IJIvan Jankovic

Ivan Jankovic

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ivan Jankovic has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Simulation of MCDM Process—Stope and Fan Pattern Selection in an Underground Mine with Uncertainty

    by Katarina Urošević, Zoran Gligorić, Ivan Janković, Branko Gluščević, Čedomir Beljić

    Multi-criteria decision making (MCDM) refers to methods and processes used to evaluate and prioritize options when multiple criteria are involved. Extensive research conducted in the past has shown that uncertainty is a pervasive challenge in the decision-making process, particularly in complex and dynamic environments, such as mining. When making decisions under uncertainty, especially in stope and fan pattern selection for underground mining, it is crucial to consider various aspects, including economic and production factors. This paper presents an application of simulation combined with the ranking alternatives by perimeter similarity (RAPS) method for optimal stope and fan pattern selection in an underground mine. The results obtained were compared with existing MCDM methodology technique for order of preference by similarity to ideal solution (TOPSIS) and showed a very high correlation, which indicates the applicability of new methodology for decision making in mining industry problems.


  • Open Access

    Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines

    by Ugljesa Bugaric, Milos Tanasijevic, Stevan Djenadic, Dragan Ignjatovic, Ivan Jankovic

    This paper presents the model for the identification of reference points on the lifetime curve of engineering systems. This curve commonly represents the increase and decline of failure in relation to time. A direct correlation between failure rate and costs is assumed in this paper, therefore, statistical and empirical analysis of costs provided reference points. This approach is used for positioning stages of the engineering system’s lifetime with a minimal number of failures and costs, regardless of whether these are acceptable or not. The following three stages are usually identified: the beginning, the stationary part and the end of life. The boundaries between them are recognized on the basis of minimum total lifetime costs and on economic lifetime costs. Model is tested on the dozers, machines frequently used in the mining industry for the earthmoving operations, and which are characterized by high operating and maintenance costs.