Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Hong-Jun Lou has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Shadowing effect of an existing tunnel on the evolution of soil arching: impact of tunnel shape

    by Rui-Xiao Zhang, Dong Su, Xing-Tao Lin, Hong-Jun Lou, Xiang-Sheng Chen

    This study evaluates the shadowing effect of existing tunnels on the evolution of soil arching, focusing on the shape of the tunnel (circular and rectangular) through trapdoor experiments. The displacement and shear strain distributions of ground soil resulting from trapdoor movement were estimated using a digital image correlation technique. The results showed that the shadowing effect of the rectangular tunnel was significantly greater than that of the circular tunnel of the same size. The sand above the tunnel was displaced in a double-groove pattern owing to the presence of the tunnel, and the maximum surface settlement occurred between the tunnel boundary and the trapdoor edge. The circular tunnels exhibited consistently higher maximum surface displacements than that in the rectangular tunnels. The shear strain value of soil was lower for the rectangular tunnel case than that for the circular tunnel case. The rectangular tunnels required lesser trapdoor displacement than that of the circular tunnel to obtain the minimum soil arching ratio. The minimum and ultimate soil arching ratios increased as the burial depth ratio increased for both the tunnel shapes. The maximum stress ratio of the tunnel crown was consistently larger for the circular case than for the rectangular case.


  • Open Access

    Study on Railway Subgrade Settlement induced by an Ultra-Large-Diameter Shield Tunnel Crossing under Railway Subgrade

    by Ming Song, Jiguo Liu, Xuetao Wang, Hongjun Lou, Xingtao Lin

    This paper presents a study on the influence of the construction of an ultralarge-diameter shield tunnel undercrossing the existing high-speed railway using the empirical method, numerical analysis method, and geotechnical centrifuge model experiment based on the Wuhan Lianghu Highway Tunnel project. The comparison of the results obtained from the three methods shows first, that the results obtained from the centrifuge model experiment and numerical simulation match well with the results obtained from the empirical method for the worst-case scenario and the most likely scenario, which are consistent with the unfavorable geological and construction conditions modeled in the centrifuge test and the possible geological and construction conditions modeled in numerical simulation. Second, both the results obtained from the numerical method and the centrifuge model experiment show that the asymmetry of the settlement of railway subgrade was induced by a shield tunnel, while the asymmetry of railway subgrade settlement curve is gradually weakening with tunneling. Third, the maximum settlement of the railway subgrade could vary between 20 mm (in the most likely scenario) and 65 mm (in the worst scenario). Both the results from the centrifuge test and the numerical simulation show that the allowed value of maximum differential settlement along the railway subgrade (5 mm/10 m) would be exceeded when the tunnel excavation passes the first track at 10 m. It indicates that some mitigation measures should be taken for controlling the influence of the construction of a shield tunnel, especially when the shield tunnel machine is about underneath the pass railway subgrade. It is suggested that the shield machine should underpass the railway subgrade during the skylight period of railway operation.