Theo Boujet
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Theo Boujet has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Charles Peroni
LNCMI-Grenoble, CNRS, Grenoble France
2 shared publications - Luc Ronayette
LNCMI-Grenoble, CNRS, Grenoble France
2 shared publications - Pierre Hanoux
LNCMI-Grenoble, CNRS, Grenoble France
2 shared publications - Pierre Pugnat
LNCMI-Grenoble, CNRS, Grenoble France 38042
2 shared publications - Rolf Pfister
Laboratoire National des Champs Magnétiques Intenses (LNCMI), European Magnetic Field Laboratory (EMFL), Université Grenoble-Alpes, CNRS, 38000 Grenoble, France
2 shared publications - Benjamin Vincent
CNRS-LNCMI, Grenoble France
1 shared publication
Latest Publications
- 24 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (4) , 1-5
In-House Industrial Production of the Superconducting Conductor for the 43 T Hybrid Magnet of LNCMI-Grenoble
The hybrid magnet being built at LNCMI-Grenoble is based on the combination of resistive inserts, made of Bitter and polyhelix coils, with a large bore superconducting outsert. It will produce in a first step, an overall continuous magnetic field of 43 T in a 34 mm warm bore aperture. The superconducting coil will provide a nominal magnetic field of 8.5 T in a 1.1 m cold bore diameter. It relies on the novel development of a Nb-Ti/Cu Rutherford Cable On Conduit Conductor (RCOCC) cooled down to 1.8 K by a bath of superfluid helium at 1200 mbar. After a brief recall of the specificity of hybrid magnets, namely the strong electromechanical coupling between resistive and superconducting coils, the main requirements of the RCOCC for efficient and reliable magnet operation, are given. The test and validation phases prior to the industrial production of the RCOCC are reported. The novelty of the RCOCC development concerns the assembly and the induction soft-soldering of the Rutherford cable on the Cu-Ag hollow stabilizer allowing a strict control of the interstrand contact resistance. Studies, developments and the integration of the industrial production line at LNCMI-Grenoble are presented together with the result of the production of all RCOCC unit lengths.
- 24 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (4) , 1-5
In-House Industrial Production of the Superconducting Conductor for the 43 T Hybrid Magnet of LNCMI-Grenoble
The hybrid magnet being built at LNCMI-Grenoble is based on the combination of resistive inserts, made of Bitter and polyhelix coils, with a large bore superconducting outsert. It will produce in a first step, an overall continuous magnetic field of 43 T in a 34 mm warm bore aperture. The superconducting coil will provide a nominal magnetic field of 8.5 T in a 1.1 m cold bore diameter. It relies on the novel development of a Nb-Ti/Cu Rutherford Cable On Conduit Conductor (RCOCC) cooled down to 1.8 K by a bath of superfluid helium at 1200 mbar. After a brief recall of the specificity of hybrid magnets, namely the strong electromechanical coupling between resistive and superconducting coils, the main requirements of the RCOCC for efficient and reliable magnet operation, are given. The test and validation phases prior to the industrial production of the RCOCC are reported. The novelty of the RCOCC development concerns the assembly and the induction soft-soldering of the Rutherford cable on the Cu-Ag hollow stabilizer allowing a strict control of the interstrand contact resistance. Studies, developments and the integration of the industrial production line at LNCMI-Grenoble are presented together with the result of the production of all RCOCC unit lengths.
- 7 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-7
Progress in the Construction of the 43 T Hybrid Magnet at LNCMI-Grenoble
By combining resistive polyhelix and Bitter insert coils with a large bore superconducting outsert one, the hybrid magnet in construction at LNCMI-Grenoble will produce in a first step, an overall continuous magnetic field of 43 T in a 34 mm warm bore aperture. The superconducting coil of 1.1 m cold bore diameter will provide a nominal magnetic field of 8.5 T. It relies on the specific development of the Nb-Ti/Cu Rutherford Cable On Conduit Conductor (RCOCC) cooled down to 1.8 K by a bath of superfluid helium at atmospheric pressure. The novelty of the RCOCC concerns the in-laboratory assembly with induction soft-soldering of the Rutherford cable on a Cu-Ag hollow stabilizer allowing a strict control of the interstrand contact resistance. A stainless steel reinforced copper shield is inserted between the superconducting and resistive coils to reduce the coupling currents induced within the RCOCC as well as the mechanical force exerted on the superconducting coil. After successful thorough reviews of the Grenoble hybrid magnet design anticipating possible upgrades of the maximum field produced, this project is now well engaged in its construction phase. The main specificities of the proposed design are presented together with the project status and the next milestones.
- 7 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-7
Progress in the Construction of the 43 T Hybrid Magnet at LNCMI-Grenoble
By combining resistive polyhelix and Bitter insert coils with a large bore superconducting outsert one, the hybrid magnet in construction at LNCMI-Grenoble will produce in a first step, an overall continuous magnetic field of 43 T in a 34 mm warm bore aperture. The superconducting coil of 1.1 m cold bore diameter will provide a nominal magnetic field of 8.5 T. It relies on the specific development of the Nb-Ti/Cu Rutherford Cable On Conduit Conductor (RCOCC) cooled down to 1.8 K by a bath of superfluid helium at atmospheric pressure. The novelty of the RCOCC concerns the in-laboratory assembly with induction soft-soldering of the Rutherford cable on a Cu-Ag hollow stabilizer allowing a strict control of the interstrand contact resistance. A stainless steel reinforced copper shield is inserted between the superconducting and resistive coils to reduce the coupling currents induced within the RCOCC as well as the mechanical force exerted on the superconducting coil. After successful thorough reviews of the Grenoble hybrid magnet design anticipating possible upgrades of the maximum field produced, this project is now well engaged in its construction phase. The main specificities of the proposed design are presented together with the project status and the next milestones.