Xialin Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xialin Liu has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Feng Xia
China Railway Shanghai Design Institute Group Co., Ltd., Shanghai 200070, China
1 shared publication - Gang Zeng
School of Civil Engineering and Architecture Hubei University of Arts and Science Xiangyang China
1 shared publication - Jiang-Feng Ma
China Railway Shanghai Design Institute Group Co., Ltd., Shanghai 200070, China
1 shared publication - Jiguo Liu
CCCC Second Highway Consultants Co., Ltd., Wuhan 430056, China
1 shared publication - Longhai Wei
CCCC Second Highway Consultants Co., Ltd., Wuhan 430056, China
1 shared publication - Ping Wang
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
1 shared publication
Latest Publications
- Open Access
A Multi-Stage Data-Driven Process for Magnetic Azimuth Error Compensation in Horizontal Wells Under Complex Magnetic Environments
With the increasing use of horizontal wells in oil and gas development, measurement-while-drilling (MWD) systems require higher magnetic azimuth accuracy to ensure precise trajectory control. This study proposes a three-stage magnetic azimuth error compensation method based on multi-station analysis (MSA). First, the OPTICS clustering algorithm is utilized to identify and remove noise points, and ellipse fitting is applied to suppress radial magnetic interference. Second, an improved MSA model incorporating wellbore trajectory constraints is developed to minimize axial interference and enhance correction stability. Finally, a Gaussian Process Regression (GPR) model, using accelerometer and magnetometer data as features, is introduced to model and compensate for residual nonlinear errors. Experimental validation under simulated complex magnetic conditions shows that OPTICS-based preprocessing significantly improves ellipse fitting and reduces hard magnetic interference. The improved MSA lowers the mean azimuth error to approximately 2.5°, while integrating GPR further decreases it to below 0.04°. The proposed GPR model achieves an R2 of 0.99972 and an RMSE of 0.02928° on the test set, confirming its strong nonlinear compensation capability. Overall, the proposed framework effectively suppresses magnetic interference and enhances azimuth accuracy, providing a robust solution for high-precision MWD applications in horizontal wells.
Open AccessA Multi-Stage Data-Driven Process for Magnetic Azimuth Error Compensation in Horizontal Wells Under Complex Magnetic Environments
With the increasing use of horizontal wells in oil and gas development, measurement-while-drilling (MWD) systems require higher magnetic azimuth accuracy to ensure precise trajectory control. This study proposes a three-stage magnetic azimuth error compensation method based on multi-station analysis (MSA). First, the OPTICS clustering algorithm is utilized to identify and remove noise points, and ellipse fitting is applied to suppress radial magnetic interference. Second, an improved MSA model incorporating wellbore trajectory constraints is developed to minimize axial interference and enhance correction stability. Finally, a Gaussian Process Regression (GPR) model, using accelerometer and magnetometer data as features, is introduced to model and compensate for residual nonlinear errors. Experimental validation under simulated complex magnetic conditions shows that OPTICS-based preprocessing significantly improves ellipse fitting and reduces hard magnetic interference. The improved MSA lowers the mean azimuth error to approximately 2.5°, while integrating GPR further decreases it to below 0.04°. The proposed GPR model achieves an R2 of 0.99972 and an RMSE of 0.02928° on the test set, confirming its strong nonlinear compensation capability. Overall, the proposed framework effectively suppresses magnetic interference and enhances azimuth accuracy, providing a robust solution for high-precision MWD applications in horizontal wells.
- Open Access
- 1 December 2022
- Published by MDPI AG in Separations
- Vol. 9 (12) , 402
Effects of Temperature on the Leaching Behavior of Pb from Cement Stabilization/Solidification-Treated Contaminated Soil
Solidification/stabilization (S/S) is one of the most widely used techniques in the disposal of heavy-metal-contaminated soil, though the long-term effectiveness of S/S technology remains implicit. Temperature is an important factor affecting the leaching behavior of heavy metals and the long-term effectiveness of S/S treatment. This study systematically explored the influence of temperature on the leaching behavior of lead in an S/S monolith through semi-dynamic leaching test at different temperatures. The results showed that an increase in temperature could accelerate the leaching concentration and cumulative leaching amount of lead ions in the S/S monolith. The cumulative leaching amount of lead ions in the S/S monolith after 11 days at 55 °C was about 5.8 times that at 25 °C. The leaching rate of lead ions in the S/S monolith increased with the increase in temperature. The leaching index of lead ions was larger than 9, which met the requirements for “controlled utilization” in the environment. The leaching mechanism of lead ions was diffusion control and did not change in the temperature range of 25–55 °C. These findings indicate that temperature affects the leaching behavior and the long-term effectiveness of S/S treatment, and temperature variation should be considered in the effectiveness evaluation of S/S treatment.
- 1 December 2022
- Published by MDPI AG in Separations
- Vol. 9 (12) , 402
Open AccessEffects of Temperature on the Leaching Behavior of Pb from Cement Stabilization/Solidification-Treated Contaminated Soil
Solidification/stabilization (S/S) is one of the most widely used techniques in the disposal of heavy-metal-contaminated soil, though the long-term effectiveness of S/S technology remains implicit. Temperature is an important factor affecting the leaching behavior of heavy metals and the long-term effectiveness of S/S treatment. This study systematically explored the influence of temperature on the leaching behavior of lead in an S/S monolith through semi-dynamic leaching test at different temperatures. The results showed that an increase in temperature could accelerate the leaching concentration and cumulative leaching amount of lead ions in the S/S monolith. The cumulative leaching amount of lead ions in the S/S monolith after 11 days at 55 °C was about 5.8 times that at 25 °C. The leaching rate of lead ions in the S/S monolith increased with the increase in temperature. The leaching index of lead ions was larger than 9, which met the requirements for “controlled utilization” in the environment. The leaching mechanism of lead ions was diffusion control and did not change in the temperature range of 25–55 °C. These findings indicate that temperature affects the leaching behavior and the long-term effectiveness of S/S treatment, and temperature variation should be considered in the effectiveness evaluation of S/S treatment.
- Open Access
- 1 January 2022
- Published by Wiley in Advances in Civil Engineering
- Vol. 2022 (1)
Predicting Tunnel Groundwater Inflow by Geological Investigation Using Horizontal Directional Drilling Technology
To improve the prediction accuracy of tunnel excavation groundwater inflow, a prediction method based on a horizontal directional drilling geological survey is proposed. It relies on the monitoring and statistical analysis of groundwater inflow into a horizontal directional drilling survey borehole. Moreover, it is based on Goodman’s empirical back‐calculation for the surrounding rock penetration coefficient and uses the groundwater dynamics method to predict the amount of inflow into the tunnel excavation. On the basis of an analysis of the Tianshan Shengli Tunnel, the following conclusions were obtained: the tunnel excavation groundwater inflow prediction method based on a horizontal directional drilling geological survey borehole can be used to obtain the permeability coefficient value of the surrounding rock, which can be used in the groundwater dynamics method to improve the prediction accuracy; the groundwater runoff modulus method and the atmospheric precipitation infiltration method underestimate the prediction results for tunnel groundwater inflow; and the groundwater dynamics calculation results based on the horizontal survey hole prediction method are more reliable. Goodman’s empirical formula was used to predict normal groundwater inflow within the 2,271 m length from the tunnel entrance: the normal groundwater inflow into the right tunnel was approximately 6,441 m3/d, and the maximum groundwater inflow was approximately 19,323 m3/d. When the tunnel crosses the fault zone, the groundwater inflow increases significantly. The normal groundwater inflow per unit footage is approximately 7.30 m3/(d·m), and the portion of the tunnel that crosses the fault zone is a medium to strong water‐rich section.
- 1 January 2022
- Published by Wiley in Advances in Civil Engineering
- Vol. 2022 (1)
Open AccessPredicting Tunnel Groundwater Inflow by Geological Investigation Using Horizontal Directional Drilling Technology
To improve the prediction accuracy of tunnel excavation groundwater inflow, a prediction method based on a horizontal directional drilling geological survey is proposed. It relies on the monitoring and statistical analysis of groundwater inflow into a horizontal directional drilling survey borehole. Moreover, it is based on Goodman’s empirical back‐calculation for the surrounding rock penetration coefficient and uses the groundwater dynamics method to predict the amount of inflow into the tunnel excavation. On the basis of an analysis of the Tianshan Shengli Tunnel, the following conclusions were obtained: the tunnel excavation groundwater inflow prediction method based on a horizontal directional drilling geological survey borehole can be used to obtain the permeability coefficient value of the surrounding rock, which can be used in the groundwater dynamics method to improve the prediction accuracy; the groundwater runoff modulus method and the atmospheric precipitation infiltration method underestimate the prediction results for tunnel groundwater inflow; and the groundwater dynamics calculation results based on the horizontal survey hole prediction method are more reliable. Goodman’s empirical formula was used to predict normal groundwater inflow within the 2,271 m length from the tunnel entrance: the normal groundwater inflow into the right tunnel was approximately 6,441 m3/d, and the maximum groundwater inflow was approximately 19,323 m3/d. When the tunnel crosses the fault zone, the groundwater inflow increases significantly. The normal groundwater inflow per unit footage is approximately 7.30 m3/(d·m), and the portion of the tunnel that crosses the fault zone is a medium to strong water‐rich section.