Yi Guo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yi Guo has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Xiaoling Yuan
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
2 shared publications - Can Cui
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
1 shared publication - Chenghao Li
Electric Power Research Institute of State Grid Henan Electric Power Company, Zhengzhou 450052, China
1 shared publication - Hanqing Ma
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
1 shared publication - Hao Cao
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
1 shared publication - Hua Wang
State Grid Henan Electric Power Research Institute, Zhengzhou 450052, China
1 shared publication
Latest Publications
- Open Access
Time-of-Use Pricing Strategy of Integrated Energy System Based on Game Theory
The integrated energy system is the mainstream energy utilization form of integrating a power system, natural gas system and thermal system, which provides a new way to solve the problem of renewable energy accommodation. The integrated energy system includes a variety of energy generation and conversion equipment, and its internal electricity, gas, cooling and thermal systems must balance the multiple energy supplies required by users. The integrated energy supplier (IES) and integrated energy user (IEU), as different stakeholders, pursue the maximization of their own profit. However, integrated energy suppliers should consider their market share and the sustainability of participating in market competition. Based on the constraints of energy access, conversion and accommodation, and the equipment for energy generation, conversion and consumption, we established an energy flow model. Constrained by the dynamic equilibrium of the supply of integrated energy suppliers and the demand of integrated energy users, a Stackelberg game model of integrated energy suppliers and users was established, and the existence of a Nash equilibrium solution of the game was proved. A genetic algorithm was used to solve the Nash equilibrium solution under two conditions aiming at the integrated energy supplier’s maximum profit and target profit. Considering the demand of integrated energy users in different time periods, we analyzed the time-of-use pricing strategy of the integrated energy based on the balance of the energy supply and demand. The results of a case study show that if integrated energy suppliers adopt the time-of-use pricing strategy of maximum profit, the energy load distribution of integrated energy users can be smoothed, and energy utilization and economic benefits of the system can be improved. If integrated energy suppliers adopt the time-of-use pricing strategy of target profit, enlarge the market by limiting their own profit and obtain the purchase willingness of integrated energy users by reducing the energy price, they can have a larger market share, a more reliable profit and a guarantee of long-term participation in market transactions.
Open AccessTime-of-Use Pricing Strategy of Integrated Energy System Based on Game Theory
The integrated energy system is the mainstream energy utilization form of integrating a power system, natural gas system and thermal system, which provides a new way to solve the problem of renewable energy accommodation. The integrated energy system includes a variety of energy generation and conversion equipment, and its internal electricity, gas, cooling and thermal systems must balance the multiple energy supplies required by users. The integrated energy supplier (IES) and integrated energy user (IEU), as different stakeholders, pursue the maximization of their own profit. However, integrated energy suppliers should consider their market share and the sustainability of participating in market competition. Based on the constraints of energy access, conversion and accommodation, and the equipment for energy generation, conversion and consumption, we established an energy flow model. Constrained by the dynamic equilibrium of the supply of integrated energy suppliers and the demand of integrated energy users, a Stackelberg game model of integrated energy suppliers and users was established, and the existence of a Nash equilibrium solution of the game was proved. A genetic algorithm was used to solve the Nash equilibrium solution under two conditions aiming at the integrated energy supplier’s maximum profit and target profit. Considering the demand of integrated energy users in different time periods, we analyzed the time-of-use pricing strategy of the integrated energy based on the balance of the energy supply and demand. The results of a case study show that if integrated energy suppliers adopt the time-of-use pricing strategy of maximum profit, the energy load distribution of integrated energy users can be smoothed, and energy utilization and economic benefits of the system can be improved. If integrated energy suppliers adopt the time-of-use pricing strategy of target profit, enlarge the market by limiting their own profit and obtain the purchase willingness of integrated energy users by reducing the energy price, they can have a larger market share, a more reliable profit and a guarantee of long-term participation in market transactions.
- Open Access
Cost Analysis of Synchronous Condenser Transformed from Thermal Unit Based on LCC Theory
With the development of large-scale renewable energy consumption and multi-infeed high voltage direct current (HVDC) systems, the demand of a system for the synchronous condensers with a strong dynamic reactive power support capacity and a strong short-time overload capacity is increasing. Meanwhile, with the reuse of a large number of retired thermal units, the most practical and economic way is to transform thermal units into synchronous condensers. The cost difference in the life-cycle of the synchronous condenser transformed from a thermal unit (SCTTU) and the newly established synchronous condenser (NESC) is a key factor that affects the decision-making and construction of the transformation from thermal unit to synchronous condenser. However, the life-cycle cost (LCC) of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser contains many uncertain factors, which affect the accuracy of the LCC estimation value. In order to quantify the impact of the blind information on the cost of the synchronous condenser station, blind number theory is introduced to establish the blind number model of the LCC of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser. Additionally, the LCC of the NESC and SCTTU with a different life-cycle under the capacity of 2 × 300 MVar are estimated. The results show that the cost of the SCTTU with a long service life of more than 15 years is significantly lower than that of the NESC and, thus, the SCTTU has better economic performance. The economic performance of the SCTTU with a life-cycle of less than 15 years is not better than that of the NESC. Compared with the traditional calculation method of a single cost value, the blind number model can obtain the possible distribution interval of LCC and the reliability of the corresponding interval, which makes the estimation results more valuable for practical engineering reference.
Open AccessCost Analysis of Synchronous Condenser Transformed from Thermal Unit Based on LCC Theory
With the development of large-scale renewable energy consumption and multi-infeed high voltage direct current (HVDC) systems, the demand of a system for the synchronous condensers with a strong dynamic reactive power support capacity and a strong short-time overload capacity is increasing. Meanwhile, with the reuse of a large number of retired thermal units, the most practical and economic way is to transform thermal units into synchronous condensers. The cost difference in the life-cycle of the synchronous condenser transformed from a thermal unit (SCTTU) and the newly established synchronous condenser (NESC) is a key factor that affects the decision-making and construction of the transformation from thermal unit to synchronous condenser. However, the life-cycle cost (LCC) of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser contains many uncertain factors, which affect the accuracy of the LCC estimation value. In order to quantify the impact of the blind information on the cost of the synchronous condenser station, blind number theory is introduced to establish the blind number model of the LCC of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser. Additionally, the LCC of the NESC and SCTTU with a different life-cycle under the capacity of 2 × 300 MVar are estimated. The results show that the cost of the SCTTU with a long service life of more than 15 years is significantly lower than that of the NESC and, thus, the SCTTU has better economic performance. The economic performance of the SCTTU with a life-cycle of less than 15 years is not better than that of the NESC. Compared with the traditional calculation method of a single cost value, the blind number model can obtain the possible distribution interval of LCC and the reliability of the corresponding interval, which makes the estimation results more valuable for practical engineering reference.