Abdur Rohim Boy Berawi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abdur Rohim Boy Berawi has a total of 34 co-authors. Here are the top co-authors by number of shared publications:
- Mohammed Ali Berawi
Universitas Indonesia
11 shared publications - Perdana Miraj
Delft University of Technology, Netherlands
10 shared publications Bambang Susantono
Center for Sustainable Infrastructure Development, Faculty of Engineering, Universitas Indonesia, Depok, 16424, Indonesia
5 shared publicationsMohammed Ali Berawi
5 shared publicationsSuyono Dikun
4 shared publicationsTommy Ilyas
4 shared publications
Latest Publications
- 10 October 2020
- Published by Springer Nature
- p. 77-100
Accelerating Nation Competitiveness Through Economic Corridor Development: Indonesia Masterplan Revisited
- 10 October 2020
- Published by Springer Nature
- p. 77-100
Accelerating Nation Competitiveness Through Economic Corridor Development: Indonesia Masterplan Revisited
- Open Access
- 21 December 2018
- Published by International Journal of Technology in International Journal of Technology
- Vol. 9 (7) , 1329-1337
Forecasting the Land Value around Commuter Rail Stations using Hedonic Price Modeling
The value of land is determined by the relationship between supply and demand in the land market and the land’s location, physical structure, and surrounding area. During infrastructure development, changes in land use and its characteristics are possible and may directly affect the land price significantly. This research aims to generate a prediction model of land market values in response to transportation infrastructure development and elaborates a correlation among factors affecting the land price. A hedonic pricing model is used through multiple linear regression to seek contributing factors affecting the land price. The result shows that the proposed hedonic model can predict the price of land using the model LnLand Price = 16.991 + 0.203 Shape of land + 0.084 Economy of Residents – 0.719 LogStation – 0.405 LogAge. This estimated formula could be used as part of a land value capture mechanism for future development.
- 21 December 2018
- Published by International Journal of Technology in International Journal of Technology
- Vol. 9 (7) , 1329-1337
Open AccessForecasting the Land Value around Commuter Rail Stations using Hedonic Price Modeling
The value of land is determined by the relationship between supply and demand in the land market and the land’s location, physical structure, and surrounding area. During infrastructure development, changes in land use and its characteristics are possible and may directly affect the land price significantly. This research aims to generate a prediction model of land market values in response to transportation infrastructure development and elaborates a correlation among factors affecting the land price. A hedonic pricing model is used through multiple linear regression to seek contributing factors affecting the land price. The result shows that the proposed hedonic model can predict the price of land using the model LnLand Price = 16.991 + 0.203 Shape of land + 0.084 Economy of Residents – 0.719 LogStation – 0.405 LogAge. This estimated formula could be used as part of a land value capture mechanism for future development.
- 26 June 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1977 (1) , 040002
Improving toll road feasibility: Route development and cost estimation
Infrastructure is a significant element in an effort to improve nation’s competitiveness at the global scale. As a developing country, Indonesia currently attempts to improve the quality and expand the quantity of its infrastructure by initiating mega project infrastructure, e.g. Trans–Sumatera Toll Road. The project located in the western part of Indonesia, in Sumatera Island. It connects Lampung province to Aceh province for about 2,788 km. Although the project will substantially increase the economic activities of people, the amount of investment is relatively huge. It requires approximately 340 trillion rupiahs or equal to US$ 24.29 billion only for the construction. Thus, route planning in the initial stage shall be comprehensively investigated to produce higher benefits over cost. The purpose of this research is to develop alternative route planning for Trans–Sumatera Toll Road by taking into account the southern part of Sumatera as the case study. Quantitative and qualitative approaches were to achieve project objectives through in-depth interview and financial analysis. This findings show that the southern part of Sumatera has potential contribution to the regional economic activities and national growth. The result also generates potential featured sectors for each province such as mining and quarrying, agriculture, fishery, and so on. Initial cost for the alternative route in the southern part of Sumatera is estimated about 120.85 trillion rupiahs or equal to US$ 8.95 billion.
- 26 June 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1977 (1) , 040002
Improving toll road feasibility: Route development and cost estimation
Infrastructure is a significant element in an effort to improve nation’s competitiveness at the global scale. As a developing country, Indonesia currently attempts to improve the quality and expand the quantity of its infrastructure by initiating mega project infrastructure, e.g. Trans–Sumatera Toll Road. The project located in the western part of Indonesia, in Sumatera Island. It connects Lampung province to Aceh province for about 2,788 km. Although the project will substantially increase the economic activities of people, the amount of investment is relatively huge. It requires approximately 340 trillion rupiahs or equal to US$ 24.29 billion only for the construction. Thus, route planning in the initial stage shall be comprehensively investigated to produce higher benefits over cost. The purpose of this research is to develop alternative route planning for Trans–Sumatera Toll Road by taking into account the southern part of Sumatera as the case study. Quantitative and qualitative approaches were to achieve project objectives through in-depth interview and financial analysis. This findings show that the southern part of Sumatera has potential contribution to the regional economic activities and national growth. The result also generates potential featured sectors for each province such as mining and quarrying, agriculture, fishery, and so on. Initial cost for the alternative route in the southern part of Sumatera is estimated about 120.85 trillion rupiahs or equal to US$ 8.95 billion.
- Open Access
- 26 December 2017
- Published by International Journal of Technology in International Journal of Technology
- Vol. 8 (6) , 1141
Increasing Added Value for the New City of Walini Through Infrastructure Project Development
The government of Indonesia continues to promote infrastructure development in various sectors such as road transport, ports, and new railway lines. One of the large infrastructure projects that aims to increase regional and national economic growth is the high-speed rail line linking Jakarta and Bandung. The connecting of these two major cities (Jakarta in the north-west of Java Island and Bandung in the south-west) will significantly contribute to the country’s gross domestic product (GDP). As one of the areas that will be connected to the high-speed rail line, Walini has tremendous potential for development. There is the opportunity to develop the new city as a center for agriculture commodities such as tea and rubber, but other city development formats should also be considered, such as business capital, government functions, or IT. The development of Walini requires proper planning and a comprehensive conceptual design which focuses on the vision developed in the initial blueprint. This research aims to conduct a comprehensive study by considering development prospects and regional characteristics, as well as added value to increase competitiveness in terms of infrastructure, technological readiness, and urban development. It will combine approaches from both qualitative perspectives and quantitative investigation, using in-depth interviews and a decision matrix as evaluation tools to select the best alternative for the direction of city planning. This study produces a strategic recommendation for government and other related stakeholders about regional development and urban city planning for Walini as a new IT-based city and technology park.
- 26 December 2017
- Published by International Journal of Technology in International Journal of Technology
- Vol. 8 (6) , 1141
Open AccessIncreasing Added Value for the New City of Walini Through Infrastructure Project Development
The government of Indonesia continues to promote infrastructure development in various sectors such as road transport, ports, and new railway lines. One of the large infrastructure projects that aims to increase regional and national economic growth is the high-speed rail line linking Jakarta and Bandung. The connecting of these two major cities (Jakarta in the north-west of Java Island and Bandung in the south-west) will significantly contribute to the country’s gross domestic product (GDP). As one of the areas that will be connected to the high-speed rail line, Walini has tremendous potential for development. There is the opportunity to develop the new city as a center for agriculture commodities such as tea and rubber, but other city development formats should also be considered, such as business capital, government functions, or IT. The development of Walini requires proper planning and a comprehensive conceptual design which focuses on the vision developed in the initial blueprint. This research aims to conduct a comprehensive study by considering development prospects and regional characteristics, as well as added value to increase competitiveness in terms of infrastructure, technological readiness, and urban development. It will combine approaches from both qualitative perspectives and quantitative investigation, using in-depth interviews and a decision matrix as evaluation tools to select the best alternative for the direction of city planning. This study produces a strategic recommendation for government and other related stakeholders about regional development and urban city planning for Walini as a new IT-based city and technology park.
- 1 July 2017
- Published by American Scientific Publishers in Advanced Science Letters
- Vol. 23 (7) , 6343-6346
A Benchmark Study for Indonesia’s High Speed Train Considering Technology Selection
The availability of infrastructure is a prerequisite for developing countries such as Indonesia to accelerate and to expand their economic activities. Jakarta–Surabaya high speed train (HST) is one of mega infrastructure initiative in Indonesia that will be expected to increase accessibility and economic activities in most populated Java Island. As technology is playing significant role in determining the concept of High Speed Train, this research will investigate the selection of technology including rolling stock, railway track, signaling, and electricity. This research combines qualitative and quantitative approach that use Indonesia’s High Speed Train as the case study. Initially, the technology that potentially implemented for high speed train in the country is being investigated though literature studies and benchmarking process. It will then cross-checked and validated by using a qualitative approach by using in-depth interview. The result select EMU as the rolling stock, a combination of ballasted and ballastless track for track structure, continuous TC with fixed block for signaling system, and AC 25 kV 50 Hz for the electricity. This paper also reveals initial cost as well as operation and maintenance cost for four elements of technology that being investigated.
- 1 July 2017
- Published by American Scientific Publishers in Advanced Science Letters
- Vol. 23 (7) , 6343-6346
A Benchmark Study for Indonesia’s High Speed Train Considering Technology Selection
The availability of infrastructure is a prerequisite for developing countries such as Indonesia to accelerate and to expand their economic activities. Jakarta–Surabaya high speed train (HST) is one of mega infrastructure initiative in Indonesia that will be expected to increase accessibility and economic activities in most populated Java Island. As technology is playing significant role in determining the concept of High Speed Train, this research will investigate the selection of technology including rolling stock, railway track, signaling, and electricity. This research combines qualitative and quantitative approach that use Indonesia’s High Speed Train as the case study. Initially, the technology that potentially implemented for high speed train in the country is being investigated though literature studies and benchmarking process. It will then cross-checked and validated by using a qualitative approach by using in-depth interview. The result select EMU as the rolling stock, a combination of ballasted and ballastless track for track structure, continuous TC with fixed block for signaling system, and AC 25 kV 50 Hz for the electricity. This paper also reveals initial cost as well as operation and maintenance cost for four elements of technology that being investigated.
- Open Access
- 9 March 2017
- Published by EDP Sciences in MATEC Web of Conferences
- Vol. 101, 05002
Track access charge for Indonesian railways using full cost method: improving industry competitiveness
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry
- 9 March 2017
- Published by EDP Sciences in MATEC Web of Conferences
- Vol. 101, 05002
Open AccessTrack access charge for Indonesian railways using full cost method: improving industry competitiveness
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
Modeling track access charge to enhance railway industry performance
Indonesia attempts to improve nation’s competitiveness by increasing the quality and the availability of railway network. However, the infrastructure improperly managed by the operator in terms of the technical issue. One of the reasons for this problem is an unbalanced value of infrastructure charge. In 2000’s track access charge and infrastructure maintenance and operation for Indonesia railways are equal and despite current formula of the infrastructure charge, issues of transparency and accountability still in question. This research aims to produce an alternative scheme of track access charge by considering marginal cost plus markup (MC+) approach. The research combines qualitative and quantitative method through an in-depth interview and financial analysis. The result will generate alternative formula of infrastructure charge in Indonesia’s railway industry. The simulation also conducted to estimate track access charge for the operator and to forecast government support in terms of subsidy. The result is expected to enhance railway industry performance and competitiveness.
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
Modeling track access charge to enhance railway industry performance
Indonesia attempts to improve nation’s competitiveness by increasing the quality and the availability of railway network. However, the infrastructure improperly managed by the operator in terms of the technical issue. One of the reasons for this problem is an unbalanced value of infrastructure charge. In 2000’s track access charge and infrastructure maintenance and operation for Indonesia railways are equal and despite current formula of the infrastructure charge, issues of transparency and accountability still in question. This research aims to produce an alternative scheme of track access charge by considering marginal cost plus markup (MC+) approach. The research combines qualitative and quantitative method through an in-depth interview and financial analysis. The result will generate alternative formula of infrastructure charge in Indonesia’s railway industry. The simulation also conducted to estimate track access charge for the operator and to forecast government support in terms of subsidy. The result is expected to enhance railway industry performance and competitiveness.
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
Improving building performance using smart building concept: Benefit cost ratio comparison
Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
Improving building performance using smart building concept: Benefit cost ratio comparison
Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.
- 31 December 2016
- Published by International Journal of Technology in International Journal of Technology
- Vol. 7 (8) , 1444-1453
Towards Self-sufficient Demand in 2030: Analysis of Life-cycle Cost for Indonesian Energy Infrastructure
IJTech International Journal of Technology
- 31 December 2016
- Published by International Journal of Technology in International Journal of Technology
- Vol. 7 (8) , 1444-1453
Towards Self-sufficient Demand in 2030: Analysis of Life-cycle Cost for Indonesian Energy Infrastructure
IJTech International Journal of Technology