Maria Ivone Castanheira
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Maria Ivone Castanheira has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Adelaide Almeida
Department of Applied Sciences and Technologies, Escola Superior Agrária de Beja, Instituto Politécnico de Beja, 7800-309 Beja, Portugal
1 shared publication - Flávia Matias Oliveira da Silva
Department of Applied Technologies and Sciences, School of Agriculture, Polytechnic Institute of Beja (IPBeja), 7800-309 Beja, Portugal
1 shared publication - Isabel Simões
Department of Applied Sciences and Technologies, Polytechnic Institute of Beja, 7800-000 Beja, Portugal
1 shared publication - Karina Santos Silvério
Campus do Instituto Politécnico de Beja, Polytechnic University of Beja, Rua Pedro Soares, Apartado 6155, 7800-295 Beja, Portugal
1 shared publication - Maria José Imaginário
Department of Applied Sciences and Technologies, Polytechnic Institute of Beja, 7800-000 Beja, Portugal
1 shared publication - Mariana Raposo
Department of Applied Sciences and Technologies, Polytechnic Institute of Beja, 7800-000 Beja, Portugal
1 shared publication
Latest Publications
- Open Access
- 18 November 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (22) , 15392
Construction of Control Charts to Help in the Stability and Reliability of Results in an Accredited Water Quality Control Laboratory
Overall, laboratory water quality analysis must have stability in their results, especially in laboratories accredited by ISO 17025. Accredited parameters should be strictly reliable. Using control charts to ascertain divergences between results is thus very useful. The present work applied a methodology of analysis of results through control charts to accurately monitor the results for a wastewater treatment plant. The parameters analyzed were pH, BOD5, COD, total suspended solids, and total phosphorus. The stability of the results was analyzed from the control charts and 30 analyses performed in the last 12 months. From the results, it was possible to observe whether the results are stable, according to the rehabilitation factor that cannot exceed WN = 1.00 and the efficiency of removal of pollutants that remained above 70% for all parameters. The method of determining the technological reliability and stability of the treatment station using control charts is an efficient tool for detecting any instability in the results. These results help to monitor the results of the analyses more clearly and thus enable a rapid response to possible disturbances and maintain the quality of the analysis control, as well as determining the accreditation entities.
- 18 November 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (22) , 15392
Open AccessConstruction of Control Charts to Help in the Stability and Reliability of Results in an Accredited Water Quality Control Laboratory
Overall, laboratory water quality analysis must have stability in their results, especially in laboratories accredited by ISO 17025. Accredited parameters should be strictly reliable. Using control charts to ascertain divergences between results is thus very useful. The present work applied a methodology of analysis of results through control charts to accurately monitor the results for a wastewater treatment plant. The parameters analyzed were pH, BOD5, COD, total suspended solids, and total phosphorus. The stability of the results was analyzed from the control charts and 30 analyses performed in the last 12 months. From the results, it was possible to observe whether the results are stable, according to the rehabilitation factor that cannot exceed WN = 1.00 and the efficiency of removal of pollutants that remained above 70% for all parameters. The method of determining the technological reliability and stability of the treatment station using control charts is an efficient tool for detecting any instability in the results. These results help to monitor the results of the analyses more clearly and thus enable a rapid response to possible disturbances and maintain the quality of the analysis control, as well as determining the accreditation entities.