Farah Naz
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Farah Naz has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Anna Fredriksson
Linköping University
3 shared publications - Linea Kjellsdotter Ivert
Traffic Analysis and Logistics, VTI, SE-402 78 Göteborg, Sweden
1 shared publication - Linea Kjellsdotter Ivert
The Swedish National Road & Transport Research Institute (VTI)
1 shared publication
Latest Publications
- Open Access
- 22 January 2025
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 43 (6) , 428-445
Creating logistics service value in construction – a quest of coordinating modules in a loosely coupled system
- 22 January 2025
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 43 (6) , 428-445
Open AccessCreating logistics service value in construction – a quest of coordinating modules in a loosely coupled system
- Open Access
- 6 September 2024
- Published by Linkoping University Electronic Press
Improving Transport Efficiency in the Construction Supply Chain
Construction is responsible for a large part of carbon dioxide (CO2) emissions worldwide (39%) and environmental concerns in construction are growing. Construction is transport intensive since the ...
- 6 September 2024
- Published by Linkoping University Electronic Press
Open AccessImproving Transport Efficiency in the Construction Supply Chain
Construction is responsible for a large part of carbon dioxide (CO2) emissions worldwide (39%) and environmental concerns in construction are growing. Construction is transport intensive since the ...
- 14 September 2023
- Published by Springer Nature
- p. 140-153
Clarifying the Interface Between Construction Supply Chain and Site - A Key to Improved Delivery Efficiency
- 14 September 2023
- Published by Springer Nature
- p. 140-153
Clarifying the Interface Between Construction Supply Chain and Site - A Key to Improved Delivery Efficiency
- Open Access
- 23 August 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (17) , 10491
The Potential of Improving Construction Transport Time Efficiency—A Freight Forwarder Perspective
Construction transport, in general, is not carried out efficiently, resulting in unnecessary costs and CO2 emissions. Although it has been found that there is a great potential to improve construction transport, little research has been conducted within this field. The purpose of this study is to contribute to the construction transport time efficiency by identifying non-value-adding activities and their causes from a freight forwarder perspective. A single case study was conducted and two flows, a goods delivery flow and a waste material flow, were mapped and analyzed with the help of value stream mapping (VSM). We ran two workshops to discuss the findings of the VSM. The results from this study show that there is large potential for improving construction transport time efficiency as over 40% of the time was used for non-value-adding activities. Although transport suffers from similar non-value-adding activities undertaken in other industries, this study identifies the transport activities with respect to construction transport. The findings further highlight areas of potential improvements, such as improved information sharing, planning, and coordination among all stakeholders. This knowledge can be used by the freight forwarder and the main contractor to improve construction transport time efficiency. The limitation of this study is that it is based on a single case of a freight forwarder. It does not provide a full picture of construction transport efficiency but rather a starting point for future studies.
- 23 August 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (17) , 10491
Open AccessThe Potential of Improving Construction Transport Time Efficiency—A Freight Forwarder Perspective
Construction transport, in general, is not carried out efficiently, resulting in unnecessary costs and CO2 emissions. Although it has been found that there is a great potential to improve construction transport, little research has been conducted within this field. The purpose of this study is to contribute to the construction transport time efficiency by identifying non-value-adding activities and their causes from a freight forwarder perspective. A single case study was conducted and two flows, a goods delivery flow and a waste material flow, were mapped and analyzed with the help of value stream mapping (VSM). We ran two workshops to discuss the findings of the VSM. The results from this study show that there is large potential for improving construction transport time efficiency as over 40% of the time was used for non-value-adding activities. Although transport suffers from similar non-value-adding activities undertaken in other industries, this study identifies the transport activities with respect to construction transport. The findings further highlight areas of potential improvements, such as improved information sharing, planning, and coordination among all stakeholders. This knowledge can be used by the freight forwarder and the main contractor to improve construction transport time efficiency. The limitation of this study is that it is based on a single case of a freight forwarder. It does not provide a full picture of construction transport efficiency but rather a starting point for future studies.