Gerardo Acuña
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Gerardo Acuña has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Maritza Liliana Arganis Juárez
Universidad Nacional Autónoma de México-Instituto de Ingeniería, Ciudad de México, México
1 shared publication - Ramón Domínguez
Engineering Institute, National Autonomous University of Mexico, Mexico City 04510, Mexico
1 shared publication - Óscar Arturo Fuentes Mariles
Engineering Institute, School Circuit, Engineering S/N, C.U., National Autonomous University of Mexico, Coyoacán, Mexico City 04510, Mexico
1 shared publication
Latest Publications
- Open Access
- 12 December 2022
- Published by MDPI AG in Electronics
- Vol. 11 (24) , 4139
Optimal Schedule the Operation Policy of a Pumped Energy Storage Plant Case Study Zimapán, México
Pumped-storage hydroelectric plants are an alternative to adapting the energy generation regimen to that of the demand, especially considering that the generation of intermittent clean energy provided by solar and wind power will cause greater differences between these two regimes. In this research, an optimal operation policy is determined through a simulation tool that allows the annual benefits under the energy arbitration service (purchase–sale) to be estimated, considering the variations of the energy price in Mexico. A case study is proposed in the Zimapán hydroelectric facility, where reservoir operation at the hourly level is simulated with records for a period of 3 years, considering historical values. The results establish that this type of pumped storage power plant obtains greater benefits by generating electrical energy during 8 h of high demand and pumping for more than 11 continuous hours in times of low demand. With this configuration, the PHES consumes 82.33 GWh/year more energy than it produces, and the energy generated is 210.83 GWh/year; however, when considering the energy arbitration service, a net income of more than USD 3.25 million per year is identified, which represents a 123.52% increase for the annual energy purchase.
- 12 December 2022
- Published by MDPI AG in Electronics
- Vol. 11 (24) , 4139
Open AccessOptimal Schedule the Operation Policy of a Pumped Energy Storage Plant Case Study Zimapán, México
Pumped-storage hydroelectric plants are an alternative to adapting the energy generation regimen to that of the demand, especially considering that the generation of intermittent clean energy provided by solar and wind power will cause greater differences between these two regimes. In this research, an optimal operation policy is determined through a simulation tool that allows the annual benefits under the energy arbitration service (purchase–sale) to be estimated, considering the variations of the energy price in Mexico. A case study is proposed in the Zimapán hydroelectric facility, where reservoir operation at the hourly level is simulated with records for a period of 3 years, considering historical values. The results establish that this type of pumped storage power plant obtains greater benefits by generating electrical energy during 8 h of high demand and pumping for more than 11 continuous hours in times of low demand. With this configuration, the PHES consumes 82.33 GWh/year more energy than it produces, and the energy generated is 210.83 GWh/year; however, when considering the energy arbitration service, a net income of more than USD 3.25 million per year is identified, which represents a 123.52% increase for the annual energy purchase.