Jinhui Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jinhui Liu has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
Jiang Wu
3 shared publicationsKun Liu
3 shared publicationsXiaohong Guan
3 shared publications- Zhanbo Xu
MOE KLINNS Laboratory, Systems Engineering Institute, Xian Jiaotong University, Xian, China
3 shared publications - Jiang Wu
MOE KLINNS Lab, Xian Jiaotong University, Xian, China
2 shared publications - Xiaohong Guan
Xi'an Jiaotong University, Xi'an, China
2 shared publications
Latest Publications
- 20 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Automation Science and Engineering
- Vol. 23 (15455955) , 7379-7395
Computational Resource Management of Edge Clouds for Vehicle-to-Network Services With Resource Limit
This paper studies the online management of the computational resources between multiple edge clouds to minimize the operational cost for a vehicle-to-network (V2N) service provider, subject to stochastic trajectories of vehicles, the quality-of-service (QoS) and the resource limit. Due to the random mobility of vehicles, it poses challenges in real-time migration management when the computational capacity of each edge cloud and the stringent delay requirement of V2N services are both constrained, resulting in strong temporal-spatial coupling of the migration decisions. The problem could even be intractable to solve as the number of vehicles grows. To tackle these issues, we first propose a multi-layered cloud framework to gather and coordinate migration information between vehicles. Then, a multiagent rollout with feasibility construction approach is developed, where the migration decision can be optimized sequentially for each vehicle based on the coordinated migration information from the central cloud. To handle the potentially infeasible solutions caused by the computational resource constraint, we propose a heuristic method to determine the migration priority at each overloading edge cloud, and an integer program is constructed that can be easily solved to produce feasible solutions. The numerical results show the efficiency of the proposed approach in both economical performance and computational complexity compared to the benchmarks.
- 20 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Automation Science and Engineering
- Vol. 23 (15455955) , 7379-7395
Computational Resource Management of Edge Clouds for Vehicle-to-Network Services With Resource Limit
This paper studies the online management of the computational resources between multiple edge clouds to minimize the operational cost for a vehicle-to-network (V2N) service provider, subject to stochastic trajectories of vehicles, the quality-of-service (QoS) and the resource limit. Due to the random mobility of vehicles, it poses challenges in real-time migration management when the computational capacity of each edge cloud and the stringent delay requirement of V2N services are both constrained, resulting in strong temporal-spatial coupling of the migration decisions. The problem could even be intractable to solve as the number of vehicles grows. To tackle these issues, we first propose a multi-layered cloud framework to gather and coordinate migration information between vehicles. Then, a multiagent rollout with feasibility construction approach is developed, where the migration decision can be optimized sequentially for each vehicle based on the coordinated migration information from the central cloud. To handle the potentially infeasible solutions caused by the computational resource constraint, we propose a heuristic method to determine the migration priority at each overloading edge cloud, and an integer program is constructed that can be easily solved to produce feasible solutions. The numerical results show the efficiency of the proposed approach in both economical performance and computational complexity compared to the benchmarks.
- 15 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. PP (00939994) , 1-14
Performance Analysis of Hydrogen-based Backup Systems for Sustainable Internet Data Centers
Hydrogen-based backup systems (HBSs) are a promising alternative to diesel generators (DGs) in Internet data centers (IDCs) because of their high efficiency, fast response, and near-zero on-site emissions. However, their performance in terms of reliability, cost, and carbon emissions is not yet fully understood. This paper proposes an HBS for IDCs, where medium-temperature fuel cells (MTFCs) produce electricity and waste heat, and absorption chillers (ACs) use this heat to provide cooling. A unified model is developed to describe the links between hydrogen-based energy supply, computing workloads, and indoor temperature control. To evaluate both planning and operation performance, a Sequential Monte Carlo Simulation (SMCS) method is used, with Gaussian copula–based scenario generation and Sobol sequences to improve sampling efficiency. A case study of a pilot IDC in Yulin, China, shows that at a hydrogen price of $1/kg, the HBS can reach an average reliability of service of 99.999%, cut yearly operating costs by $3,750, and lower carbon emissions by 23,333 kg per rack compared with DG-based systems. These results show that HBSs can deliver high-reliability and low-carbon backup power for sustainable data center operation.
- 15 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. PP (00939994) , 1-14
Performance Analysis of Hydrogen-based Backup Systems for Sustainable Internet Data Centers
Hydrogen-based backup systems (HBSs) are a promising alternative to diesel generators (DGs) in Internet data centers (IDCs) because of their high efficiency, fast response, and near-zero on-site emissions. However, their performance in terms of reliability, cost, and carbon emissions is not yet fully understood. This paper proposes an HBS for IDCs, where medium-temperature fuel cells (MTFCs) produce electricity and waste heat, and absorption chillers (ACs) use this heat to provide cooling. A unified model is developed to describe the links between hydrogen-based energy supply, computing workloads, and indoor temperature control. To evaluate both planning and operation performance, a Sequential Monte Carlo Simulation (SMCS) method is used, with Gaussian copula–based scenario generation and Sobol sequences to improve sampling efficiency. A case study of a pilot IDC in Yulin, China, shows that at a hydrogen price of $1/kg, the HBS can reach an average reliability of service of 99.999%, cut yearly operating costs by $3,750, and lower carbon emissions by 23,333 kg per rack compared with DG-based systems. These results show that HBSs can deliver high-reliability and low-carbon backup power for sustainable data center operation.
- 24 July 2025
- Published by Elsevier in Building and Environment
- Vol. 284
Coordinated integration of hydrogen-enabled multi-energy systems to achieve zero-carbon buildings
- 24 July 2025
- Published by Elsevier in Building and Environment
- Vol. 284
Coordinated integration of hydrogen-enabled multi-energy systems to achieve zero-carbon buildings
- 18 October 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Automation Science and Engineering
- Vol. 20 (3) , 1577-1590
Optimal Planning of Internet Data Centers Decarbonized by Hydrogen-Water-Based Energy Systems
Green and sustainable development of Internet data centers (IDCs) has attracted more attention in both academia and industry. Full utilization of renewable energy sources is widely known as the most effective way to supply electrical and thermal energy while reducing carbon emission. However, the integration of renewable energy into IDCs is still challenging due to the mismatch between uncertain renewable supply and time-varying demand requirements, and high requirement of operation reliability against IDC failures. Therefore, in this paper a hydrogen-water-based energy (HWBE) system is developed and its integrated planning-and-operation problem is formulated as a mixed-integer linear programming problem to determine the optimal capacity of energy facilities in the HWBE system with considering IDC operation reliability. A hybrid physics-based and data-driven method is developed to accurately capture the electrical and thermal energy consumption characteristics and their coupling which are the basis for the optimal planning of the HWBE system. Furthermore, a Benders decomposition-based reliability improvement algorithm is developed to enhance the operation reliability, which decomposes the problem into the planning problem with normal operation as the master problem and the operation problem with IDC failure as the subproblem. The reliability can be enhanced using the solution obtained by the master problem with the feasibility cut obtained from the subproblem. Numerical results show that the developed HWBE system is energy-efficient with low carbon emission, since the power usage efficiency of IDCs could be as low as 1.09 and the carbon emission could be reduced by 74.9% as compared by the electricity-driven IDC energy system. Note to Practitioners —This paper focuses on the integrated planning-and-operation optimization of an HWBE system for the application in IDCs. We improve the energy consumption model of IDCs based on a hybrid physics-based and data-driven method, which can describe the interaction between the dynamic thermal process and electricity consumption of IDCs. In this way, both the high accuracy of the physics-based model and the lower computational effort of the data-driven method could be simultaneously achieved in the energy consumption model. Furthermore, in practice, the optimal planning problem of IDCs is necessary to take into account the operation reliability against data center failures, since the capital expenditure of the backup energy devices is generally significant. This means that a trade-off between the solution accuracy of the planning problem and the computational complexity caused by the operation problem should be considered. Therefore, we develop a Benders decomposition-based reliability improvement algorithm to address the trade-off mentioned above. This technique can integrate the feasibility cut obtained from the operation problem with IDC failure into the planning problem, in order to improve the operation reliability against the supply-demand mismatching and IDC failures while reducing the capital cost, as compared to the system designed by the conventional redundancy standard. Numerical results show the effectiveness of the developed method which can make full use of renewable energy sources and support the green and sustainable development of IDCs.
- 18 October 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Automation Science and Engineering
- Vol. 20 (3) , 1577-1590
Optimal Planning of Internet Data Centers Decarbonized by Hydrogen-Water-Based Energy Systems
Green and sustainable development of Internet data centers (IDCs) has attracted more attention in both academia and industry. Full utilization of renewable energy sources is widely known as the most effective way to supply electrical and thermal energy while reducing carbon emission. However, the integration of renewable energy into IDCs is still challenging due to the mismatch between uncertain renewable supply and time-varying demand requirements, and high requirement of operation reliability against IDC failures. Therefore, in this paper a hydrogen-water-based energy (HWBE) system is developed and its integrated planning-and-operation problem is formulated as a mixed-integer linear programming problem to determine the optimal capacity of energy facilities in the HWBE system with considering IDC operation reliability. A hybrid physics-based and data-driven method is developed to accurately capture the electrical and thermal energy consumption characteristics and their coupling which are the basis for the optimal planning of the HWBE system. Furthermore, a Benders decomposition-based reliability improvement algorithm is developed to enhance the operation reliability, which decomposes the problem into the planning problem with normal operation as the master problem and the operation problem with IDC failure as the subproblem. The reliability can be enhanced using the solution obtained by the master problem with the feasibility cut obtained from the subproblem. Numerical results show that the developed HWBE system is energy-efficient with low carbon emission, since the power usage efficiency of IDCs could be as low as 1.09 and the carbon emission could be reduced by 74.9% as compared by the electricity-driven IDC energy system. Note to Practitioners —This paper focuses on the integrated planning-and-operation optimization of an HWBE system for the application in IDCs. We improve the energy consumption model of IDCs based on a hybrid physics-based and data-driven method, which can describe the interaction between the dynamic thermal process and electricity consumption of IDCs. In this way, both the high accuracy of the physics-based model and the lower computational effort of the data-driven method could be simultaneously achieved in the energy consumption model. Furthermore, in practice, the optimal planning problem of IDCs is necessary to take into account the operation reliability against data center failures, since the capital expenditure of the backup energy devices is generally significant. This means that a trade-off between the solution accuracy of the planning problem and the computational complexity caused by the operation problem should be considered. Therefore, we develop a Benders decomposition-based reliability improvement algorithm to address the trade-off mentioned above. This technique can integrate the feasibility cut obtained from the operation problem with IDC failure into the planning problem, in order to improve the operation reliability against the supply-demand mismatching and IDC failures while reducing the capital cost, as compared to the system designed by the conventional redundancy standard. Numerical results show the effectiveness of the developed method which can make full use of renewable energy sources and support the green and sustainable development of IDCs.