Yunfei Chu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Yunfei Chu has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Boqiang Li
Economic and Technology Research Institute, State Grid Jilin Electric Power Co., Ltd., Changchun, Jilin, China
1 shared publication - Boqiang Li
Economic and Technological Research Institute of State Grid Jilin Electric Power Co., Ltd., Changchun 130022, China
1 shared publication - Chong Wang
Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education, Northeast Electric Power University, Jilin 132012, China
1 shared publication - Hongyao Gao
Changchun University of Technology
1 shared publication - Jian Gao
Songyuan Power Supply Company of State Grid Jilin Electric Power Co., Ltd., Songyuan 138000, China
1 shared publication - Jiazhen Wu
Construction Branch, State Grid Jilin Electric Power Co., Ltd., Changchun 130021, China
1 shared publication
Latest Publications
- Open Access
Management Optimization and Risk Assessment of 500 kV Substation Construction Projects with Multi-Professional Collaboration
In response to the difficulties in multi-disciplinary coordination, the complexity of schedule management, and the weakness of risk control in the construction of high-voltage substations, and based on the current construction status and historical experience of high-voltage projects in Jilin Province, this paper, from the perspectives of schedule and risk management, proposes a multi-disciplinary coordination and risk control strategy that integrates the work breakdown structure (WBS), design structure matrix (DSM), critical chain project management (CCPM), and the fuzzy analytic hierarchy process (FAHP). First, the task flow is decomposed using WBS, and DSM-based coupling analysis is employed to identify interdependencies among disciplines, thereby optimizing task sequencing and parallel arrangements. Second, an optimized project schedule model is established using CCPM, with aggregated buffers that enhance the reliability and flexibility of schedule management. Finally, a risk register is developed based on field investigations, and a three-dimensional quality–schedule–safety risk assessment model is constructed using FAHP; targeted risk prevention and control measures are then proposed according to the quantitative evaluation results. A 500 kV substation project in Jilin Province is adopted as a case study for application and verification. Compared with traditional serial scheduling, the proposed schedule optimization strategy shortens the overall project duration by 29.1%. Furthermore, targeted management recommendations were proposed based on the risk assessment results of the project. The proposed optimization strategy can provide theoretical support and practical guidance for the construction of high-voltage substations and their associated projects, forming an effective technical solution that is scalable and replicable, and it is of great significance for improving the level of project construction management.
Open AccessManagement Optimization and Risk Assessment of 500 kV Substation Construction Projects with Multi-Professional Collaboration
In response to the difficulties in multi-disciplinary coordination, the complexity of schedule management, and the weakness of risk control in the construction of high-voltage substations, and based on the current construction status and historical experience of high-voltage projects in Jilin Province, this paper, from the perspectives of schedule and risk management, proposes a multi-disciplinary coordination and risk control strategy that integrates the work breakdown structure (WBS), design structure matrix (DSM), critical chain project management (CCPM), and the fuzzy analytic hierarchy process (FAHP). First, the task flow is decomposed using WBS, and DSM-based coupling analysis is employed to identify interdependencies among disciplines, thereby optimizing task sequencing and parallel arrangements. Second, an optimized project schedule model is established using CCPM, with aggregated buffers that enhance the reliability and flexibility of schedule management. Finally, a risk register is developed based on field investigations, and a three-dimensional quality–schedule–safety risk assessment model is constructed using FAHP; targeted risk prevention and control measures are then proposed according to the quantitative evaluation results. A 500 kV substation project in Jilin Province is adopted as a case study for application and verification. Compared with traditional serial scheduling, the proposed schedule optimization strategy shortens the overall project duration by 29.1%. Furthermore, targeted management recommendations were proposed based on the risk assessment results of the project. The proposed optimization strategy can provide theoretical support and practical guidance for the construction of high-voltage substations and their associated projects, forming an effective technical solution that is scalable and replicable, and it is of great significance for improving the level of project construction management.
- Open Access
- 24 September 2025
- Published by MDPI AG in Electronics
- Vol. 14 (19) , 3765
Resilience-Oriented Repair Strategy for Integrated Electricity and Natural Gas Systems with Line Pack Consideration
Earthquakes threaten the security and stability of urban integrated energy systems. Enhancing system resilience improves the ability to withstand seismic hazards. This paper proposes a coordinated post-disaster restoration strategy for integrated electricity and natural gas systems (IENGSs) that exploits natural gas line pack under seismic conditions. First, a line pack model is developed to quantify its impact on IENGS resilience. Subsequently, leveraging the load-supporting capability of line pack, we investigate how distribution network reconfiguration influences IENGS load recovery. Accounting for cross-system fault propagation during earthquakes, we formulate a post-disaster repair strategy incorporating line pack flexibility. Case studies using the IEEE 33-bus power system and a 7-node natural gas system validate the proposed strategy’s effectiveness and feasibility in enhancing seismic resilience.
- 24 September 2025
- Published by MDPI AG in Electronics
- Vol. 14 (19) , 3765
Open AccessResilience-Oriented Repair Strategy for Integrated Electricity and Natural Gas Systems with Line Pack Consideration
Earthquakes threaten the security and stability of urban integrated energy systems. Enhancing system resilience improves the ability to withstand seismic hazards. This paper proposes a coordinated post-disaster restoration strategy for integrated electricity and natural gas systems (IENGSs) that exploits natural gas line pack under seismic conditions. First, a line pack model is developed to quantify its impact on IENGS resilience. Subsequently, leveraging the load-supporting capability of line pack, we investigate how distribution network reconfiguration influences IENGS load recovery. Accounting for cross-system fault propagation during earthquakes, we formulate a post-disaster repair strategy incorporating line pack flexibility. Case studies using the IEEE 33-bus power system and a 7-node natural gas system validate the proposed strategy’s effectiveness and feasibility in enhancing seismic resilience.
- Open Access
A Reinforcement Learning-Based Dynamic Network Reconfiguration Strategy Considering the Coordinated Optimization of SOPs and Traditional Switches
With the growing integration of renewable sources on a large scale into modern power systems, the operation of distribution networks faces significant challenges under fluctuating renewable energy outputs. Therefore, achieving multi-objective optimization over multiple time periods, including minimizing energy losses and maximizing renewable energy utilization, has become a pressing issue. This paper proposes a Collaborative Intelligent Optimization Reconfiguration Strategy (CIORS) based on a dual-agent framework to achieve a global collaborative optimization of distribution networks in a multi-time period environment. CIORS addresses goal conflicts in multi-objective optimization by designing a collaborative reward mechanism. The discrete agent and continuous agent are responsible for optimizing the switch states within the distribution grid while coordinating the control of both active and reactive power flows through Soft Open Points (SOPs), respectively. To respond to the dynamic fluctuations of loads and renewable energy outputs, CIORS incorporates a dynamic weighting mechanism into the comprehensive reward function, allowing the flexible adjustment of the priority of each optimization objective. Furthermore, CIORS introduces a prioritized experience replay (PER) mechanism, which improves sample utilization efficiency and accelerates model convergence. Simulation results based on an actual distribution network in a specific area demonstrate that CIORS is effective under high-penetration clean energy scenarios.
Open AccessA Reinforcement Learning-Based Dynamic Network Reconfiguration Strategy Considering the Coordinated Optimization of SOPs and Traditional Switches
With the growing integration of renewable sources on a large scale into modern power systems, the operation of distribution networks faces significant challenges under fluctuating renewable energy outputs. Therefore, achieving multi-objective optimization over multiple time periods, including minimizing energy losses and maximizing renewable energy utilization, has become a pressing issue. This paper proposes a Collaborative Intelligent Optimization Reconfiguration Strategy (CIORS) based on a dual-agent framework to achieve a global collaborative optimization of distribution networks in a multi-time period environment. CIORS addresses goal conflicts in multi-objective optimization by designing a collaborative reward mechanism. The discrete agent and continuous agent are responsible for optimizing the switch states within the distribution grid while coordinating the control of both active and reactive power flows through Soft Open Points (SOPs), respectively. To respond to the dynamic fluctuations of loads and renewable energy outputs, CIORS incorporates a dynamic weighting mechanism into the comprehensive reward function, allowing the flexible adjustment of the priority of each optimization objective. Furthermore, CIORS introduces a prioritized experience replay (PER) mechanism, which improves sample utilization efficiency and accelerates model convergence. Simulation results based on an actual distribution network in a specific area demonstrate that CIORS is effective under high-penetration clean energy scenarios.
- Open Access
- 18 October 2024
- Published by Association for Computing Machinery (ACM)
- p. 1351-1354
Application and Optimization Study of ARIMA Model in Electricity Prosperity Index Forecasting
With the close connection between economic growth and electricity demand, how to predict the economic development trend through electricity data has become a key issue in power system planning. Therefore, this study proposes the “Electricity Prosperity Index” (EPI), which aims to quantify the correlation between electricity data and economic development, and to provide a forward-looking economic forecasting index. Based on this, this study applies and optimizes the ARIMA model to predict the power prosperity index. Firstly, the power prosperity index is constructed, and the data source, feature extraction and processing methods are systematically elaborated; then, the precision and stability of its prediction of economic development trend are improved by the parameter optimization and model structure adjustment of the ARIMA model. The experimental results show that the optimized ARIMA model can accurately predict the power prosperity index, better reflect the future economic development trend, and provide a scientific basis for the forward-looking planning of the power system.
- 18 October 2024
- Published by Association for Computing Machinery (ACM)
- p. 1351-1354
Open AccessApplication and Optimization Study of ARIMA Model in Electricity Prosperity Index Forecasting
With the close connection between economic growth and electricity demand, how to predict the economic development trend through electricity data has become a key issue in power system planning. Therefore, this study proposes the “Electricity Prosperity Index” (EPI), which aims to quantify the correlation between electricity data and economic development, and to provide a forward-looking economic forecasting index. Based on this, this study applies and optimizes the ARIMA model to predict the power prosperity index. Firstly, the power prosperity index is constructed, and the data source, feature extraction and processing methods are systematically elaborated; then, the precision and stability of its prediction of economic development trend are improved by the parameter optimization and model structure adjustment of the ARIMA model. The experimental results show that the optimized ARIMA model can accurately predict the power prosperity index, better reflect the future economic development trend, and provide a scientific basis for the forward-looking planning of the power system.
- Open Access
- 14 September 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 98535-98548
A Multiagent Federated Reinforcement Learning Approach for Plug-In Electric Vehicle Fleet Charging Coordination in a Residential Community
The increasing penetration of distributed renewable energy and electric vehicles (EV) in local microgrids/residential-community has brought a great challenge to balancing system stability and economic benefits. This paper proposes a decentralized framework based on an efficient federated deep reinforcement learning method for plug-in electric vehicle (PEV) fleet charging management in a residential community, which is equipped with a photovoltaic and battery energy storage system and connected to a local transformer. Firstly, the framework of PEV charging management is described as a virtual EV charging station coordinating charging tasks through sharing public information with distributed agents. Then, an individual preference model of PEV is developed considering heterogenous PEV charging anxiety, battery degradation, and collective penalty. Subsequently, we propose an attention-weighted federated soft-actor-critic method to efficiently seek the co-ordinational scheduling of the PEV fleet charging in a distributed way, where scalability and privacy protection can be ensured with attention-based information sharing. Finally, a real-world case study is conducted to validate the effectiveness and feasibility of the proposed approach.
- 14 September 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 98535-98548
Open AccessA Multiagent Federated Reinforcement Learning Approach for Plug-In Electric Vehicle Fleet Charging Coordination in a Residential Community
The increasing penetration of distributed renewable energy and electric vehicles (EV) in local microgrids/residential-community has brought a great challenge to balancing system stability and economic benefits. This paper proposes a decentralized framework based on an efficient federated deep reinforcement learning method for plug-in electric vehicle (PEV) fleet charging management in a residential community, which is equipped with a photovoltaic and battery energy storage system and connected to a local transformer. Firstly, the framework of PEV charging management is described as a virtual EV charging station coordinating charging tasks through sharing public information with distributed agents. Then, an individual preference model of PEV is developed considering heterogenous PEV charging anxiety, battery degradation, and collective penalty. Subsequently, we propose an attention-weighted federated soft-actor-critic method to efficiently seek the co-ordinational scheduling of the PEV fleet charging in a distributed way, where scalability and privacy protection can be ensured with attention-based information sharing. Finally, a real-world case study is conducted to validate the effectiveness and feasibility of the proposed approach.