Dyala Aljagoub
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Dyala Aljagoub has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Ri Na
Department of Civil, Construction, and Environmental Engineering, University of Delaware, Newark, DE 19716, USA
2 shared publications - Chongsheng Cheng
School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, China
1 shared publication Ri Na
1 shared publicationRyan Webber
1 shared publication- Tianjiao Zhao
Department of Construction Management, College of Engineering & Technology, East Carolina University, Greenville, USA
1 shared publication - Xi Lin
East Carolina University
1 shared publication
Latest Publications
- Open Access
- 30 December 2025
- Published by MDPI AG in Education Sciences
- Vol. 16 (1) , 45
Technology Acceptance and Perceived Learning Outcomes in Construction Surveying Education: A Comparative Analysis Using UTAUT and Bloom’s Taxonomy
Rapid adoption of digital surveying technologies in construction has highlighted the need for engineering education to equip students with technological competency as well as higher-order problem-solving skills. This experiment explores undergraduate students’ acceptance of emerging surveying technologies and their perceived learning results within a constructivist framework of experiential learning. Thirty-six students in a required construction surveying class interacted with traditional and advanced technologies such as total stations, terrestrial laser scanning, drones, and mobile LiDAR through structured, semi-structured, and unstructured lab activities. Data were gathered based on two post-course surveys: a technology acceptance survey grounded in Unified Theory of Acceptance and Use of Technology (UTAUT) and a self-perceived cognitive learning outcome survey through Bloom’s Taxonomy. Qualitative analysis along with quantitative analysis indicated a gap between technology acceptance and perceived learning gains. Laser scanner had the greatest acceptance scores followed by other advanced tools. Total station (widespread in hands-on lab activities) was perceived to have been most influential in terms of enhancing learning. Lower-order skills were strengthened in structured labs, while higher-order thinking emerged more unevenly in open-ended labs. These findings underscore that the mode of student engagement with technology matters more for learning than the sophistication of the tools themselves. By embedding UTAUT and Bloom’s Taxonomy in an authentic learning environment, this experiment provides engineering educators a mechanism to assess technology-enhanced learning and identifies strategies to facilitate higher-order skills aligned with industry needs.
- 30 December 2025
- Published by MDPI AG in Education Sciences
- Vol. 16 (1) , 45
Open AccessTechnology Acceptance and Perceived Learning Outcomes in Construction Surveying Education: A Comparative Analysis Using UTAUT and Bloom’s Taxonomy
Rapid adoption of digital surveying technologies in construction has highlighted the need for engineering education to equip students with technological competency as well as higher-order problem-solving skills. This experiment explores undergraduate students’ acceptance of emerging surveying technologies and their perceived learning results within a constructivist framework of experiential learning. Thirty-six students in a required construction surveying class interacted with traditional and advanced technologies such as total stations, terrestrial laser scanning, drones, and mobile LiDAR through structured, semi-structured, and unstructured lab activities. Data were gathered based on two post-course surveys: a technology acceptance survey grounded in Unified Theory of Acceptance and Use of Technology (UTAUT) and a self-perceived cognitive learning outcome survey through Bloom’s Taxonomy. Qualitative analysis along with quantitative analysis indicated a gap between technology acceptance and perceived learning gains. Laser scanner had the greatest acceptance scores followed by other advanced tools. Total station (widespread in hands-on lab activities) was perceived to have been most influential in terms of enhancing learning. Lower-order skills were strengthened in structured labs, while higher-order thinking emerged more unevenly in open-ended labs. These findings underscore that the mode of student engagement with technology matters more for learning than the sophistication of the tools themselves. By embedding UTAUT and Bloom’s Taxonomy in an authentic learning environment, this experiment provides engineering educators a mechanism to assess technology-enhanced learning and identifies strategies to facilitate higher-order skills aligned with industry needs.
- Open Access
- 30 November 2022
- Published by MDPI AG in Infrastructures
- Vol. 7 (12) , 163
Performance Evaluation of Uncooled UAV Infrared Camera in Detecting Concrete Delamination
Concrete delamination detection using unmanned aerial vehicle (UAV)-mounted infrared cameras has proved effective in recent research. However, most studies used expensive research-grade infrared cameras and proprietary software to acquire images, which is hard to implement in state departments of transportation (DOTs) due to the lack of specialty professionals. Some state DOTs started deploying lightweight UAV-based consumer-grade infrared cameras for delamination detection. Quantitative performance evaluation of such a camera in concrete delamination detection is lacking. To fill this gap, this study intends to conduct a comprehensive assessment of the consumer-grade camera benchmarked against the results of a research-grade camera to see the practicality of using the small and low-cost camera in concrete delamination detection. Data was collected for a slab with mimicked delamination and two in-service bridge decks. For the case of the slab, maximum detectability of 70–72% was achieved. A transient numerical simulation was conducted to provide a supplemental and noise-free dataset to explore detectability accuracy peaks throughout the day. The results of the in-service bridge decks indicated that the consumer-grade infrared camera provided adequate detection of the locations of suspected delamination. Results of both the slab and in-service bridge decks were comparable to those of a research-grade infrared camera.
- 30 November 2022
- Published by MDPI AG in Infrastructures
- Vol. 7 (12) , 163
Open AccessPerformance Evaluation of Uncooled UAV Infrared Camera in Detecting Concrete Delamination
Concrete delamination detection using unmanned aerial vehicle (UAV)-mounted infrared cameras has proved effective in recent research. However, most studies used expensive research-grade infrared cameras and proprietary software to acquire images, which is hard to implement in state departments of transportation (DOTs) due to the lack of specialty professionals. Some state DOTs started deploying lightweight UAV-based consumer-grade infrared cameras for delamination detection. Quantitative performance evaluation of such a camera in concrete delamination detection is lacking. To fill this gap, this study intends to conduct a comprehensive assessment of the consumer-grade camera benchmarked against the results of a research-grade camera to see the practicality of using the small and low-cost camera in concrete delamination detection. Data was collected for a slab with mimicked delamination and two in-service bridge decks. For the case of the slab, maximum detectability of 70–72% was achieved. A transient numerical simulation was conducted to provide a supplemental and noise-free dataset to explore detectability accuracy peaks throughout the day. The results of the in-service bridge decks indicated that the consumer-grade infrared camera provided adequate detection of the locations of suspected delamination. Results of both the slab and in-service bridge decks were comparable to those of a research-grade infrared camera.
- 15 May 2022
- Published by EasyChair in EPiC Series in Built Environment
- Vol. 3, 633-622
Integrating Virtual Reality (VR) Into Construction Engineering and Management (CEM) Courses-A Case Study
Construction projects are spatially and temporally dual-dynamic in nature. One of the technical challenges in teaching the construction process is how to describe the spatial lay- out of construction components. Virtual reality (VR) combined with Building Information Modeling (BIM) technology (BIM-VR) has been adopted in the construction industry for years as a communication tool between stakeholders. The technology can be used to create simulations that allow employees to get an immersive experience of a construction process that has not started, to identify potential problems before construction start, and prepare construction workers for hazards that may occur on construction sites. In this paper, the author reports the findings on evaluating the effectiveness of BIM-VR technology in en- hancing students’ spatial cognition skills of building and construction components. The evaluation was conducted using two different quantitative approaches. First, the before and after scores of students’ spatial cognition skills were measured. The statistics of score changes were used to evaluate the effectiveness of the technology. Then, an assessment was conducted in which a survey was sent to students after completion of the course to gauge their feedback on the effectiveness of the BIM-VR application which had a positive trend.
- 15 May 2022
- Published by EasyChair in EPiC Series in Built Environment
- Vol. 3, 633-622
Integrating Virtual Reality (VR) Into Construction Engineering and Management (CEM) Courses-A Case Study
Construction projects are spatially and temporally dual-dynamic in nature. One of the technical challenges in teaching the construction process is how to describe the spatial lay- out of construction components. Virtual reality (VR) combined with Building Information Modeling (BIM) technology (BIM-VR) has been adopted in the construction industry for years as a communication tool between stakeholders. The technology can be used to create simulations that allow employees to get an immersive experience of a construction process that has not started, to identify potential problems before construction start, and prepare construction workers for hazards that may occur on construction sites. In this paper, the author reports the findings on evaluating the effectiveness of BIM-VR technology in en- hancing students’ spatial cognition skills of building and construction components. The evaluation was conducted using two different quantitative approaches. First, the before and after scores of students’ spatial cognition skills were measured. The statistics of score changes were used to evaluate the effectiveness of the technology. Then, an assessment was conducted in which a survey was sent to students after completion of the course to gauge their feedback on the effectiveness of the BIM-VR application which had a positive trend.