MAMuhammad Sharjeel Ali

Muhammad Sharjeel Ali

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Muhammad Sharjeel Ali has a total of 5 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Techno-Economic Analysis of Hybrid Renewable Energy-Based Electricity Supply to Gwadar, Pakistan

    by Muhammad Sharjeel Ali, Syed Umaid Ali, Saeed Mian Qaisar, Asad Waqar, Faheem Haroon, Ahmad Alzahrani

    Gwadar is essential to Pakistan’s financial stability. Being the third deep-water port in Pakistan, it plays a significant role in trade between the Gulf States, Africa, UAE, and CARs. The load shedding of 12–16 h in Gwadar is the most concerning issue due to the non-availability of a utility grid, which is why the Pakistan imports 70 MW of electricity from Iran to fulfill Gwadar’s electricity needs. Gwadar has renewable energy resources that can be utilized for electricity generation. However, wind and solar systems were only installed for limited residential areas. Considering this scenario, a technological and economic analysis was performed using the Hybrid Optimization Model for Multiple Energy Resources (HOMER) software. Three models were considered in this study. Model 1 consisted of photovoltaic (PV) cells, wind turbines, converters, and batteries. Model 2 consisted of PV cells, wind turbines, converters, and a grid. Model 3 consisted of PV cells, wind turbines, converters, and diesel generators. The annual energy generated by Model 1, Model 2, and Model 3 was respectively 57.37 GWh, 81.5 GWh, and 30.4 GWh. The Levelized Cost of Electricity (LCOE) for Model 1, Model 2, and Model 3 was respectively USD 0.401/kWh, USD 0.0347/kWh, and USD 0.184/kWh. The simple payback period of Model 1 was 6.70 years, the simple payback period of Model 2 was 7.77 years and the simple payback period of Model 3 was 4.98 years. Because Model 3 had the lowest Net Present Cost NPC, its payback period was also less than those of the other two. However, Model 2 had the lowest LCOE and its renewable fraction was 73.3%. These facts indicate that Model 2 is the optimal solution.


  • Open Access

    Techno-Economic Analysis of Hybrid Renewable Energy Based Electricity Supply to Gwadar, Pakistan

    by Muhammad Sharjeel Ali, Syed Umaid Ali, Saeed Mian Qaisar, Asad Waqar, Faheem Haroon, Ahmad Alzahrani

    Gwadar is essential for Pakistan's financial stability. The third deep-water port in Pakistan, Gwadar, plays a significant part in trade between the Gulf countries, Africa, China, United Arab Emirates, and Cordillera Administrative Region. However, the load Shedding of 12-16 hours in Gwadar is the most concerning issue. Pakistan imports 70 MW of electricity from Iran. The wind and solar system are already installed but for a limited residential area. In Gwadar, there are enough renewable energy resources that can be utilized for electricity generation. In this context, a Techno and Economic Analysis is performed using the Hybrid Optimization Model for Multiple Energy Resources (HOMER) Pro. Two models are considered for this study. Model-1 includes PV/Wind Turbine/ and Battery while Model-2 consists of PV/Wind Turbine/Converter and Grid. The yearly energy generated by Model-1 and Model-2 is 57.37 GWh and 81.5 GWh, respectively. The levelized cost of electricity (LCOE) for Model-1 and Model-2 is respectively $0.401/kWh and $0.0347/kWh. It is shown that the simple payback of Model-1 is of 6.70 years, and the simple payback of Model-2 is 7.77 years. Due to the high LCOE of Model-1, its payback year is lesser than model-2. All of these facts indicate that Model 2 is the most optimal solution.