Zhiwei Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhiwei Wang has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Aihui Jiang
College of Geography and Environment, Shandong Normal University, Jinan, China
1 shared publicationGuojian Zhang
School of Surveying and Geo-infomatics, Shandong Jianzhu University, Jinan, China
1 shared publication- Guojian Zhang
School of Surveying and Geo-Informatics, Shandong Jianzhu University, Jinan 250101, China
1 shared publication Jiantao Liu
School of Surveying and Geo-infomatics, Shandong Jianzhu University, Jinan, China
1 shared publicationPeng Wang
Shandong Energy Zaozhuang Mining Group Sanhekou Mining Co. Ltd., Jining, China
1 shared publication- Shengzhen Liu
First Geodetic Survey Team of Natural Resources Department, Xi’an 710054, China
1 shared publication
Latest Publications
- Open Access
- 14 November 2024
- Published by Springer Nature in Scientific Reports
- Vol. 14 (1) , 1-17
Refined subsidence monitoring and dynamic prediction in narrow and long mining areas based on InSAR and probabilistic integral method
Continuous exploitation in mining areas damages the surrounding environment and has various severe geological impacts. Hence, long-term monitoring of mining areas is crucial to reducing these impacts. Differential interferometric synthetic aperture radar (D-InSAR) is widely applied to monitor the subsidence in mining areas, but it cannot obtain accurate large-gradient subsidence result in the centre of the subsidence basin in mining areas due to the de-coherence phenomenon. The probability integral method (PIM) is a prediction method that can cooperate with D-InSAR (D-InSAR PIM, DPIM) to solve the problem. However, with this method, there is early convergence of the edge subsidence in narrow and long mining areas. Moreover, the PIM can only predict the spatial domain; it cannot achieve dynamic prediction. To address the above problems in the traditional DPIM data processing process, in this study, firstly, the traditional PIM was improved by adjusting the radius of the parameter and constructed an improved DPIM (IDPIM) method. The hybrid algorithm was applied to solve the parameters of the IDPIM method and then acquire subsidence results, thus solving the early convergence of edge subsidence problem characteristic of traditional PIM prediction in mining. Additionally, an area-weighting based fusion method was proposed to integrate the IDPIM results and the D-InSAR results (Area-weighting based fusion of the IDPIM and D-InSAR results, AFID) achieving whole-basin refined subsidence in mining areas. Secondly, based on a summary of subsidence laws in mining areas, the Hossfeld model was introduced and combined with the IDPIM method (IDPIM Hossfeld, IDPIM-H) to construct a subsidence dynamic prediction method. This achieved dynamic prediction of the subsidence in mining areas. A coal mine in Ordos was used as the study area, and the feasibility of the IDPIM method, the AFID method and the DPIM-H method was verified through a comparative analysis of leveling data. The results demonstrated that: (1) The results of the IDPIM method showed 8% and 66% improvement in RMSE along the striking and dip lines, respectively, over the D-InSAR results, improving the early convergence of the DPIM along the dip direction of the mine. (2) The results of the AFID method provide a 69% improvement in whole-basin RMSE over the D-InSAR results, which improves the lack of monitoring capacity in the D-InSAR technology center. (3) The results of the DPIM-H method provide a 35% improvement in basin-wide RMSE over the D-InSAR results, solving the problem of low temporal resolution of the D-InSAR technology and realizing the dynamic prediction with high temporal resolution. These findings provide a theoretical basis for future refined exploration of dynamic subsidence in mining areas
- 14 November 2024
- Published by Springer Nature in Scientific Reports
- Vol. 14 (1) , 1-17
Open AccessRefined subsidence monitoring and dynamic prediction in narrow and long mining areas based on InSAR and probabilistic integral method
Continuous exploitation in mining areas damages the surrounding environment and has various severe geological impacts. Hence, long-term monitoring of mining areas is crucial to reducing these impacts. Differential interferometric synthetic aperture radar (D-InSAR) is widely applied to monitor the subsidence in mining areas, but it cannot obtain accurate large-gradient subsidence result in the centre of the subsidence basin in mining areas due to the de-coherence phenomenon. The probability integral method (PIM) is a prediction method that can cooperate with D-InSAR (D-InSAR PIM, DPIM) to solve the problem. However, with this method, there is early convergence of the edge subsidence in narrow and long mining areas. Moreover, the PIM can only predict the spatial domain; it cannot achieve dynamic prediction. To address the above problems in the traditional DPIM data processing process, in this study, firstly, the traditional PIM was improved by adjusting the radius of the parameter and constructed an improved DPIM (IDPIM) method. The hybrid algorithm was applied to solve the parameters of the IDPIM method and then acquire subsidence results, thus solving the early convergence of edge subsidence problem characteristic of traditional PIM prediction in mining. Additionally, an area-weighting based fusion method was proposed to integrate the IDPIM results and the D-InSAR results (Area-weighting based fusion of the IDPIM and D-InSAR results, AFID) achieving whole-basin refined subsidence in mining areas. Secondly, based on a summary of subsidence laws in mining areas, the Hossfeld model was introduced and combined with the IDPIM method (IDPIM Hossfeld, IDPIM-H) to construct a subsidence dynamic prediction method. This achieved dynamic prediction of the subsidence in mining areas. A coal mine in Ordos was used as the study area, and the feasibility of the IDPIM method, the AFID method and the DPIM-H method was verified through a comparative analysis of leveling data. The results demonstrated that: (1) The results of the IDPIM method showed 8% and 66% improvement in RMSE along the striking and dip lines, respectively, over the D-InSAR results, improving the early convergence of the DPIM along the dip direction of the mine. (2) The results of the AFID method provide a 69% improvement in whole-basin RMSE over the D-InSAR results, which improves the lack of monitoring capacity in the D-InSAR technology center. (3) The results of the DPIM-H method provide a 35% improvement in basin-wide RMSE over the D-InSAR results, solving the problem of low temporal resolution of the D-InSAR technology and realizing the dynamic prediction with high temporal resolution. These findings provide a theoretical basis for future refined exploration of dynamic subsidence in mining areas
- Open Access
- 11 November 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (22) , 11468
Dynamic Monitoring of the Standard Penetration of PHC Tubular Piles and Analysis of the Construction Effect Based on Monocular Visual Digital Photography
The penetration of large-diameter tubular piles and their relevant construction effect have significant influences on the bearing capacity of piles and nearby buildings (structures). This study focuses on developing an indoor test model device for the dynamic field monitoring of the construction effect of penetrated large-diameter tubular piles based on monocular visual digital photography. The results show that the relationship between the penetration of the tubular piles and time function (blow counts) changes from a logarithmic function to a linear function when piles penetrate from the loose layer to the sandy layer, and then to the silty soil layer. The penetration rates differ significantly under different formation conditions. There are obvious plugging and squeezing effects as tubular piles penetrate different strata. The plugging effect radiates outward in a rectangular shape. The influence sphere of the squeezing effect is divided into the shear failure zone, radial squeezing zone, and hemispherical expansion zone. According to the measurement data, the squeezing effect increases first and then weakens during the construction of tubular piles. This makes the adjacent pile deviate from the initial position by 17.4 mm, making the next pile deviate from the initial position by 6.4 mm, to the maximum extent. This further verifies the superiority of pile-jumping construction. The research conclusions can provide reasonable suggestions and a reference basis to improve the penetration parameters of tubular piles and optimise their construction techniques.
- 11 November 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (22) , 11468
Open AccessDynamic Monitoring of the Standard Penetration of PHC Tubular Piles and Analysis of the Construction Effect Based on Monocular Visual Digital Photography
The penetration of large-diameter tubular piles and their relevant construction effect have significant influences on the bearing capacity of piles and nearby buildings (structures). This study focuses on developing an indoor test model device for the dynamic field monitoring of the construction effect of penetrated large-diameter tubular piles based on monocular visual digital photography. The results show that the relationship between the penetration of the tubular piles and time function (blow counts) changes from a logarithmic function to a linear function when piles penetrate from the loose layer to the sandy layer, and then to the silty soil layer. The penetration rates differ significantly under different formation conditions. There are obvious plugging and squeezing effects as tubular piles penetrate different strata. The plugging effect radiates outward in a rectangular shape. The influence sphere of the squeezing effect is divided into the shear failure zone, radial squeezing zone, and hemispherical expansion zone. According to the measurement data, the squeezing effect increases first and then weakens during the construction of tubular piles. This makes the adjacent pile deviate from the initial position by 17.4 mm, making the next pile deviate from the initial position by 6.4 mm, to the maximum extent. This further verifies the superiority of pile-jumping construction. The research conclusions can provide reasonable suggestions and a reference basis to improve the penetration parameters of tubular piles and optimise their construction techniques.