Jinbo Song
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jinbo Song has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Bingqing Li
CNPC Xibu Drilling Engineering Co., Ltd., Urumqi 830011, China
1 shared publication - Feifei Zhang
School of Petroleum Engineering, Yangtze University, Wuhan 430100, China
1 shared publication - Jianlong Wang
School of Petroleum Engineering, Yangtze University, Wuhan 430100, China
1 shared publication - Linlin Gan
Engineering and Technology Research Institute of CNPC Bohai Drilling Engineering Co., Ltd., Tianjin 300457, China
1 shared publication - Qiong Wu
PetroChina Tarim Oilfield Branch, Korla 841000, China
1 shared publication - Xueying Wang
School of Petroleum Engineering, Yangtze University, Wuhan 430100, China
1 shared publication
Latest Publications
- Open Access
Real-Time Drilling Parameter Optimization Model Based on the Constrained Bayesian Method
To solve the problems of the low energy efficiency and slow penetration rate of drilling, we took the geological data of adjacent wells, real-time logging data, and downhole engineering parameters as inputs; the mechanical specific energy and unit footage cost as multi-objective optimization functions; and the machine pump equipment limit as the constraint condition. A constrained Bayesian optimization algorithm model was established for the optimization solution, and drilling parameters such as weight-of-bit, revolutions per minute, and flowrate were optimized in real time. Through a comparison with NSGA-II, random search, and other optimization algorithms, and the application results of example wells, we show that the established Bayesian optimization algorithm has a good optimization effect while maintaining timeliness. It is suitable for real-time optimization of drilling parameters, can aid a driller in identifying the drilling rate and potential tapping area, and provides a decision-making basis for avoiding the low-efficiency rock-breaking working area and improving rock-breaking efficiency.
Open AccessReal-Time Drilling Parameter Optimization Model Based on the Constrained Bayesian Method
To solve the problems of the low energy efficiency and slow penetration rate of drilling, we took the geological data of adjacent wells, real-time logging data, and downhole engineering parameters as inputs; the mechanical specific energy and unit footage cost as multi-objective optimization functions; and the machine pump equipment limit as the constraint condition. A constrained Bayesian optimization algorithm model was established for the optimization solution, and drilling parameters such as weight-of-bit, revolutions per minute, and flowrate were optimized in real time. Through a comparison with NSGA-II, random search, and other optimization algorithms, and the application results of example wells, we show that the established Bayesian optimization algorithm has a good optimization effect while maintaining timeliness. It is suitable for real-time optimization of drilling parameters, can aid a driller in identifying the drilling rate and potential tapping area, and provides a decision-making basis for avoiding the low-efficiency rock-breaking working area and improving rock-breaking efficiency.