent to respondents i.e., basically the company managers and 250 replies were obtained. Structured equation modelling was used to analysis the information by Smart-PLS program. The risk management processes defined by identification, assessment and monitoring which contributed to the project success was also related to the financial risk. Findings: The study found that risk management practices had substantial and favourable effects on the success of the project's execution. Further the awareness of quality management in terms of risks was most encouraging. Research, Practical & Social implications: The current findings of this research have shown that most studies focus on the effect of risk management practices as strong tool to improve the project performance. A productivity survey might give a better overview of risk management at other sectors as it concerns the actual output of the construction companies. Originality/value: The systematic literature review approach was hardly found in study of risk management and project performance. At the same time, the exploratory method was applied to synthesize previous studies on risk management and project performance in construction companies.


  • Retracted
    Open Access

    Pavement Performance Evaluation of Asphalt Expressway Based on Machine Learning Support Vector Machine

    by Qiao Sun, Guan Wang, Yanpeng Sui, Ideris Zakaria

    Pavement quality evaluation is important for pavement maintenance and is the basis for maintenance and investment decisions. With the use of asphalt pavements on highways, road maintenance problems are becoming increasingly serious. This paper introduces the prediction and evaluation of asphalt pavement and analyzes the quality evaluation methods of asphalt pavement in terms of damage degree, pavement smoothness, pavement gauge, and pavement strength. Based on this, a pavement quality evaluation based on machine learning, SVM, and other techniques is established, and a comprehensive evaluation model based on SVM, a set of asphalt pavement performance teaching materials, and a training label determination method are proposed to highlight the importance of highway asphalt pavement quality prediction and evaluation and provide reference for Chinas highway construction.