Jiaxin Wei
Research Subjects
Jiaxin Wei has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Arash Dahi Taleghani
Department of Energy and Mineral Engineering, Pennsylvania State University, University Park, PA 16802, USA
1 shared publication - Daobing Wang
School of Mechanical Engineering, Beijing Institute of Petrochemical Technology, Beijing 102617, China
1 shared publication - Hai Sun
School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
1 shared publication - Qitao Zhang
Department of Energy and Mineral Engineering, The Pennsylvania State University, University Park, PA 16802, USA
1 shared publication - Wenchao Liu
State Key Laboratory of Offshore Oil and Gas Exploitation, Beijing 100028, China
1 shared publication
Latest Publications
- Open Access
Numerical Simulation Study on Temporary Well Shut-In Methods in the Development of Shale Oil Reservoirs
Field tests indicate that temporary well shut-ins may enhance oil recovery from a shale reservoir; however, there is currently no systematic research to specifically guide such detailed operations in the field, especially for the design of the shut-in scheme and multiple rounds of shut-ins. In this study, the applicability of well shut-in operations for shale oil reservoirs is studied, and a numerical model is built using the finite element method. In order to simulate the production in a shale oil reservoir, two separate modules (i.e., Darcy’s law and phase transport) were two-way coupled together. The established model was validated by comparing its results with the analytical Buckley–Leverett equation. In this paper, the geological background and parameters of a shale oil reservoir in Chang-7 Member (Chenghao, China) were used for the analyses. The simulation results show that temporary well shut-in during production can significantly affect well performance. Implementing well shut-in could decrease the initial oil rate while decreasing the oil decline rate, which is conducive to long-term production. After continuous production for 1000 days, the oil rate with 120 days shut-in was 9.85% larger than the case with no shut-in. Besides, an optimal shut-in time has been identified as 60 days under our modeling conditions. In addition, the potential of several rounds of well shut-in operations was also tested in this study; it is recommended that one or two rounds of shut-ins be performed during development. When two rounds of shut-ins are implemented, it is recommended that the second round shut-in be performed after 300 days of production. In summary, this study reveals the feasibility of temporary well shut-in operations in the development of a shale oil reservoir and provides quantitative guidance to optimize these development scenarios.
Open AccessNumerical Simulation Study on Temporary Well Shut-In Methods in the Development of Shale Oil Reservoirs
Field tests indicate that temporary well shut-ins may enhance oil recovery from a shale reservoir; however, there is currently no systematic research to specifically guide such detailed operations in the field, especially for the design of the shut-in scheme and multiple rounds of shut-ins. In this study, the applicability of well shut-in operations for shale oil reservoirs is studied, and a numerical model is built using the finite element method. In order to simulate the production in a shale oil reservoir, two separate modules (i.e., Darcy’s law and phase transport) were two-way coupled together. The established model was validated by comparing its results with the analytical Buckley–Leverett equation. In this paper, the geological background and parameters of a shale oil reservoir in Chang-7 Member (Chenghao, China) were used for the analyses. The simulation results show that temporary well shut-in during production can significantly affect well performance. Implementing well shut-in could decrease the initial oil rate while decreasing the oil decline rate, which is conducive to long-term production. After continuous production for 1000 days, the oil rate with 120 days shut-in was 9.85% larger than the case with no shut-in. Besides, an optimal shut-in time has been identified as 60 days under our modeling conditions. In addition, the potential of several rounds of well shut-in operations was also tested in this study; it is recommended that one or two rounds of shut-ins be performed during development. When two rounds of shut-ins are implemented, it is recommended that the second round shut-in be performed after 300 days of production. In summary, this study reveals the feasibility of temporary well shut-in operations in the development of a shale oil reservoir and provides quantitative guidance to optimize these development scenarios.