Xi-Chun Tian
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Xi-Chun Tian has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Guangyuan Yu
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China
1 shared publication- Haojie Xue
State Key Laboratory for Tunnel Engineering, Shandong University, Jinan, China
1 shared publication Haoseng Wang
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China
1 shared publication- Jianning Liu
State Key Laboratory for Tunnel Engineering, China University of Mining and Technology (Beijing), Beijing, China
1 shared publication Jiong Wang
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China
1 shared publication- Jun Yang
State Key Laboratory for Tunnel Engineering, China University of Mining and Technology (Beijing), Beijing, China
1 shared publication
Latest Publications
- Open Access
- 27 April 2022
- Published by SAGE Publications in Energy Exploration & Exploitation
- Vol. 40 (5) , 1494-1521
Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam
In the mining of close coal seam, the stress concentration under the residual coal pillar in the upper coal seam leads to serious deformation to roadway surrounding rock in the lower coal seam. Hence, it poses a huge challenge to the maintenance of entry surrounding rock. Based on this, an approach of entry surrounding rock control technology, directional pre-splitting, and roof-cutting pressure relief, was applied. The stress and deformation of entry surrounding rock utilizing directional pre-splitting and roof-cutting pressure relief were studied by numerical simulation and field test The results indicated that the depth of stress concentration under the residual coal pillar achieve 44 m. With the application of the roof presplitting, the vertical stress of the entry roof decreased. Utilizing the roof presplitting with a height of 7 m and an angle of 15°, the gangue filled the goaf and supported the overlying strata. Meanwhile, the surrounding rock of entry was controlled with a constant resistance anchor cable (9 m length) and gangue prevention support structure. Through field test monitoring, the roof pressure and the deformation of surrounding rock increases rapidly at 30 ∼ 110 m behind the working face. From 110 ∼ 160 m, the increased rate of roof pressure and surrounding rock deformation gradually slows down and tends to be stable at 160 m behind the working face. The maximum displacement of the roof to the floor is 511 mm, and the maximum displacement of the gangue rock wall to coal wall is 421 mm. The remaining roadway meets the demand of the adjacent working face.
- 27 April 2022
- Published by SAGE Publications in Energy Exploration & Exploitation
- Vol. 40 (5) , 1494-1521
Open AccessResearch and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam
In the mining of close coal seam, the stress concentration under the residual coal pillar in the upper coal seam leads to serious deformation to roadway surrounding rock in the lower coal seam. Hence, it poses a huge challenge to the maintenance of entry surrounding rock. Based on this, an approach of entry surrounding rock control technology, directional pre-splitting, and roof-cutting pressure relief, was applied. The stress and deformation of entry surrounding rock utilizing directional pre-splitting and roof-cutting pressure relief were studied by numerical simulation and field test The results indicated that the depth of stress concentration under the residual coal pillar achieve 44 m. With the application of the roof presplitting, the vertical stress of the entry roof decreased. Utilizing the roof presplitting with a height of 7 m and an angle of 15°, the gangue filled the goaf and supported the overlying strata. Meanwhile, the surrounding rock of entry was controlled with a constant resistance anchor cable (9 m length) and gangue prevention support structure. Through field test monitoring, the roof pressure and the deformation of surrounding rock increases rapidly at 30 ∼ 110 m behind the working face. From 110 ∼ 160 m, the increased rate of roof pressure and surrounding rock deformation gradually slows down and tends to be stable at 160 m behind the working face. The maximum displacement of the roof to the floor is 511 mm, and the maximum displacement of the gangue rock wall to coal wall is 421 mm. The remaining roadway meets the demand of the adjacent working face.
- 26 February 2020
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 13 (5) , 1-15
The stability and pressure behavior characteristics of a special L-type face end formed by low-pressure mining technology without pre-driving roadway
- 26 February 2020
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 13 (5) , 1-15
The stability and pressure behavior characteristics of a special L-type face end formed by low-pressure mining technology without pre-driving roadway