Willie Tan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Willie Tan has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
C. S. Phua
Department of Building, School of Design and Environment, National University of Singapore, Architecture Drive, Singapore 117566
1 shared publication- Calvin Yeung1 shared publication
- Himal Suranga
Department of Building Economics, Faculty of Architecture, University of Moratuwa, Sri Lanka
1 shared publication - Robert Lee Kong Tiong
School of Civil and Environmental Engineering, Nanyang Technological University, Singapore 639798, Singapore
1 shared publication
Latest Publications
- Open Access
- 26 October 2023
- Published by Qeios Ltd
Review of: "A Review of Transformation and Digital Literacy for the Sustainable Development in the Greater Mekong Subregion – Working Paper"
This paper is about transformation of industry from primary to secondary and more sustainable industries, and the need for users to be digitally ready to reap the full benefits of digitalization. This is an old problem of how the developing countries...
- 26 October 2023
- Published by Qeios Ltd
Open AccessReview of: "A Review of Transformation and Digital Literacy for the Sustainable Development in the Greater Mekong Subregion – Working Paper"
This paper is about transformation of industry from primary to secondary and more sustainable industries, and the need for users to be digitally ready to reap the full benefits of digitalization. This is an old problem of how the developing countries...
- Open Access
- 23 February 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (5) , 4042
Managing Sustainable Megaprojects along China’s New Silk Roads
This editorial is for the Special Issue on managing sustainable megaprojects along China’s new silk routes
- 23 February 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (5) , 4042
Open AccessManaging Sustainable Megaprojects along China’s New Silk Roads
This editorial is for the Special Issue on managing sustainable megaprojects along China’s new silk routes
- 30 August 2022
- Published by Elsevier in Journal of Air Transport Management
- Vol. 105
Forecasting airport pavement repair hours
- 30 August 2022
- Published by Elsevier in Journal of Air Transport Management
- Vol. 105
Forecasting airport pavement repair hours
- 8 January 2014
- Published by Springer Nature
- p. 69-84
Optimization of Engineering Survey Monitoring Networks
- 8 January 2014
- Published by Springer Nature
- p. 69-84
Optimization of Engineering Survey Monitoring Networks
- 1 October 2011
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 29 (10) , 1074-1075
Project Finance in Construction: A Structured Guide to Assessment
(2011). Project Finance in Construction: A Structured Guide to Assessment. Construction Management and Economics: Vol. 29, No. 10, pp. 1074-1075.
- 1 October 2011
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 29 (10) , 1074-1075
Project Finance in Construction: A Structured Guide to Assessment
(2011). Project Finance in Construction: A Structured Guide to Assessment. Construction Management and Economics: Vol. 29, No. 10, pp. 1074-1075.
- 1 January 2011
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 11 (3) , 67-78
Managing Lean Projects: Understanding the Structures of Lean Production
The purpose of this paper is to assess problems with lean production (LP) in the wake of recent worldwide recalls of millions of cars by automakers at the forefront of LP. The paper defines LP more broadly than the literature to include the structures of culture and political economy. It uses Toyota as a case study to identify the structural weaknesses of the entire lean production system beyond the shop floor. The main findings are, firstly, that the Toyota system is not well understood, and often misunderstood, with respect to its possible political-economic and social conditions of existence. This implies that the system cannot be easily replicated elsewhere. Secondly, changing structural conditions, particularly in the labor market and industrial system, have encouraged Toyota to introduce slower lines of production for older and female workers, use buffers to overcome more frequent production halts, and reduce the design cycle. Coupled with rising demand for its vehicles and the inevitable use of accelerated testing of complex systems, the recent spate of quality problems is not unexpected. These findings are of value to project managers who wish to obtain a deeper insight into the structural problems of LP and project management.
- 1 January 2011
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 11 (3) , 67-78
Managing Lean Projects: Understanding the Structures of Lean Production
The purpose of this paper is to assess problems with lean production (LP) in the wake of recent worldwide recalls of millions of cars by automakers at the forefront of LP. The paper defines LP more broadly than the literature to include the structures of culture and political economy. It uses Toyota as a case study to identify the structural weaknesses of the entire lean production system beyond the shop floor. The main findings are, firstly, that the Toyota system is not well understood, and often misunderstood, with respect to its possible political-economic and social conditions of existence. This implies that the system cannot be easily replicated elsewhere. Secondly, changing structural conditions, particularly in the labor market and industrial system, have encouraged Toyota to introduce slower lines of production for older and female workers, use buffers to overcome more frequent production halts, and reduce the design cycle. Coupled with rising demand for its vehicles and the inevitable use of accelerated testing of complex systems, the recent spate of quality problems is not unexpected. These findings are of value to project managers who wish to obtain a deeper insight into the structural problems of LP and project management.
- 1 June 2009
- Published by Taylor & Francis in Journal of Spatial Science
- Vol. 54 (1) , 37-43
The structure of leveling networks
This paper uses the singular value decomposition (SVD) to analyze the structure of leveling networks. Such decomposition may be used to determine possible linear dependencies in the design matrix and solve the linear rank‐deficient least squares problem. Simple examples are provided to illustrate the key ideas.
- 1 June 2009
- Published by Taylor & Francis in Journal of Spatial Science
- Vol. 54 (1) , 37-43
The structure of leveling networks
This paper uses the singular value decomposition (SVD) to analyze the structure of leveling networks. Such decomposition may be used to determine possible linear dependencies in the design matrix and solve the linear rank‐deficient least squares problem. Simple examples are provided to illustrate the key ideas.
- 1 January 2008
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 8 (1) , 29-35
The Winner’s Curse in the Sri Lankan Construction Industry
This paper presents a study on the size of winner’s curses in the Sri Lankan construction industry. The study is interesting because the existence of large winner’s curses is an indicator of information and other types of inefficiency. Large winner’s curses are detrimental to the development of the industry and for individual clients as well. The winning margin and the distribution of bid prices are used in detection of possible winner’s curses. Based on 389 bids in 64 private sector projects, the study finds evidence of the existence of large winner’s curses in the Sri Lankan construction industry.
- 1 January 2008
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 8 (1) , 29-35
The Winner’s Curse in the Sri Lankan Construction Industry
This paper presents a study on the size of winner’s curses in the Sri Lankan construction industry. The study is interesting because the existence of large winner’s curses is an indicator of information and other types of inefficiency. Large winner’s curses are detrimental to the development of the industry and for individual clients as well. The winning margin and the distribution of bid prices are used in detection of possible winner’s curses. Based on 389 bids in 64 private sector projects, the study finds evidence of the existence of large winner’s curses in the Sri Lankan construction industry.
- 1 June 2005
- Published by Taylor & Francis in Journal of Spatial Science
- Vol. 50 (1) , 91-94
Inner constraints for 3‐D survey networks
This paper provides a simple and accessible derivation of the inner constraints for 3‐D survey networks. There are three positional constraints, three rotational constraints, and one scale constraint. These constraints are often used in minimally constrained free net adjustments where error ellipses reflect the geometry of the network rather than the arbitrary imposition of constraints.
- 1 June 2005
- Published by Taylor & Francis in Journal of Spatial Science
- Vol. 50 (1) , 91-94
Inner constraints for 3‐D survey networks
This paper provides a simple and accessible derivation of the inner constraints for 3‐D survey networks. There are three positional constraints, three rotational constraints, and one scale constraint. These constraints are often used in minimally constrained free net adjustments where error ellipses reflect the geometry of the network rather than the arbitrary imposition of constraints.
- 1 January 2004
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 4 (1) , 87-96
Labour Mobility of Building Graduates in Singapore
This study investigates the mobility of building graduates from the Department of Building, National University of Singapore, and the factors influencing them to remain or leave the construction industry. Labour mobility refers to occupational mobility and job change. A survey was conducted on a sample of 197 graduates from 1972 to 1999 in November 2001 using questionnaires through telephone interview and email. Graduates from 2000 and 2001 were excluded because they have just entered the job market. Building graduates from overseas universities working in Singapore were also excluded due to the lack of data. Logistic regression was then used to identify the factors affecting graduates’ decision to stay or leave the construction industry. The results show that working hours, reputation of company, prospects of industry, family commitments, and personal interest are the main factors affecting their choices.
- 1 January 2004
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 4 (1) , 87-96
Labour Mobility of Building Graduates in Singapore
This study investigates the mobility of building graduates from the Department of Building, National University of Singapore, and the factors influencing them to remain or leave the construction industry. Labour mobility refers to occupational mobility and job change. A survey was conducted on a sample of 197 graduates from 1972 to 1999 in November 2001 using questionnaires through telephone interview and email. Graduates from 2000 and 2001 were excluded because they have just entered the job market. Building graduates from overseas universities working in Singapore were also excluded due to the lack of data. Logistic regression was then used to identify the factors affecting graduates’ decision to stay or leave the construction industry. The results show that working hours, reputation of company, prospects of industry, family commitments, and personal interest are the main factors affecting their choices.