Min Gong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Min Gong has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Xiaodong Wu
Research Institute of Macro-Safety Science, University of Science and Technology Beijing, Beijing 100083, China
6 shared publications - Haojun Wu
School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
3 shared publications - Sijie Wang
School of Resources and Safety Engineering, University of Science and Technology Beijing, Beijing 100083, China
2 shared publications - Chunping Wu
School of Resources and Safety Engineering, University of Science and Technology Beijing, Beijing 100083, China
1 shared publication - Haojun Wu
School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
1 shared publication - Haojun Wu
School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
1 shared publication
Latest Publications
- Open Access
Deformation Process of Shallow-Buried Tunnel Surrounding Rocks Subjected to Blasting via In Situ 3D-DIC Measurements
This study devised a blasting experiment to establish a dynamic quantified relationship between blasting and movement, failure, and ejection of rock masses. The experiment was conducted using the 3D digital image correlation method (3D-DIC), which provided high-speed images capturing the process of shallow-buried tunnel blasting. The study analyzed the mechanical behavior of full-section rock mass under blasting action through cross-scale image processing. Yield and elastic points were distinguished based on the time–displacement curve. Then, the spatial vector method was employed to deduce flying rock trajectory and throwing distance, enabling the subdivision of underground space based on risk assessment. The results show that the rock in the cut zone starts moving within 3 ms after initiation, ultimately exhibiting a maximum visible off-plane displacement of 215 mm. Displacements are related to delay time and distance. Different zones show distinct dominant directions of rock mass displacement. The rock mass becomes flying rocks separated from the cross-section. The initial velocity of the flying rocks ranges from 11.8 m·s−1 to 29.9 m·s−1. Around 85% of the flying rocks fall within the range of 0 to 40.8 m. Only 5% of the flying rocks fall outside 64.3 m. Appropriate protective measures should be taken for equipment during experiments.
Open AccessDeformation Process of Shallow-Buried Tunnel Surrounding Rocks Subjected to Blasting via In Situ 3D-DIC Measurements
This study devised a blasting experiment to establish a dynamic quantified relationship between blasting and movement, failure, and ejection of rock masses. The experiment was conducted using the 3D digital image correlation method (3D-DIC), which provided high-speed images capturing the process of shallow-buried tunnel blasting. The study analyzed the mechanical behavior of full-section rock mass under blasting action through cross-scale image processing. Yield and elastic points were distinguished based on the time–displacement curve. Then, the spatial vector method was employed to deduce flying rock trajectory and throwing distance, enabling the subdivision of underground space based on risk assessment. The results show that the rock in the cut zone starts moving within 3 ms after initiation, ultimately exhibiting a maximum visible off-plane displacement of 215 mm. Displacements are related to delay time and distance. Different zones show distinct dominant directions of rock mass displacement. The rock mass becomes flying rocks separated from the cross-section. The initial velocity of the flying rocks ranges from 11.8 m·s−1 to 29.9 m·s−1. Around 85% of the flying rocks fall within the range of 0 to 40.8 m. Only 5% of the flying rocks fall outside 64.3 m. Appropriate protective measures should be taken for equipment during experiments.
- Open Access
- 7 July 2026
- Published by MDPI AG in Geosciences
- Vol. 16 (7) , 279
Quantitative Prediction of Blast-Induced Crack Length Around a Blasthole in Deep Rock Masses Under In Situ Stress
Deep rock blasting under high in situ stress is challenged by the suppression of stress wave propagation and the strong directional dependence of crack growth, which together make fragmentation control notoriously difficult. Existing studies remain largely qualitative and lack predictive mathematical relationships linking crack length to the in situ stress state. In this study, we combine theoretical analysis with LS-DYNA numerical simulations to investigate eight stress cases (σ = 10~40 MPa, lateral stress coefficient K = 0~2). For the first time, a dimensionless confinement parameter, χ = σm/σt* + αχΔσ/σc, combining mean and deviatoric stresses, is introduced. And a unified exponential scaling relationship is established: Lc/a = 122.54exp(−0.80χ) + 4.9(R2 = 0.94). This quantitative relationship reveals a hoop stress phase transition: the tensile phase vanishes completely when the hydrostatic stress reaches approximately 30 MPa, and provides a practical theoretical basis for optimizing blasting parameters and predicting fragmentation extents in deep, high-stress mining and tunneling.
- 7 July 2026
- Published by MDPI AG in Geosciences
- Vol. 16 (7) , 279
Open AccessQuantitative Prediction of Blast-Induced Crack Length Around a Blasthole in Deep Rock Masses Under In Situ Stress
Deep rock blasting under high in situ stress is challenged by the suppression of stress wave propagation and the strong directional dependence of crack growth, which together make fragmentation control notoriously difficult. Existing studies remain largely qualitative and lack predictive mathematical relationships linking crack length to the in situ stress state. In this study, we combine theoretical analysis with LS-DYNA numerical simulations to investigate eight stress cases (σ = 10~40 MPa, lateral stress coefficient K = 0~2). For the first time, a dimensionless confinement parameter, χ = σm/σt* + αχΔσ/σc, combining mean and deviatoric stresses, is introduced. And a unified exponential scaling relationship is established: Lc/a = 122.54exp(−0.80χ) + 4.9(R2 = 0.94). This quantitative relationship reveals a hoop stress phase transition: the tensile phase vanishes completely when the hydrostatic stress reaches approximately 30 MPa, and provides a practical theoretical basis for optimizing blasting parameters and predicting fragmentation extents in deep, high-stress mining and tunneling.
- Open Access
- 23 April 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (9) , 4641
Impact of the Spatiotemporal Relationship Between Blast Source and Protected Area on Wave Arrival Sequence and Vibration Control Methods in Bench Blasting
The adjustment of delay time in open-pit bench blasting is a research hotspot in vibration control. Its core lies in utilizing the periodic characteristics of vibration waves to achieve the superposition and cancellation of wave peaks and troughs. However, due to the spatiotemporal variability in the propagation of blast-induced vibration waves, the optimal delay time determined for vibration control requirements at a specific protected area (monitoring point) makes it difficult to achieve the misalignment superposition effect simultaneously at multiple monitoring points. To address the challenge of multi-area vibration control in open-pit bench blasting, this paper proposes an adjustment method based on local delay adjustment. First, a spatiotemporal relationship model between blast holes with monitoring points is established to calculate vibration wave arrival times. This enables rapid hole identification during dense wave arrivals at monitoring points, with waveform separation achieved through initiation delay adjustments. Following the Anderson principle, reconstructed single-hole vibrations are superimposed according to the wave arrival sequence to validate control efficacy. Statistical analysis of concurrent wave arrivals across all-direction monitoring points identifies high-probability vibration hazard locations. Targeted delay adjustments for blast holes within clustering arrival periods at these locations enable comprehensive vibration reduction. Field data confirm that single-point control reduces peak vibration by >10.55% through simultaneously reducing the amount of waves in clustering arrival periods. Multi-point control resolves seven hazard locations across two directions, attaining 88.57% hazard elimination efficiency and 14.05% peak velocity attenuation. This method achieves vibration control through local delay adjustments while maintaining the fragmentation effect of the original scheme, providing a new approach to solving the challenge of vibration control in large-scale blasting areas.
- 23 April 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (9) , 4641
Open AccessImpact of the Spatiotemporal Relationship Between Blast Source and Protected Area on Wave Arrival Sequence and Vibration Control Methods in Bench Blasting
The adjustment of delay time in open-pit bench blasting is a research hotspot in vibration control. Its core lies in utilizing the periodic characteristics of vibration waves to achieve the superposition and cancellation of wave peaks and troughs. However, due to the spatiotemporal variability in the propagation of blast-induced vibration waves, the optimal delay time determined for vibration control requirements at a specific protected area (monitoring point) makes it difficult to achieve the misalignment superposition effect simultaneously at multiple monitoring points. To address the challenge of multi-area vibration control in open-pit bench blasting, this paper proposes an adjustment method based on local delay adjustment. First, a spatiotemporal relationship model between blast holes with monitoring points is established to calculate vibration wave arrival times. This enables rapid hole identification during dense wave arrivals at monitoring points, with waveform separation achieved through initiation delay adjustments. Following the Anderson principle, reconstructed single-hole vibrations are superimposed according to the wave arrival sequence to validate control efficacy. Statistical analysis of concurrent wave arrivals across all-direction monitoring points identifies high-probability vibration hazard locations. Targeted delay adjustments for blast holes within clustering arrival periods at these locations enable comprehensive vibration reduction. Field data confirm that single-point control reduces peak vibration by >10.55% through simultaneously reducing the amount of waves in clustering arrival periods. Multi-point control resolves seven hazard locations across two directions, attaining 88.57% hazard elimination efficiency and 14.05% peak velocity attenuation. This method achieves vibration control through local delay adjustments while maintaining the fragmentation effect of the original scheme, providing a new approach to solving the challenge of vibration control in large-scale blasting areas.
- Open Access
- 28 March 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (7) , 2868
Optimization Study of Water Interval Charge Structure Based on the Evaluation of Rock Damage Effect in Smooth Blasting
In tunnel smooth blasting, optimizing the water interval charging structure of peripheral holes is of great significance in improving the effect of smooth blasting and reducing the unit consumption of explosives. Addressing the issue of a single traditional evaluation standard, this paper proposes a composite index evaluation method for rock blasting damage in different zones, and the best charging structure is optimized according to the evaluation results. Taking Liyue Road Tunnel Light Smooth Blasting Project in Chongqing as the Research Background, the numeric models were established with ten kinds of charge structures, the charge structures and explosive quantity were optimized according to the evaluation results, and then the field tests were conducted. The results show that when the length of the water medium at the bottom of the hole is 20 cm, the damage range of the retained rock mass can be controlled while ensuring rock fragmentation. If the length of the water medium at the orifice and in the center of the hole is more than 30 cm, it will affect the superposition effect of the blast stress wave, resulting in under-excavation; in the preferred charge structure, the ratio of the length of the upper and lower explosives reaches 1:3, and the ratio of the length of the water medium is 2:2:1, which achieves a better rock-breaking effect in the field test.
- 28 March 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (7) , 2868
Open AccessOptimization Study of Water Interval Charge Structure Based on the Evaluation of Rock Damage Effect in Smooth Blasting
In tunnel smooth blasting, optimizing the water interval charging structure of peripheral holes is of great significance in improving the effect of smooth blasting and reducing the unit consumption of explosives. Addressing the issue of a single traditional evaluation standard, this paper proposes a composite index evaluation method for rock blasting damage in different zones, and the best charging structure is optimized according to the evaluation results. Taking Liyue Road Tunnel Light Smooth Blasting Project in Chongqing as the Research Background, the numeric models were established with ten kinds of charge structures, the charge structures and explosive quantity were optimized according to the evaluation results, and then the field tests were conducted. The results show that when the length of the water medium at the bottom of the hole is 20 cm, the damage range of the retained rock mass can be controlled while ensuring rock fragmentation. If the length of the water medium at the orifice and in the center of the hole is more than 30 cm, it will affect the superposition effect of the blast stress wave, resulting in under-excavation; in the preferred charge structure, the ratio of the length of the upper and lower explosives reaches 1:3, and the ratio of the length of the water medium is 2:2:1, which achieves a better rock-breaking effect in the field test.
- Open Access
Effect and Response of Coal and Rock Media Conditions on Deep-Hole Pre-Splitting Blasting Techniques for Gas Drainage
Different types of deep-hole blasting techniques are needed to solve gas drainage problems in complex and variable cases. Blasting parameters suitable for mines are selected based on the relationship between blast stress field changes and gas flow combined with field application and numerical simulation. The Datong Mine was a background to study the blast crush zone and drainage influence range following deep-hole blasting with holes laid in coal seams, which resulted in a 24% increase in gas flow in the drainage hole 6 m from the blast hole. In response to the difficulty of forming blast holes in the soft coal seam of the Yuyang Mine, drilling and blasting in the floor rock stratum adjacent to the coal seam increased the gas flow in the drainage holes by 125%. When applying the deep-hole technique with holes crossing multi-seams for gas drainage in Shiping Mine, the volume of gas drainage increases significantly with increased effective stress in the drainage hole. For example, when the spacing at the hole’s bottom between the blast hole and the drainage hole is 4.6 m, the volume of gas drainage increases by 3.3 times, compared with 8.8 m. Twenty-six protruding mines in southern China have applied the above deep-hole pre-splitting blasting technology, all of which have achieved good results and are of great significance to future applications in multiple fields, such as gas control.
Open AccessEffect and Response of Coal and Rock Media Conditions on Deep-Hole Pre-Splitting Blasting Techniques for Gas Drainage
Different types of deep-hole blasting techniques are needed to solve gas drainage problems in complex and variable cases. Blasting parameters suitable for mines are selected based on the relationship between blast stress field changes and gas flow combined with field application and numerical simulation. The Datong Mine was a background to study the blast crush zone and drainage influence range following deep-hole blasting with holes laid in coal seams, which resulted in a 24% increase in gas flow in the drainage hole 6 m from the blast hole. In response to the difficulty of forming blast holes in the soft coal seam of the Yuyang Mine, drilling and blasting in the floor rock stratum adjacent to the coal seam increased the gas flow in the drainage holes by 125%. When applying the deep-hole technique with holes crossing multi-seams for gas drainage in Shiping Mine, the volume of gas drainage increases significantly with increased effective stress in the drainage hole. For example, when the spacing at the hole’s bottom between the blast hole and the drainage hole is 4.6 m, the volume of gas drainage increases by 3.3 times, compared with 8.8 m. Twenty-six protruding mines in southern China have applied the above deep-hole pre-splitting blasting technology, all of which have achieved good results and are of great significance to future applications in multiple fields, such as gas control.
- Open Access
- 6 October 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (19) , 10061
Vibration Energy Comparison Helps Identify Formation Time of New Free Surface in Urban Tunnel Blasting
Cut blasting creates new free surfaces that facilitate rock breaking and reduces blast vibration. However, the time when the new free surface is formed is not clear in on-site blasting practices. This paper proposes a method to identify this formation time through a vibration energy comparison. Firstly, a variational mode decomposition method identified the initiation time sequence of high-precision detonators from the observed blast-induced vibration wave. Based on the superposition of the single-hole waves extracted from the single-free-surface blasting test, we constructed a predicted wave that shared the initiation time sequence with the observed one. The Hilbert transform found the accumulated energy curves of the two waves separately. By comparing the linear correlation of the two curves, we identified the new free surface’s formation time to improve the blast design. The tunnel-blasting case showed that 64.5 ms was required to form the new free surface. In the actual blasting, each cut hole used 1.0 kg of explosives. The maximum vibration velocity was 0.90 cm·s−1, which met the control target of less than 1.0 cm·s−1.
- 6 October 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (19) , 10061
Open AccessVibration Energy Comparison Helps Identify Formation Time of New Free Surface in Urban Tunnel Blasting
Cut blasting creates new free surfaces that facilitate rock breaking and reduces blast vibration. However, the time when the new free surface is formed is not clear in on-site blasting practices. This paper proposes a method to identify this formation time through a vibration energy comparison. Firstly, a variational mode decomposition method identified the initiation time sequence of high-precision detonators from the observed blast-induced vibration wave. Based on the superposition of the single-hole waves extracted from the single-free-surface blasting test, we constructed a predicted wave that shared the initiation time sequence with the observed one. The Hilbert transform found the accumulated energy curves of the two waves separately. By comparing the linear correlation of the two curves, we identified the new free surface’s formation time to improve the blast design. The tunnel-blasting case showed that 64.5 ms was required to form the new free surface. In the actual blasting, each cut hole used 1.0 kg of explosives. The maximum vibration velocity was 0.90 cm·s−1, which met the control target of less than 1.0 cm·s−1.