RARazieh Analouei

Razieh Analouei

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Razieh Analouei has a total of 3 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Dynamic Failure Risk Assessment of Wastewater Treatment and Reclamation Plant: An Industrial Case Study

    by Razieh Analouei, Masoud Taheriyoun, Tanjin Amin

    Due to the growing scarcity of water resources, wastewater reuse has become one of the most effective solutions for industrial consumption. However, various factors can detrimentally affect the performance of a wastewater treatment plant (WWTP), which is considered a risk of not fulfilling the effluent requirements. Thus, to ensure the quality of treated wastewater, it is essential to analyze system failure causes and their potential outcomes and mitigation measures through a systematic dynamic risk assessment approach. This work shows how a dynamic Bayesian network (DBN) can be effectively used in this context. Like the conventional Bayesian network (BN), the DBN can capture complex interactions between failure contributory factors. Additionally, it can forecast the upcoming failure likelihood using a prediction inference. This proposed methodology was applied to a WWTP of the Moorchekhort Industrial Complex (MIC), located in the center of Iran. A total of 15 years’ time frame (2016–2030) has been considered in this work. The first six years’ data have been used to develop the DBN model and to identify the crucial risk factors that are further used to reduce the risk in the remaining nine years. The risk increased from 21% to 42% in 2016–2021. Applying the proposed risk mitigation measures can decrease the failure risk from 33% to 9% in 2022–2030. The proposed model showed the capability of the DBN in risk management of a WWTP system which can help WWTPs’ managers and operators achieve better performance for higher reclaimed water quality.


  • Risk assessment of an industrial wastewater treatment and reclamation plant using the bow-tie method

    by Razieh Analouei, Masoud Taheriyoun, Hamid Reza Safavi

    At present, wastewater reuse and recycling in water-stressed countries such as Iran has become a vital option for better management of water scarcity. However, despite the benefits of wastewater reuse, there is a probability of incomplete treatment of wastewater in accordance with the standards. Risk assessment of a wastewater treatment plant is required in order to determine the causes and consequences of failure in the treatment system. Among various methods used for risk assessment, the bow-tie (BT) approach is an efficient technique since it represents a failure event from causes to effects. In this method, for a wastewater treatment plant (WWTP), causes of an adverse event, including the violation of the effluent water quality from the standard limit is studied using fault tree analysis (FTA). Then, the impacts of these adverse events are classified in different scenarios by the use of event tree analysis (ETA). In this study, the BT technique was applied to assess the risk of the WWTP of the Moorchekhort industrial complex (MIC), located in the central part of Iran. The plant consists of two parts, including activated sludge and advanced treatment processes to provide reclaimed water for different industrial uses. Results showed a 41% risk of violation from the effluent standard limit in the MIC WWTP. In addition, analyzing the risk factors revealed that the human error had the largest contribution to the risk calculation of the WWTP failure. In this regard, a number of mitigation measures were proposed to improve the reliability of the WWTP.