Shadrack Samwel Mwaiseje
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Shadrack Samwel Mwaiseje has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Alban Dismas Mchopa
Department of Procurement and Supply Chain Management, Moshi Co-operative University
3 shared publications - Faustine Panga
Department of Procurement and Supply Chain Management Moshi Co-operative University Moshi Tanzania
2 shared publications Faustine Peter Panga
Department of Procurement and Supply Chain Management, Moshi Co-operative University
2 shared publicationsAlban Dismas Mchopa
Department of Procurement and Supply Chain Management, Moshi Co-operative University
1 shared publication- Ismail Abdi Changalima
Department of Business Administration and Management, The University of Dodoma, Dodoma, Tanzania
1 shared publication Mathias Sylvester Nkuhi
Department of Law, Moshi Co-operative University, Moshi, Tanzania
1 shared publication
Latest Publications
- Open Access
- 30 June 2025
- Published by The University of Dodoma in African Business Management Journal
- Vol. 3 (1) , 37-52
Procurement internal control systems and cost-effectiveness in force account construction projects
Public organisations consistently face challenges in achieving cost-effectiveness in construction projects, and this issue remains a global concern. In response to this issue, the present study examines the role of procurement internal control systems on cost-effectiveness in force account (FA) construction projects in local government authorities (LGAs). A cross-sectional research design with a sample size of 318 respondents from selected LGAs in Dodoma, Tanzania was used. Data were collected using a structured questionnaire and analysed using covariance-based structural equation modelling. The findings revealed that attributes of procurement internal control systems that include stock control (β = 0.165, p < 0.015), record keeping (β = 0.355, p < 0.001), authorisation process (β = 0.233, p < 0.002), have significant and positive relationships with cost-effectiveness in FA construction projects. The study’s findings failed to confirm the significant link between the segregation of duties and the cost-effectiveness in FA construction projects (β = 0.094, p < 0.095). These results imply that among the considered procurement internal control systems; segregation of duties does not significantly matter in explaining cost-effectiveness in FA construction projects in LGAs. The study was limited by its geographical context. Therefore, the generalisation of findings should be done with caution because the study relied on the evidence from FA construction projects in primary schools within LGAs in Tanzania. This study provides valuable practical insights for procurement practitioners and members of the FA committee in the public sector. It guides the adherence to the procurement internal control systems to enhance the cost-effectiveness in construction projects.
- 30 June 2025
- Published by The University of Dodoma in African Business Management Journal
- Vol. 3 (1) , 37-52
Open AccessProcurement internal control systems and cost-effectiveness in force account construction projects
Public organisations consistently face challenges in achieving cost-effectiveness in construction projects, and this issue remains a global concern. In response to this issue, the present study examines the role of procurement internal control systems on cost-effectiveness in force account (FA) construction projects in local government authorities (LGAs). A cross-sectional research design with a sample size of 318 respondents from selected LGAs in Dodoma, Tanzania was used. Data were collected using a structured questionnaire and analysed using covariance-based structural equation modelling. The findings revealed that attributes of procurement internal control systems that include stock control (β = 0.165, p < 0.015), record keeping (β = 0.355, p < 0.001), authorisation process (β = 0.233, p < 0.002), have significant and positive relationships with cost-effectiveness in FA construction projects. The study’s findings failed to confirm the significant link between the segregation of duties and the cost-effectiveness in FA construction projects (β = 0.094, p < 0.095). These results imply that among the considered procurement internal control systems; segregation of duties does not significantly matter in explaining cost-effectiveness in FA construction projects in LGAs. The study was limited by its geographical context. Therefore, the generalisation of findings should be done with caution because the study relied on the evidence from FA construction projects in primary schools within LGAs in Tanzania. This study provides valuable practical insights for procurement practitioners and members of the FA committee in the public sector. It guides the adherence to the procurement internal control systems to enhance the cost-effectiveness in construction projects.
- Open Access
- 25 November 2024
- Published by Taylor & Francis in Cogent Engineering
- Vol. 11 (1)
Exploring the nexus between procurement contract administration and quality attainment of force account construction projects in Tanzania
- 25 November 2024
- Published by Taylor & Francis in Cogent Engineering
- Vol. 11 (1)
Open AccessExploring the nexus between procurement contract administration and quality attainment of force account construction projects in Tanzania
- 2 August 2024
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 44 (1) , 91-109
Supply risk management and timely completion of force account construction projects among local government authorities in Dodoma, Tanzania
Purpose: The study’s purpose is to contribute to the supply risk management literature by examining its implications in Tanzania, specifically in the timely completion of force account construction projects in Local Government Authorities (LGAs). Design/methodology/approach: A cross-sectional survey design was employed to gather data from 318 respondents in primary schools within the Dodoma region. A covariance-based structural equation modelling (CB-SEM) structural equation modelling was employed to examine the relationship of the variables. Findings: The study’s findings underscore the crucial role of supply risk management, including multi-sourcing, effective supplier selection, post-qualification of suppliers, and effective communication with suppliers in the timely completion of FA construction projects. Notably, effective supplier selection emerges as the most influential factor, significantly contributing to the timely completion of these projects. Research limitations/implications: The study focused on LGAs in Tanzania. It is important to exercise caution when making broad generalizations about the findings. Also, the study was based on a cross sectional survey design; future research could consider a longitudinal design approach. Practical implications: This study offers practical insights for procurement practitioners and members of the Force Account committee in the public sector, offering guidance on how to improve the management of supply risks and, consequently, enhance the timely completion of construction projects. Originality/value: This study stands out in the literature by examining the implications of supply risk management on the timely completion of force account construction projects in Tanzania. It significantly enriches the existing knowledge of supply risk management, particularly in the context of effective supplier selection in public procurement. These insights are of great value to researchers, practitioners, and policymakers in the field.
- 2 August 2024
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 44 (1) , 91-109
Supply risk management and timely completion of force account construction projects among local government authorities in Dodoma, Tanzania
Purpose: The study’s purpose is to contribute to the supply risk management literature by examining its implications in Tanzania, specifically in the timely completion of force account construction projects in Local Government Authorities (LGAs). Design/methodology/approach: A cross-sectional survey design was employed to gather data from 318 respondents in primary schools within the Dodoma region. A covariance-based structural equation modelling (CB-SEM) structural equation modelling was employed to examine the relationship of the variables. Findings: The study’s findings underscore the crucial role of supply risk management, including multi-sourcing, effective supplier selection, post-qualification of suppliers, and effective communication with suppliers in the timely completion of FA construction projects. Notably, effective supplier selection emerges as the most influential factor, significantly contributing to the timely completion of these projects. Research limitations/implications: The study focused on LGAs in Tanzania. It is important to exercise caution when making broad generalizations about the findings. Also, the study was based on a cross sectional survey design; future research could consider a longitudinal design approach. Practical implications: This study offers practical insights for procurement practitioners and members of the Force Account committee in the public sector, offering guidance on how to improve the management of supply risks and, consequently, enhance the timely completion of construction projects. Originality/value: This study stands out in the literature by examining the implications of supply risk management on the timely completion of force account construction projects in Tanzania. It significantly enriches the existing knowledge of supply risk management, particularly in the context of effective supplier selection in public procurement. These insights are of great value to researchers, practitioners, and policymakers in the field.
- 18 November 2022
- Published by Emerald Publishing in Journal of Applied Research in Higher Education
- Vol. 15 (5) , 1407-1419
Challenges facing procurement and supply professions in Tanzania: higher education students' perceptions
Purpose: Despite the fact that students in higher education contributes significantly to the number of professionals, little has been done to incorporate the students’ perspectives on the status of procurement and supply professions in Tanzania. This study examined the challenges confronting the procurement and supply professions from the perspective of future procurement professionals enrolled in Tanzanian higher education.Design/methodology/approach: A cross-sectional design was used to collect data from undergraduate students majoring in procurement and supply chain management in Tanzanian higher education using a structured questionnaire.Findings: The findings revealed that the challenges affecting the procurement and supply professions were buyer- and supplier-related challenges as perceived by Tanzanian higher education students.Research limitations/implications: The study's findings should be generalized with caution because the findings represent the perspectives of Tanzanian procurement and supply undergraduate business students. Furthermore, the included sample of procurement and supply undergraduates cannot represent all students' perceptions; thus, other studies may broaden the sample by including the opinions of other higher education students.Originality/value: This is the first study that looks at how students in higher education institutions, who are considered future procurement and supply professionals, perceive the challenges of the procurement and supply professions in Tanzania.
- 18 November 2022
- Published by Emerald Publishing in Journal of Applied Research in Higher Education
- Vol. 15 (5) , 1407-1419
Challenges facing procurement and supply professions in Tanzania: higher education students' perceptions
Purpose: Despite the fact that students in higher education contributes significantly to the number of professionals, little has been done to incorporate the students’ perspectives on the status of procurement and supply professions in Tanzania. This study examined the challenges confronting the procurement and supply professions from the perspective of future procurement professionals enrolled in Tanzanian higher education.Design/methodology/approach: A cross-sectional design was used to collect data from undergraduate students majoring in procurement and supply chain management in Tanzanian higher education using a structured questionnaire.Findings: The findings revealed that the challenges affecting the procurement and supply professions were buyer- and supplier-related challenges as perceived by Tanzanian higher education students.Research limitations/implications: The study's findings should be generalized with caution because the findings represent the perspectives of Tanzanian procurement and supply undergraduate business students. Furthermore, the included sample of procurement and supply undergraduates cannot represent all students' perceptions; thus, other studies may broaden the sample by including the opinions of other higher education students.Originality/value: This is the first study that looks at how students in higher education institutions, who are considered future procurement and supply professionals, perceive the challenges of the procurement and supply professions in Tanzania.