Hailei Zhao
Research Subjects
Hailei Zhao has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Changbin Yan
School of Civil Engineering, Zhengzhou University, Zhengzhou, China
1 shared publication - Gaoliu Li
SGIDI Engineering Consulting (Group) Co., Ltd, Shanghai, China
1 shared publication - Jianjun Zhou
State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, China
1 shared publication - Jing Guo
School of Civil Engineering, Zhengzhou University, Zhengzhou, China
1 shared publication Kairong Hong
State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, China
1 shared publication- Liming Wang
State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, China
1 shared publication
Latest Publications
- Open Access
Improving Tunnel Boring Machine Tunneling Performance by Investigating the Particle Size Distribution of Rock Chips and Cutter Consumption
The construction environment of deep rock tunnels is complex, and effectively enhancing tunnel boring machine (TBM) tunneling efficiency is paramount. Increasing rock-breaking efficiency and minimizing cutter consumption are essential strategies for improving TBM tunneling efficiency. Selecting suitable tunneling parameters is crucial for enhancing rock-breaking efficiency and reducing cutter consumption. Existing research on the optimization of the ratio of maximum cutter spacing to penetration (Smax/P) based on field-measured data is limited, and few studies compare and analyze the relationship between SE, CI, and the Smax/P ratio separately. Consequently, this study determined optimal tunneling parameters for various types of surrounding rock and construction environments, aiming to more accurately optimize TBM tunneling performance during construction processes based on on-site construction data. This study conducted a comparative analysis of specific energy (SE) and the coarseness index (CI). Under both working conditions, the quadratic fitting coefficients of the CI are 4.2% and 10.6% higher than those of the SE, respectively, with the CI selected to represent the particle size distribution of rock chips. Finally, taking into account both the correlations between the CI and the ratio of maximum cutter spacing to penetration (Smax/P), as well as cutter consumption and the Smax/P ratio, an optimization method for the TBM tunneling parameter was established under both dry and saturated conditions. The research findings indicate that cutter consumption exhibits an exponential increase with a higher rock Cerchar Abrasivity Index (CAI); it initially decreases as the Smax/P ratio increases and subsequently increases in both dry and saturated conditions. Instead, the CI demonstrates an initial increase and subsequent decrease as the Smax/P ratio increases. Maximizing rock-breaking efficiency and minimizing cutter consumption are crucial for improving tunneling performance. In saturated conditions, the corresponding optimal Smax/P ratio ranges are 7.055–8.319 for soft rock, 8.606–8.931 for medium–hard rock, and 13.50–14.00 for hard rock, and these optimal ranges under dry conditions are 8.495–9.457, 10.972–12.169, and 16.5–17.5 for the same rock types. This study provides optimal Smax/P ratio ranges for TBM tunneling, thereby significantly enhancing tunneling efficiency.
Open AccessImproving Tunnel Boring Machine Tunneling Performance by Investigating the Particle Size Distribution of Rock Chips and Cutter Consumption
The construction environment of deep rock tunnels is complex, and effectively enhancing tunnel boring machine (TBM) tunneling efficiency is paramount. Increasing rock-breaking efficiency and minimizing cutter consumption are essential strategies for improving TBM tunneling efficiency. Selecting suitable tunneling parameters is crucial for enhancing rock-breaking efficiency and reducing cutter consumption. Existing research on the optimization of the ratio of maximum cutter spacing to penetration (Smax/P) based on field-measured data is limited, and few studies compare and analyze the relationship between SE, CI, and the Smax/P ratio separately. Consequently, this study determined optimal tunneling parameters for various types of surrounding rock and construction environments, aiming to more accurately optimize TBM tunneling performance during construction processes based on on-site construction data. This study conducted a comparative analysis of specific energy (SE) and the coarseness index (CI). Under both working conditions, the quadratic fitting coefficients of the CI are 4.2% and 10.6% higher than those of the SE, respectively, with the CI selected to represent the particle size distribution of rock chips. Finally, taking into account both the correlations between the CI and the ratio of maximum cutter spacing to penetration (Smax/P), as well as cutter consumption and the Smax/P ratio, an optimization method for the TBM tunneling parameter was established under both dry and saturated conditions. The research findings indicate that cutter consumption exhibits an exponential increase with a higher rock Cerchar Abrasivity Index (CAI); it initially decreases as the Smax/P ratio increases and subsequently increases in both dry and saturated conditions. Instead, the CI demonstrates an initial increase and subsequent decrease as the Smax/P ratio increases. Maximizing rock-breaking efficiency and minimizing cutter consumption are crucial for improving tunneling performance. In saturated conditions, the corresponding optimal Smax/P ratio ranges are 7.055–8.319 for soft rock, 8.606–8.931 for medium–hard rock, and 13.50–14.00 for hard rock, and these optimal ranges under dry conditions are 8.495–9.457, 10.972–12.169, and 16.5–17.5 for the same rock types. This study provides optimal Smax/P ratio ranges for TBM tunneling, thereby significantly enhancing tunneling efficiency.
- Open Access
- 26 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (13) , 7550
Key Technology of TBM Excavation in Soft and Broken Surrounding Rock
Tunnel Boring Machine (TBM), as the most advanced construction equipment for rock tunnels, has been widely used in railway tunnel engineering, water conservancy tunnel engineering, urban rail engineering, coal mine roadway engineering, and other fields. However, the disadvantage of TBM lies in its poor adaptability to complex geological conditions, resulting in a significant reduction in tunneling efficiency and even major accidents due to improper TBM construction measures, especially in weak and fractured strata, which pose a great challenge to TBM construction. Therefore, it is necessary to study the key technologies of TBM construction in weak and fractured strata in order to improve the efficiency of TBM construction. Based on the background of the TBM construction of the Gaoligongshan Tunnel on the Southwest Darui Railway, this paper provides a reference for safe and efficient TBM excavation in weak and fractured areas through research on equipment, excavation parameter control, and construction measures.
- 26 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (13) , 7550
Open AccessKey Technology of TBM Excavation in Soft and Broken Surrounding Rock
Tunnel Boring Machine (TBM), as the most advanced construction equipment for rock tunnels, has been widely used in railway tunnel engineering, water conservancy tunnel engineering, urban rail engineering, coal mine roadway engineering, and other fields. However, the disadvantage of TBM lies in its poor adaptability to complex geological conditions, resulting in a significant reduction in tunneling efficiency and even major accidents due to improper TBM construction measures, especially in weak and fractured strata, which pose a great challenge to TBM construction. Therefore, it is necessary to study the key technologies of TBM construction in weak and fractured strata in order to improve the efficiency of TBM construction. Based on the background of the TBM construction of the Gaoligongshan Tunnel on the Southwest Darui Railway, this paper provides a reference for safe and efficient TBM excavation in weak and fractured areas through research on equipment, excavation parameter control, and construction measures.
- Open Access
Model Test of TBM Tunnel Crossing Large Dip Angle Fault Zone under High In Situ Stress
In order to study the effect of fracture zone on tunnel stability under high ground stress and to reveal the disaster mechanism of fracture zone surrounding rock compressor, the TBM tunnel of Fragrant Furnace Mountain Tunnel in the F12 fracture zone in Dali I section of central Yunnan was experimentally studied. The results show that the TBM cutter head has a significant effect on the surrounding rock pressure in the range of 0.43 D~0.5 D (hole diameter), with a maximum increase of 1.19-fold. As the measurement point approaches the tunnel contour, the displacement of surrounding rock increases. As TBM traverses the fracture zone interface, the displacement of surrounding rock increases at the maximum rate. The effect of TBM shear rock formation failure on the internal displacement of rock formation is 1.21 D in the front and not more than 1.5 D in the top. Sliding and loosening of the fault zone looser above the interface can easily lead to blockage of the fault zone, and the pressure of the surrounding rocks at front edge does not affect more than 1.73 H (the length of horizontal projection of the fault zone interface). Therefore, in the course of construction, the interface of fracture zone should be promoted to reduce the construction risks.
Open AccessModel Test of TBM Tunnel Crossing Large Dip Angle Fault Zone under High In Situ Stress
In order to study the effect of fracture zone on tunnel stability under high ground stress and to reveal the disaster mechanism of fracture zone surrounding rock compressor, the TBM tunnel of Fragrant Furnace Mountain Tunnel in the F12 fracture zone in Dali I section of central Yunnan was experimentally studied. The results show that the TBM cutter head has a significant effect on the surrounding rock pressure in the range of 0.43 D~0.5 D (hole diameter), with a maximum increase of 1.19-fold. As the measurement point approaches the tunnel contour, the displacement of surrounding rock increases. As TBM traverses the fracture zone interface, the displacement of surrounding rock increases at the maximum rate. The effect of TBM shear rock formation failure on the internal displacement of rock formation is 1.21 D in the front and not more than 1.5 D in the top. Sliding and loosening of the fault zone looser above the interface can easily lead to blockage of the fault zone, and the pressure of the surrounding rocks at front edge does not affect more than 1.73 H (the length of horizontal projection of the fault zone interface). Therefore, in the course of construction, the interface of fracture zone should be promoted to reduce the construction risks.